[{"id":"nyiso-queue:1738","entity_name":"1 Gig Data Center East Fishkill, NY","operator_code":"1738","reported_value":1000,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"10-2026","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Dutchess","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":48,"quantity_cell":"E48"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1738:summer","entity_name":"1 Gig Data Center East Fishkill, NY","operator_code":"1738","reported_value":1000,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1738:winter","entity_name":"1 Gig Data Center East Fishkill, NY","operator_code":"1738","reported_value":950,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1715:note7:existing_load","entity_name":"1547 CSR - Orangeburg LLC","operator_code":"1715","reported_value":30,"reported_unit":"MW","kind":"reported_existing_load_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"existing_load","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"existing_as_reported","generator_id":null,"proposed_date_native":null,"classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","1547 CSR Orangeburg name aligns. Source state NJ conflicts with Rockland/Orangeburg NY. No source street or building boundary."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1715:note7:resulting_total_load","entity_name":"1547 CSR - Orangeburg LLC","operator_code":"1715","reported_value":60,"reported_unit":"MW","kind":"reported_resulting_total_load_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"resulting_total_load","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_uprate_as_reported","generator_id":null,"proposed_date_native":null,"classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","1547 CSR Orangeburg name aligns. Source state NJ conflicts with Rockland/Orangeburg NY. No source street or building boundary."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1715:note7:uprate_increment","entity_name":"1547 CSR - Orangeburg LLC","operator_code":"1715","reported_value":30,"reported_unit":"MW","kind":"reported_uprate_increment_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"uprate_increment","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_uprate_as_reported","generator_id":null,"proposed_date_native":null,"classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","1547 CSR Orangeburg name aligns. Source state NJ conflicts with Rockland/Orangeburg NY. No source street or building boundary."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1715","entity_name":"1547 CSR - Orangeburg LLC","operator_code":"1715","reported_value":30,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Accepted Cost Allocation/IA in Progress","generator_id":null,"proposed_date_native":"03-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Rockland","state":"NJ","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","1547 CSR Orangeburg name aligns. Source state NJ conflicts with Rockland/Orangeburg NY. No source street or building boundary.","source state NJ conflicts with Orangeburg Rockland context"],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":30,"quantity_cell":"E30"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1715:summer","entity_name":"1547 CSR - Orangeburg LLC","operator_code":"1715","reported_value":30,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"uprate_increment","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","1547 CSR Orangeburg name aligns. Source state NJ conflicts with Rockland/Orangeburg NY. No source street or building boundary."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1715:winter","entity_name":"1547 CSR - Orangeburg LLC","operator_code":"1715","reported_value":30,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"uprate_increment","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","1547 CSR Orangeburg name aligns. Source state NJ conflicts with Rockland/Orangeburg NY. No source street or building boundary."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-nypa-row-1","subject_id":null,"entity_name":"1547 CSR - Orangeburg, LLC / Orangeburg, NY","operator_code":null,"reported_value":800.0,"reported_unit":"kW","kind":"public_power_allocation","scope":"customer","electrical_extent":"award_program_only","comparison":"exact","upper_value":null,"qualifier":"Recharge New York allocation, not utility service limit or facility design. Name-and-city discovery association only. Two Orangeburg allocation rows remain separate. No building match or sum assumed.","temporal_role":"allocation_as_reported","as_of":"2026-07-01","as_of_basis":"Row data_valid_as_of 7/1/2026.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://data.ny.gov/resource/mkqe-r4dx.json?$limit=50000","title":"nypa_dataset_rows","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:57:34.294195+00:00","sha256":"d22fdb16f42f9987df5576181905ce9d4153541952c2fc100a905229f6da5411","source_family":"public_registry","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-nypa-row-2","subject_id":null,"entity_name":"1547 CSR - Orangeburg, LLC / Orangeburg, NY","operator_code":null,"reported_value":400.0,"reported_unit":"kW","kind":"public_power_allocation","scope":"customer","electrical_extent":"award_program_only","comparison":"exact","upper_value":null,"qualifier":"Recharge New York allocation, not utility service limit or facility design. Name-and-city discovery association only. Two Orangeburg allocation rows remain separate. No building match or sum assumed.","temporal_role":"allocation_as_reported","as_of":"2026-07-01","as_of_basis":"Row data_valid_as_of 7/1/2026.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://data.ny.gov/resource/mkqe-r4dx.json?$limit=50000","title":"nypa_dataset_rows","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:57:34.294195+00:00","sha256":"d22fdb16f42f9987df5576181905ce9d4153541952c2fc100a905229f6da5411","source_family":"public_registry","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"1547:orny1:expansion_generator_mw:planned_expansion","entity_name":"1547 ORNY1","operator_code":null,"reported_value":60,"reported_unit":"MW","kind":"expansion_generator_mw","scope":"planned_second_building_expansion","qualifier":"Operator expansion description; generator capacity explicitly labeled.","quantity_role":"planned_expansion","comparison":null,"season":null,"reported_period":null,"temporal_role":"generator_context","as_of":null,"as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"planned second building expansion at page retrieval","proposed_date_native":"2026","classification":"data_center","classification_basis":"source_native","category":"generator_context","is_default_dc_load_evidence":false,"location_context":{"address":null,"city":"Orangeburg","county":null,"state":"NY","location_precision":"named_operator_campus","planning_area":null,"point_of_interconnection":null,"grid_region":"NYISO"},"unresolved_conflicts":["Do not substitute expansion MW or generator capacity for facility demand.","This is the webpage description, not a reviewed video or evidence of completed construction."],"sources":[{"url":"https://www.1547realty.com/video/1547-orangeburg-data-center-inside-the-orny1-facility/","title":"www.1547realty.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:42:39.336409+00:00","sha256":"4d42aea8489420b8810f20514393f2135aef9d4dd176f3b067faa0d7ef5f141b","source_family":"1547-expansion-video","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"1547:orny1:expansion_power_unspecified_mw:planned_expansion","entity_name":"1547 ORNY1","operator_code":null,"reported_value":30,"reported_unit":"MW","kind":"expansion_power_unspecified_mw","scope":"planned_second_building_expansion","qualifier":"Operator expansion description; 30MW electrical basis is not specified.","quantity_role":"planned_expansion","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":null,"as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"planned second building expansion at page retrieval","proposed_date_native":"2026","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Orangeburg","county":null,"state":"NY","location_precision":"named_operator_campus","planning_area":null,"point_of_interconnection":null,"grid_region":"NYISO"},"unresolved_conflicts":["Do not substitute expansion MW or generator capacity for facility demand.","This is the webpage description, not a reviewed video or evidence of completed construction."],"sources":[{"url":"https://www.1547realty.com/video/1547-orangeburg-data-center-inside-the-orny1-facility/","title":"www.1547realty.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:42:39.336409+00:00","sha256":"4d42aea8489420b8810f20514393f2135aef9d4dd176f3b067faa0d7ef5f141b","source_family":"1547-expansion-video","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"1547:orny1:on_site_power_unspecified_mw:operator_labeled_capacity","entity_name":"1547 ORNY1","operator_code":null,"reported_value":12,"reported_unit":"MW","kind":"on_site_power_unspecified_mw","scope":"facility_power_system_unspecified","qualifier":"Operator native label: 12 MW on-site","quantity_role":"operator_labeled_capacity","comparison":null,"season":null,"reported_period":null,"temporal_role":"power_system_context","as_of":null,"as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"undated live operator page at retrieval","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"power_system_context","is_default_dc_load_evidence":false,"location_context":{"address":null,"city":"Orangeburg","county":null,"state":"NY","location_precision":"named_operator_campus","planning_area":null,"point_of_interconnection":null,"grid_region":"NYISO"},"unresolved_conflicts":["Redundancy, provisioned power and substation capacity do not prove total facility demand.","Different power bases on the same page are not interchangeable."],"sources":[{"url":"https://www.1547realty.com/data-center/orangeburg-new-york-orny1/","title":"www.1547realty.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:42:39.100345+00:00","sha256":"a87d342aacb66f703d9abf7cc16887a71dc7888f7e10dc7f484c157c1a40e861","source_family":"1547-orny1","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"1547:orny1:operator_it_load_mw:operator_labeled_capacity","entity_name":"1547 ORNY1","operator_code":null,"reported_value":1.9,"reported_unit":"MW","kind":"operator_it_load_mw","scope":"named_facility_not_resolved_to_polygon","qualifier":"Operator native label: Critical IT load: 1.9 MW","quantity_role":"operator_labeled_capacity","comparison":null,"season":null,"reported_period":null,"temporal_role":"it_context","as_of":null,"as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"undated live operator page at retrieval","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"it_context","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Orangeburg","county":null,"state":"NY","location_precision":"named_operator_campus","planning_area":null,"point_of_interconnection":null,"grid_region":"NYISO"},"unresolved_conflicts":["Redundancy, provisioned power and substation capacity do not prove total facility demand.","Different power bases on the same page are not interchangeable."],"sources":[{"url":"https://www.1547realty.com/data-center/orangeburg-new-york-orny1/","title":"www.1547realty.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:42:39.100345+00:00","sha256":"a87d342aacb66f703d9abf7cc16887a71dc7888f7e10dc7f484c157c1a40e861","source_family":"1547-orny1","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"1547:orny1:provisioned_power_mw:operator_labeled_capacity","entity_name":"1547 ORNY1","operator_code":null,"reported_value":24,"reported_unit":"MW","kind":"provisioned_power_mw","scope":"facility_power_system_unspecified","qualifier":"Operator native label: 24 MW provisioned in an N+2 scheme","quantity_role":"operator_labeled_capacity","comparison":null,"season":null,"reported_period":null,"temporal_role":"power_system_context","as_of":null,"as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"undated live operator page at retrieval","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"power_system_context","is_default_dc_load_evidence":false,"location_context":{"address":null,"city":"Orangeburg","county":null,"state":"NY","location_precision":"named_operator_campus","planning_area":null,"point_of_interconnection":null,"grid_region":"NYISO"},"unresolved_conflicts":["Redundancy, provisioned power and substation capacity do not prove total facility demand.","Different power bases on the same page are not interchangeable."],"sources":[{"url":"https://www.1547realty.com/data-center/orangeburg-new-york-orny1/","title":"www.1547realty.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:42:39.100345+00:00","sha256":"a87d342aacb66f703d9abf7cc16887a71dc7888f7e10dc7f484c157c1a40e861","source_family":"1547-orny1","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"1547:orny1:substation_capacity_mw:operator_labeled_capacity","entity_name":"1547 ORNY1","operator_code":null,"reported_value":50,"reported_unit":"MW","kind":"substation_capacity_mw","scope":"on_site_substation","qualifier":"Operator native label: On-site substation with 50 MW capacity","quantity_role":"operator_labeled_capacity","comparison":null,"season":null,"reported_period":null,"temporal_role":"power_system_context","as_of":null,"as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"undated live operator page at retrieval","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"power_system_context","is_default_dc_load_evidence":false,"location_context":{"address":null,"city":"Orangeburg","county":null,"state":"NY","location_precision":"named_operator_campus","planning_area":null,"point_of_interconnection":null,"grid_region":"NYISO"},"unresolved_conflicts":["Redundancy, provisioned power and substation capacity do not prove total facility demand.","Different power bases on the same page are not interchangeable."],"sources":[{"url":"https://www.1547realty.com/data-center/orangeburg-new-york-orny1/","title":"www.1547realty.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:42:39.100345+00:00","sha256":"a87d342aacb66f703d9abf7cc16887a71dc7888f7e10dc7f484c157c1a40e861","source_family":"1547-orny1","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-nypa-row-3","subject_id":null,"entity_name":"365 Data Centers NY One LLC / Commack, NY","operator_code":null,"reported_value":2850.0,"reported_unit":"kW","kind":"public_power_allocation","scope":"customer","electrical_extent":"award_program_only","comparison":"exact","upper_value":null,"qualifier":"Recharge New York allocation, not utility service limit or facility design. Name-and-city discovery association only. Two Orangeburg allocation rows remain separate. No building match or sum assumed.","temporal_role":"allocation_as_reported","as_of":"2026-07-01","as_of_basis":"Row data_valid_as_of 7/1/2026.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://data.ny.gov/resource/mkqe-r4dx.json?$limit=50000","title":"nypa_dataset_rows","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:57:34.294195+00:00","sha256":"d22fdb16f42f9987df5576181905ce9d4153541952c2fc100a905229f6da5411","source_family":"public_registry","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1484","entity_name":"580 STAMP load increase","operator_code":"1484","reported_value":300,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Under Construction","generator_id":null,"proposed_date_native":"05-2028","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Genesee","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":17,"quantity_cell":"E17"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1484:summer","entity_name":"580 STAMP load increase","operator_code":"1484","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Nov-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1484:winter","entity_name":"580 STAMP load increase","operator_code":"1484","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Nov-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-7bb3807a1d63b3264d78","entity_name":"AVAIO Pittsburg Data Hub","operator_code":null,"reported_value":71.4,"reported_unit":"MW","kind":"facility_expected_demand","scope":"building","qualifier":"Source explicitly reports this quantity in the design/PUE paragraph; no calculated PUE or utilization adjustment. Average ambient conditions at design IT load.","temporal_role":"proposed","as_of":"2024-02-29","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["The same paragraph reports PUE 1.51 and 1.17, inconsistent with its stated load pairs. Preserve reported loads; no scalar promotion until reviewed."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=254728&DocumentContentId=90356","title":"AVAIO SPPE Application Main Application and Appendix A - PBGF - Part I 297 page(s)","pdf_page":16,"published":"2024-02-29","retrieved_at":"2026-09-16T22:59:49.417339+00:00","sha256":"735898cffae8e436bde6be3aac47275f19e7975c9f28978436f3731d158bff6d","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-fdcfd3e08e7f8d38271a","entity_name":"AVAIO Pittsburg Data Hub","operator_code":null,"reported_value":92,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Source explicitly reports this quantity in the design/PUE paragraph; no calculated PUE or utilization adjustment. ","temporal_role":"proposed","as_of":"2024-02-29","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["The same paragraph reports PUE 1.51 and 1.17, inconsistent with its stated load pairs. Preserve reported loads; no scalar promotion until reviewed."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=254728&DocumentContentId=90356","title":"AVAIO SPPE Application Main Application and Appendix A - PBGF - Part I 297 page(s)","pdf_page":16,"published":"2024-02-29","retrieved_at":"2026-09-16T22:59:49.417339+00:00","sha256":"735898cffae8e436bde6be3aac47275f19e7975c9f28978436f3731d158bff6d","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-e42cdda6241e88c137e9","entity_name":"AVAIO Pittsburg Data Hub","operator_code":null,"reported_value":60,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Source explicitly reports this quantity in the design/PUE paragraph; no calculated PUE or utilization adjustment. ","temporal_role":"proposed","as_of":"2024-02-29","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["The same paragraph reports PUE 1.51 and 1.17, inconsistent with its stated load pairs. Preserve reported loads; no scalar promotion until reviewed."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=254728&DocumentContentId=90356","title":"AVAIO SPPE Application Main Application and Appendix A - PBGF - Part I 297 page(s)","pdf_page":16,"published":"2024-02-29","retrieved_at":"2026-09-16T22:59:49.417339+00:00","sha256":"735898cffae8e436bde6be3aac47275f19e7975c9f28978436f3731d158bff6d","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:06","entity_name":"AWS / Becker, MN","operator_code":null,"reported_value":383,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"TBA","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:city_reported_lot1_service_mva:aws-lot1:2034","entity_name":"AWS Freedom Circle Lot 1","operator_code":null,"reported_value":32,"reported_unit":"MVA","kind":"city_reported_lot1_service_mva","scope":"customer_service_lot","qualifier":"Utility report summarizes assigned AWS service allocation for 2315 Mission College Boulevard.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2034","temporal_role":"load_evidence","as_of":"2024-07-09","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"city_report_summary_of_existing_agreement; reported_agreement_assignment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2315 Mission College Boulevard","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Corroborates original Lot 1 contract; not additive to that schedule."],"sources":[{"url":"https://santaclara.legistar.com/ViewReport.ashx?M=R&N=TextL5&GID=693&ID=23711&GUID=LATEST&Title=Legislation+Text","title":"santaclara.legistar.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T03:21:39.218335+00:00","sha256":"3441adb822cdcbbc5e41df2463fe4bc3db9cad682954b7a34e2718ed91ca71e5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:city_reported_lot1_service_mva:aws-lot1:initial as reported July 9, 2024","entity_name":"AWS Freedom Circle Lot 1","operator_code":null,"reported_value":9,"reported_unit":"MVA","kind":"city_reported_lot1_service_mva","scope":"customer_service_lot","qualifier":"Utility report summarizes assigned AWS service allocation for 2315 Mission College Boulevard.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"initial as reported July 9, 2024","temporal_role":"load_evidence","as_of":"2024-07-09","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"city_report_summary_of_existing_agreement; reported_agreement_assignment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2315 Mission College Boulevard","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Corroborates original Lot 1 contract; not additive to that schedule."],"sources":[{"url":"https://santaclara.legistar.com/ViewReport.ashx?M=R&N=TextL5&GID=693&ID=23711&GUID=LATEST&Title=Legislation+Text","title":"santaclara.legistar.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T03:21:39.218335+00:00","sha256":"3441adb822cdcbbc5e41df2463fe4bc3db9cad682954b7a34e2718ed91ca71e5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_lot1_total_service_mva:aws-lot1:Lot 1 Substation Facilities Energization Date","entity_name":"AWS Freedom Circle Lot 1","operator_code":null,"reported_value":14.0,"reported_unit":"MVA","kind":"original_lot1_total_service_mva","scope":"customer_service_lot","qualifier":"Table E1 Total Available Capacity for Lot 1, not Phase Added Capacity.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"Lot 1 Substation Facilities Energization Date","temporal_role":"load_evidence","as_of":"2021-06-22","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"historical_customer_signed_form_later_city_report_confirms_agreement; customer_signed_city_fields_blank_in_attachment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2315 Mission College Boulevard","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Calendar dates are not inferred from the relative energization schedule. A separate 2024 utility report gives 2034 for 32 MVA.","Lot 2 capacity is TBD. Shared 99 MVA substation equipment is not the entitlement for either lot."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=934ED7C9-8C3F-45C9-90EB-F71DE2207012&ID=9489253&M=F","title":"santaclara.legistar.com","pdf_page":23,"published":null,"retrieved_at":"2026-09-17T03:20:43.029878+00:00","sha256":"d0c2709a9e9cffa287ad557c9f0811d472c63054cde7ca316ebb26713ad118d0","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_lot1_total_service_mva:aws-lot1:Lot 1 Substation Facilities Energization Date + 10 years","entity_name":"AWS Freedom Circle Lot 1","operator_code":null,"reported_value":32.0,"reported_unit":"MVA","kind":"original_lot1_total_service_mva","scope":"customer_service_lot","qualifier":"Table E1 Total Available Capacity for Lot 1, not Phase Added Capacity.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"Lot 1 Substation Facilities Energization Date + 10 years","temporal_role":"load_evidence","as_of":"2021-06-22","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"historical_customer_signed_form_later_city_report_confirms_agreement; customer_signed_city_fields_blank_in_attachment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2315 Mission College Boulevard","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Calendar dates are not inferred from the relative energization schedule. A separate 2024 utility report gives 2034 for 32 MVA.","Lot 2 capacity is TBD. Shared 99 MVA substation equipment is not the entitlement for either lot."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=934ED7C9-8C3F-45C9-90EB-F71DE2207012&ID=9489253&M=F","title":"santaclara.legistar.com","pdf_page":23,"published":null,"retrieved_at":"2026-09-17T03:20:43.029878+00:00","sha256":"d0c2709a9e9cffa287ad557c9f0811d472c63054cde7ca316ebb26713ad118d0","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_lot1_total_service_mva:aws-lot1:Lot 1 Substation Facilities Energization Date + 15 years","entity_name":"AWS Freedom Circle Lot 1","operator_code":null,"reported_value":40.0,"reported_unit":"MVA","kind":"original_lot1_total_service_mva","scope":"customer_service_lot","qualifier":"Table E1 Total Available Capacity for Lot 1, not Phase Added Capacity.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"Lot 1 Substation Facilities Energization Date + 15 years","temporal_role":"load_evidence","as_of":"2021-06-22","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"historical_customer_signed_form_later_city_report_confirms_agreement; customer_signed_city_fields_blank_in_attachment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2315 Mission College Boulevard","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Calendar dates are not inferred from the relative energization schedule. A separate 2024 utility report gives 2034 for 32 MVA.","Lot 2 capacity is TBD. Shared 99 MVA substation equipment is not the entitlement for either lot."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=934ED7C9-8C3F-45C9-90EB-F71DE2207012&ID=9489253&M=F","title":"santaclara.legistar.com","pdf_page":23,"published":null,"retrieved_at":"2026-09-17T03:20:43.029878+00:00","sha256":"d0c2709a9e9cffa287ad557c9f0811d472c63054cde7ca316ebb26713ad118d0","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_lot1_total_service_mva:aws-lot1:Lot 1 Substation Facilities Energization Date + 20 years","entity_name":"AWS Freedom Circle Lot 1","operator_code":null,"reported_value":49.5,"reported_unit":"MVA","kind":"original_lot1_total_service_mva","scope":"customer_service_lot","qualifier":"Table E1 Total Available Capacity for Lot 1, not Phase Added Capacity.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"Lot 1 Substation Facilities Energization Date + 20 years","temporal_role":"load_evidence","as_of":"2021-06-22","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"historical_customer_signed_form_later_city_report_confirms_agreement; customer_signed_city_fields_blank_in_attachment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2315 Mission College Boulevard","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Calendar dates are not inferred from the relative energization schedule. A separate 2024 utility report gives 2034 for 32 MVA.","Lot 2 capacity is TBD. Shared 99 MVA substation equipment is not the entitlement for either lot."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=934ED7C9-8C3F-45C9-90EB-F71DE2207012&ID=9489253&M=F","title":"santaclara.legistar.com","pdf_page":23,"published":null,"retrieved_at":"2026-09-17T03:20:43.029878+00:00","sha256":"d0c2709a9e9cffa287ad557c9f0811d472c63054cde7ca316ebb26713ad118d0","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_lot1_total_service_mva:aws-lot1:Lot 1 Substation Facilities Energization Date + 5 years","entity_name":"AWS Freedom Circle Lot 1","operator_code":null,"reported_value":23.0,"reported_unit":"MVA","kind":"original_lot1_total_service_mva","scope":"customer_service_lot","qualifier":"Table E1 Total Available Capacity for Lot 1, not Phase Added Capacity.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"Lot 1 Substation Facilities Energization Date + 5 years","temporal_role":"load_evidence","as_of":"2021-06-22","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"historical_customer_signed_form_later_city_report_confirms_agreement; customer_signed_city_fields_blank_in_attachment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2315 Mission College Boulevard","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Calendar dates are not inferred from the relative energization schedule. A separate 2024 utility report gives 2034 for 32 MVA.","Lot 2 capacity is TBD. Shared 99 MVA substation equipment is not the entitlement for either lot."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=934ED7C9-8C3F-45C9-90EB-F71DE2207012&ID=9489253&M=F","title":"santaclara.legistar.com","pdf_page":23,"published":null,"retrieved_at":"2026-09-17T03:20:43.029878+00:00","sha256":"d0c2709a9e9cffa287ad557c9f0811d472c63054cde7ca316ebb26713ad118d0","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_lot1_total_service_mva:aws-lot1:Substation Agreement Date","entity_name":"AWS Freedom Circle Lot 1","operator_code":null,"reported_value":9.0,"reported_unit":"MVA","kind":"original_lot1_total_service_mva","scope":"customer_service_lot","qualifier":"Table E1 Total Available Capacity for Lot 1, not Phase Added Capacity.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"Substation Agreement Date","temporal_role":"load_evidence","as_of":"2021-06-22","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"historical_customer_signed_form_later_city_report_confirms_agreement; customer_signed_city_fields_blank_in_attachment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2315 Mission College Boulevard","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Calendar dates are not inferred from the relative energization schedule. A separate 2024 utility report gives 2034 for 32 MVA.","Lot 2 capacity is TBD. Shared 99 MVA substation equipment is not the entitlement for either lot."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=934ED7C9-8C3F-45C9-90EB-F71DE2207012&ID=9489253&M=F","title":"santaclara.legistar.com","pdf_page":23,"published":null,"retrieved_at":"2026-09-17T03:20:43.029878+00:00","sha256":"d0c2709a9e9cffa287ad557c9f0811d472c63054cde7ca316ebb26713ad118d0","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:08","entity_name":"AWS* / New Carlisle, Indiana","operator_code":null,"reported_value":660,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"TBA","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1751:summer","entity_name":"Alcoa East Energy Allocation Project","operator_code":"1751","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jul-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1751:winter","entity_name":"Alcoa East Energy Allocation Project","operator_code":"1751","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jul-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::aligned-house-backup","entity_name":"Aligned PDX01 source 34-0336","operator_code":null,"reported_value":1,"reported_unit":"MWe","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":1,"qualifier":"One proposed house standby generator. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","2024 report identifies 4705 NE 30th, unlike the candidate point address 4590 NE Sewell. Forty-two 3 MWe main units and one 1 MWe house unit are proposed. No gross facility capacity or exact building geometry is established by these ratings."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0336-ST-01_RR_2024.PDF","title":"deqonline.deq.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-16T22:29:44.294084+00:00","sha256":"75723a4b12621bc46f2bffa637d7862429b800d78427137349ab2881aae4342c","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::aligned-main-backup","entity_name":"Aligned PDX01 source 34-0336","operator_code":null,"reported_value":3,"reported_unit":"MWe","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":42,"qualifier":"Forty-two proposed main standby generators. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","2024 report identifies 4705 NE 30th, unlike the candidate point address 4590 NE Sewell. Forty-two 3 MWe main units and one 1 MWe house unit are proposed. No gross facility capacity or exact building geometry is established by these ratings."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0336-ST-01_RR_2024.PDF","title":"deqonline.deq.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-16T22:29:44.294084+00:00","sha256":"75723a4b12621bc46f2bffa637d7862429b800d78427137349ab2881aae4342c","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:01","entity_name":"Amazon – 3 Data Centers / Madison County, Mississippi","operator_code":null,"reported_value":1034,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_three_data_centers_aggregate","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_three_data_centers_aggregate","generator_id":null,"proposed_date_native":"2027","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":1,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-nypa-row-0","subject_id":null,"entity_name":"Ancotel USA, LLC / Westbury, NY","operator_code":null,"reported_value":216.0,"reported_unit":"kW","kind":"public_power_allocation","scope":"customer","electrical_extent":"award_program_only","comparison":"exact","upper_value":null,"qualifier":"Recharge New York allocation, not utility service limit or facility design. Name-and-city discovery association only. Two Orangeburg allocation rows remain separate. No building match or sum assumed.","temporal_role":"allocation_as_reported","as_of":"2026-07-01","as_of_basis":"Row data_valid_as_of 7/1/2026.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://data.ny.gov/resource/mkqe-r4dx.json?$limit=50000","title":"nypa_dataset_rows","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:57:34.294195+00:00","sha256":"d22fdb16f42f9987df5576181905ce9d4153541952c2fc100a905229f6da5411","source_family":"public_registry","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:58264:FC1:retired-and-canceled","entity_name":"Apple Data Center - Fuel Cell 1&2","operator_code":"58264","reported_value":5,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"FC1","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"5977 Startown Road","city":"Maiden","county":"Catawba","state":"NC","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":5107,"quantity_cell":"P5107"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:58264:FC2:retired-and-canceled","entity_name":"Apple Data Center - Fuel Cell 1&2","operator_code":"58264","reported_value":5.5,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"FC2","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"5977 Startown Road","city":"Maiden","county":"Catawba","state":"NC","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":5108,"quantity_cell":"P5108"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:58701:PV2:operable","entity_name":"Apple Data Center - PV2","operator_code":"58701","reported_value":20,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"PV2","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"3720 Lai Ber Drive","city":"Conover","county":"Catawba","state":"NC","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal.","Conover solar plant has a different address from Maiden data-center campus. Do not join by Apple name alone."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16558,"quantity_cell":"P16558"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:57994:PV1:operable","entity_name":"Apple Data Center PV","operator_code":"57994","reported_value":21,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OA: Out of service – was not used for some or all of the reporting period but is expected to be returned to service in the next calendar year.","generator_id":"PV1","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"5977 Startown Road","city":"Maiden","county":"Catawba","state":"NC","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":15539,"quantity_cell":"P15539"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59474:DCPV3:operable","entity_name":"Apple Data Center PV3","operator_code":"59474","reported_value":17.5,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"DCPV3","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"3123 Kelly Blvd","city":"Conover","county":"Catawba","state":"NC","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal.","Conover solar plant has a different address from Maiden data-center campus. Do not join by Apple name alone."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17421,"quantity_cell":"P17421"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-185db2963a12e2ec356c","entity_name":"Apple Tracy Technology campus","operator_code":null,"reported_value":100,"reported_unit":"MW","kind":"contracted_service","scope":"campus","qualifier":"Utility testimony identifies executed September 12 2016 Apple agreement 14-00046 for 100 MW.","temporal_role":"historical","as_of":"2016-09-12","as_of_basis":"Explicit execution date in utility testimony","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://cdx-tst.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/recent-regulatory-filings/north/grc/electric/SPPC-Elec-2019-GRC-Vol-05.pdf","title":"cdx-tst.nvenergy.com","pdf_page":105,"published":null,"retrieved_at":"2026-09-17T02:21:47.674226+00:00","sha256":"07f01ce1303a19422ff576b962a865d40032c23dbf15a4a872342b0a48ee6aa1","source_family":"utility_filing","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-2be65a47b76f67a9653a","entity_name":"Apple Tracy Technology campus","operator_code":null,"reported_value":250,"reported_unit":"MW","kind":"requested_service","scope":"campus","qualifier":"Apple future customer-owned substation proposal for an additional 250 MW; service plan not finalized.","temporal_role":"historical","as_of":"2019-05-31","as_of_basis":"May 31 2019 utility sworn filing; quantities are historical, not current contracts.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://cdx-tst.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/recent-regulatory-filings/north/grc/electric/SPPC-Elec-2019-GRC-Vol-05.pdf","title":"cdx-tst.nvenergy.com","pdf_page":138,"published":null,"retrieved_at":"2026-09-17T02:21:47.674226+00:00","sha256":"07f01ce1303a19422ff576b962a865d40032c23dbf15a4a872342b0a48ee6aa1","source_family":"utility_filing","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-80ecdb2bba9cb95222b1","entity_name":"Apple Tracy Technology campus","operator_code":null,"reported_value":130,"reported_unit":"MW","kind":"requested_service","scope":"campus","qualifier":"Apple existing 100 MW agreement being amended for total 130 MW. Source does not establish completed amendment.","temporal_role":"historical","as_of":"2019-05-31","as_of_basis":"May 31 2019 utility sworn filing; quantities are historical, not current contracts.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://cdx-tst.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/recent-regulatory-filings/north/grc/electric/SPPC-Elec-2019-GRC-Vol-05.pdf","title":"cdx-tst.nvenergy.com","pdf_page":138,"published":null,"retrieved_at":"2026-09-17T02:21:47.674226+00:00","sha256":"07f01ce1303a19422ff576b962a865d40032c23dbf15a4a872342b0a48ee6aa1","source_family":"utility_filing","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-a021a3655ae8063f715e","entity_name":"Applied Digital Polaris Forge 1 Building 1","operator_code":null,"reported_value":100,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Individual building label on PF1 lease slide explicitly headed Contracted Critical IT Load; cooling and supporting infrastructure excluded by definition on page 23","temporal_role":"reported_current","as_of":"2026-04-23","as_of_basis":"primary dated filing or release","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":31,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":31,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":23,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":24,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-70582786af6371ed95dd","entity_name":"Applied Digital Polaris Forge 1 Building 2","operator_code":null,"reported_value":150,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Individual building label on PF1 lease slide explicitly headed Contracted Critical IT Load; cooling and supporting infrastructure excluded by definition on page 23","temporal_role":"contracted","as_of":"2026-04-23","as_of_basis":"primary dated filing or release","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":31,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":31,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":23,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-dbbd0b1d692d6dcd7441","entity_name":"Applied Digital Polaris Forge 1 Building 2 Phase 1","operator_code":null,"reported_value":75,"reported_unit":"MW","kind":"untyped_power","scope":"phase","qualifier":"Release calls this operational AI capacity, with campus critical IT context. Held untyped until phase-specific definition confirmed.","temporal_role":"reported_current","as_of":"2026-07-01","as_of_basis":"primary dated filing or release","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1","title":"Applied Digital Delivers Second Building at Polaris Forge 1 :: Applied Digital Corporation (APLD)","pdf_page":null,"published":"2026-07-01","retrieved_at":"2026-09-17T01:55:35.416744+00:00","sha256":"c3bc3fb2cf33f34890f94ed0712e3544fadcb5b20aa4da1f58e12cd10e8d0d45","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-34a3dce1bf6bae4700cf","entity_name":"Applied Digital Polaris Forge 1 Building 3","operator_code":null,"reported_value":150,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Individual building label on PF1 lease slide explicitly headed Contracted Critical IT Load; cooling and supporting infrastructure excluded by definition on page 23","temporal_role":"contracted","as_of":"2026-04-23","as_of_basis":"primary dated filing or release","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":31,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":31,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":23,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-6709de90fab4ef438eae","entity_name":"Applied Digital Polaris Forge 1 campus","operator_code":null,"reported_value":400,"reported_unit":"MW","kind":"it_critical","scope":"campus","qualifier":"Campus contracted critical IT load; no division across buildings","temporal_role":"contracted","as_of":"2026-04-23","as_of_basis":"primary dated filing or release","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000036/0001144879-26-000036.pdf","title":"ir.applieddigital.com","pdf_page":31,"published":"2026-04-23","retrieved_at":"2026-09-17T01:55:36.060909+00:00","sha256":"1995dc6971b5551478c9220991f1aa9f9731075f5744e319323a1cd89501be31","source_family":"operator_sec_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power03::nfpr03-mdu-ellendale-full","subject_id":null,"entity_name":"Applied Digital data center near Ellendale served from March 2023, exact facility unresolved","operator_code":null,"reported_value":180,"reported_unit":"MW","kind":"electricity_requirement","scope":"facility_unresolved","electrical_extent":"historical_facility_not_linked_to_polaris_forge_1","comparison":"exact","upper_value":null,"qualifier":"180 MW is the full-capacity requirement for the data center whose service began in March 2023. Same city does not establish Polaris Forge 1 membership. Original accepted-campus claim rejected; no record ID association.","temporal_role":"full_capacity_requirement_reported_in_dated_filing","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/67716/000006771626000050/mdu-20260331.htm","title":"mdu-q1-2026","pdf_page":null,"published":"2026-05-07","retrieved_at":"2026-09-18T03:52:37.284129+00:00","sha256":"5fa3e9e1bd2ea6518ac86b1b52beaefdad0bf88a2ad9be48dde92a11ae1d3114","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Operating discussion, printed page 34: existing Ellendale and additional regional load","text_lines_1_based":[5102,5102],"text_character_span":[134400,135101],"normalized_text_character_span":[134394,135095]}],"text_sha256":"ef7d141b4673e59c6993e58ccfd6bc5792161e3a54ad5cc723e82632f4134dda","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-05-07","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-05-07","sec_filing_date":"2026-05-07","document_period_end":"2026-03-31","event_dates":[{"date":"2023-03","precision":"month","role":"service_commenced_for_referenced_data_center","quantity_effective_date":false}],"forecast_target_period":null,"non_additive_group":"mdu-historical-and-additional-load-no-sum","identity_state":"unresolved_no_record_association","correction_ids":["C04-mdu-report-event-forecast-date-separation","C03-ellendale180-no-polaris-association"],"source_observation_id":"nfpr03-mdu-ellendale-full","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"nyiso-queue:1730","entity_name":"Arsenal Data Site 1000","operator_code":"1730","reported_value":467,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"05-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":41,"quantity_cell":"E41"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1730:summer","entity_name":"Arsenal Data Site 1000","operator_code":"1730","reported_value":467,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Mar-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1730:winter","entity_name":"Arsenal Data Site 1000","operator_code":"1730","reported_value":467,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Mar-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1728","entity_name":"Arsenal Data Site 250","operator_code":"1728","reported_value":233,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"10-2028","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":39,"quantity_cell":"E39"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1728:summer","entity_name":"Arsenal Data Site 250","operator_code":"1728","reported_value":233,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Mar-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1728:winter","entity_name":"Arsenal Data Site 250","operator_code":"1728","reported_value":233,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Mar-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1729","entity_name":"Arsenal Data Site 500","operator_code":"1729","reported_value":233,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"08-2028","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":40,"quantity_cell":"E40"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1729:summer","entity_name":"Arsenal Data Site 500","operator_code":"1729","reported_value":233,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Mar-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1729:winter","entity_name":"Arsenal Data Site 500","operator_code":"1729","reported_value":233,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Mar-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2023-0031:1","entity_name":"Auto World Loudoun","operator_code":"DOM-2023-0031","reported_value":26,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"summer","reported_period":"initial","temporal_role":"dated_load_record","as_of":"2026-04-07","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old requested 2026-06-15 struck through; new 2027-12-17. Not a measured campus demand.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260407/20260407-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":9,"published":"2026-04-07","retrieved_at":"2026-09-17T01:44:08.334712+00:00","sha256":"bd83050e6d2f294d432e871a3bcedfd3574ff6489ea54094d073b6e1118076b0","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2023-0031:2","entity_name":"Auto World Loudoun","operator_code":"DOM-2023-0031","reported_value":0,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"winter","reported_period":"initial","temporal_role":"dated_load_record","as_of":"2026-04-07","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old requested 2026-06-15 struck through; new 2027-12-17. Not a measured campus demand.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260407/20260407-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":9,"published":"2026-04-07","retrieved_at":"2026-09-17T01:44:08.334712+00:00","sha256":"bd83050e6d2f294d432e871a3bcedfd3574ff6489ea54094d073b6e1118076b0","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2023-0031:3","entity_name":"Auto World Loudoun","operator_code":"DOM-2023-0031","reported_value":282.6,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"summer","reported_period":"2030","temporal_role":"dated_load_record","as_of":"2026-04-07","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old requested 2026-06-15 struck through; new 2027-12-17. Not a measured campus demand.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260407/20260407-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":9,"published":"2026-04-07","retrieved_at":"2026-09-17T01:44:08.334712+00:00","sha256":"bd83050e6d2f294d432e871a3bcedfd3574ff6489ea54094d073b6e1118076b0","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2023-0031:4","entity_name":"Auto World Loudoun","operator_code":"DOM-2023-0031","reported_value":78.1,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"winter","reported_period":"2030","temporal_role":"dated_load_record","as_of":"2026-04-07","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old requested 2026-06-15 struck through; new 2027-12-17. Not a measured campus demand.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260407/20260407-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":9,"published":"2026-04-07","retrieved_at":"2026-09-17T01:44:08.334712+00:00","sha256":"bd83050e6d2f294d432e871a3bcedfd3574ff6489ea54094d073b6e1118076b0","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-bnl725","entity_name":"BNL Building 725","operator_code":null,"reported_value":3.6,"reported_unit":"MW","kind":"it_critical","scope":"named_building_location_unresolved","qualifier":"The June 27, 2022 presentation reports 3.6 MW of delivered IT power protected by UPS in Building 725. Its precise building location still needs verification.","comparison":null,"temporal_role":"delivered_it","as_of":"2022-06-27","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://indico.bnl.gov/event/16189/contributions/64847/attachments/41765/69963/Data%20Center%20Operations%20%26%20Networking.pdf","title":"indico.bnl.gov","pdf_page":6,"published":null,"retrieved_at":"2026-09-17T11:56:58.342766+00:00","sha256":"c676478f0159773254bc0991138f15674dee925c0fac8e8c877255e429d5b574","source_family":"public_registry","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0078:1","entity_name":"Barrister Loudoun","operator_code":"DOM-2025-0078","reported_value":290,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"expected load","temporal_role":"dated_load_record","as_of":"2026-01-06","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested 2029-05-31; existing substation, two additional transformers.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260106/20260106-item-07---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":5,"published":"2026-01-06","retrieved_at":"2026-09-17T01:44:51.852353+00:00","sha256":"2f238764129e7df2ba1fbc7af464705ef0354973d8fcb1ba49a4350e86f31060","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"regional:panther-esa","subject_id":"regional:panther","entity_name":"Bitfarms / Keel Panther Creek","operator_code":null,"reported_value":350,"reported_unit":"MW","kind":"customer_reported_contracted_capacity","source_metric":"panther-esa","scope":"customer_campus","qualifier":"Customer reports 350 MW of contracted firm power under ESA with PPL.","quantity_role":"customer_reported_contracted_capacity","comparison":"equal","season":null,"reported_period":"as of March 27, 2026","temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer_annual_report","execution_status":"executed_esa_reported_by_customer_not_captured","nonadditive_group":"panther-campus","classification":"bitcoin_mining_transition_to_hpc","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Nesquehoning","state":"PA","location_precision":"named_locality"},"unresolved_conflicts":["Customer annual report states ESA executed. Executed utility agreement itself not captured.","Site was used for Bitcoin mining at the report date, with HPC development proposed. Campus entitlement is not IT MW.","The 50 MW and 300 MW delivery portions belong to this 350 MW total.","Current 60 MW energized entry is excluded from secured gross by the issuer.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":17,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-panther","note":"Public filings link Carbon Node East Development, Panther Creek and Keel. The address 4 Dennison Road identifies the legacy generating plant and the project applicant. It does not identify a future compute building.","scope":"legacy_plant_address_and_proposed_campus_entity","sources":[{"url":"https://files.dep.state.pa.us/RegionalResources/NERO/NEROPortalFiles/CommunityInformation/Panther_Creek/Panther%20Creek%20TDF%20Plan%20Approval%20Application13-00003B.pdf","title":"files.dep.state.pa.us","pdf_page":11,"published":null,"retrieved_at":"2026-09-17T04:39:07.141914+00:00","sha256":"76be20eed1ed50e72eea18b3e7b9aaf3467e31a1f8ee6405a15178dfc97ba59d","source_family":"public_primary_identity_source","as_of":null},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2026-03-27"},{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-29/56-29.pdf","title":"www.pacodeandbulletin.gov","pdf_page":31,"published":"2026-07-18","retrieved_at":"2026-09-17T04:53:13.247906+00:00","sha256":"4ffcb24ab1c8977960ba201b8e20fb2e1dd72bc345b807ffea6676ba2bcf05c6","source_family":"regulatory_notice","as_of":null},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":315,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2025-12-31"}]}],"status_updates":[{"id":"regional-identity:panther-august-status","note":"Keel reported that Bitcoin mining stopped at this campus on June 29, 2026. Its August 10 filing states that HPC data-center operations had not started here as of August 7, 2026. Operation after that date is not established by this source.","scope":"named_campus","sources":[{"url":"https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a","title":"ir.keelinfra.com","pdf_page":59,"published":"2026-08-10","retrieved_at":"2026-09-17T04:48:30.286530+00:00","sha256":"8b708f35f3e894bf0857cdbc86c9ec14144b553723966f2a16f8c0f2abb7f860","source_family":"public_primary_identity_source","as_of":"2026-08-07"}],"bitcoin_mining_ceased":"2026-06-29","hpc_operation_as_of":"2026-08-07","hpc_operating":false}],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:panther-energized","subject_id":"regional:panther","entity_name":"Bitfarms / Keel Panther Creek","operator_code":null,"reported_value":60,"reported_unit":"MW","kind":"energized_capacity","source_metric":"panther-energized","scope":"customer_campus","qualifier":"Issuer table Current Energized Capacity, with not-under-ESA footnote.","quantity_role":"energized_capacity","comparison":"equal","season":null,"reported_period":"as of March 27, 2026","temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer_reported_energized_capacity","execution_status":"not_under_esa_explicit_footnote","nonadditive_group":"panther-campus","classification":"bitcoin_mining_transition_to_hpc","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Nesquehoning","state":"PA","location_precision":"named_locality"},"unresolved_conflicts":["Energized capacity is not metered demand, secured utility import or IT MW.","Do not add this to the 350 MW secured gross total. Mining operations and HPC conversion remain distinct.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":16,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-panther","note":"Public filings link Carbon Node East Development, Panther Creek and Keel. The address 4 Dennison Road identifies the legacy generating plant and the project applicant. It does not identify a future compute building.","scope":"legacy_plant_address_and_proposed_campus_entity","sources":[{"url":"https://files.dep.state.pa.us/RegionalResources/NERO/NEROPortalFiles/CommunityInformation/Panther_Creek/Panther%20Creek%20TDF%20Plan%20Approval%20Application13-00003B.pdf","title":"files.dep.state.pa.us","pdf_page":11,"published":null,"retrieved_at":"2026-09-17T04:39:07.141914+00:00","sha256":"76be20eed1ed50e72eea18b3e7b9aaf3467e31a1f8ee6405a15178dfc97ba59d","source_family":"public_primary_identity_source","as_of":null},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2026-03-27"},{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-29/56-29.pdf","title":"www.pacodeandbulletin.gov","pdf_page":31,"published":"2026-07-18","retrieved_at":"2026-09-17T04:53:13.247906+00:00","sha256":"4ffcb24ab1c8977960ba201b8e20fb2e1dd72bc345b807ffea6676ba2bcf05c6","source_family":"regulatory_notice","as_of":null},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":315,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2025-12-31"}]}],"status_updates":[{"id":"regional-identity:panther-august-status","note":"Keel reported that Bitcoin mining stopped at this campus on June 29, 2026. Its August 10 filing states that HPC data-center operations had not started here as of August 7, 2026. Operation after that date is not established by this source.","scope":"named_campus","sources":[{"url":"https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a","title":"ir.keelinfra.com","pdf_page":59,"published":"2026-08-10","retrieved_at":"2026-09-17T04:48:30.286530+00:00","sha256":"8b708f35f3e894bf0857cdbc86c9ec14144b553723966f2a16f8c0f2abb7f860","source_family":"public_primary_identity_source","as_of":"2026-08-07"}],"bitcoin_mining_ceased":"2026-06-29","hpc_operation_as_of":"2026-08-07","hpc_operating":false}],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:panther-2026-portion","subject_id":"regional:panther","entity_name":"Bitfarms / Keel Panther Creek","operator_code":null,"reported_value":50,"reported_unit":"MW","kind":"scheduled_increment","source_metric":"panther-2026-portion","scope":"customer_campus","qualifier":"Explicit portion of the 350 MW firm ESA, with expected delivery timing.","quantity_role":"scheduled_increment","comparison":"equal","season":null,"reported_period":"expected by end of 2026","temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer_annual_report","execution_status":"reported_esa_delivery_portion","nonadditive_group":"panther-campus","classification":"bitcoin_mining_transition_to_hpc","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Nesquehoning","state":"PA","location_precision":"named_locality"},"unresolved_conflicts":["Customer annual report states ESA executed. Executed utility agreement itself not captured.","Site was used for Bitcoin mining at the report date, with HPC development proposed. Campus entitlement is not IT MW.","A scheduled portion, not an additional 50 MW campus. Timing is expectation, not energization confirmation.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":17,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-panther","note":"Public filings link Carbon Node East Development, Panther Creek and Keel. The address 4 Dennison Road identifies the legacy generating plant and the project applicant. It does not identify a future compute building.","scope":"legacy_plant_address_and_proposed_campus_entity","sources":[{"url":"https://files.dep.state.pa.us/RegionalResources/NERO/NEROPortalFiles/CommunityInformation/Panther_Creek/Panther%20Creek%20TDF%20Plan%20Approval%20Application13-00003B.pdf","title":"files.dep.state.pa.us","pdf_page":11,"published":null,"retrieved_at":"2026-09-17T04:39:07.141914+00:00","sha256":"76be20eed1ed50e72eea18b3e7b9aaf3467e31a1f8ee6405a15178dfc97ba59d","source_family":"public_primary_identity_source","as_of":null},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2026-03-27"},{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-29/56-29.pdf","title":"www.pacodeandbulletin.gov","pdf_page":31,"published":"2026-07-18","retrieved_at":"2026-09-17T04:53:13.247906+00:00","sha256":"4ffcb24ab1c8977960ba201b8e20fb2e1dd72bc345b807ffea6676ba2bcf05c6","source_family":"regulatory_notice","as_of":null},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":315,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2025-12-31"}]}],"status_updates":[{"id":"regional-identity:panther-august-status","note":"Keel reported that Bitcoin mining stopped at this campus on June 29, 2026. Its August 10 filing states that HPC data-center operations had not started here as of August 7, 2026. Operation after that date is not established by this source.","scope":"named_campus","sources":[{"url":"https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a","title":"ir.keelinfra.com","pdf_page":59,"published":"2026-08-10","retrieved_at":"2026-09-17T04:48:30.286530+00:00","sha256":"8b708f35f3e894bf0857cdbc86c9ec14144b553723966f2a16f8c0f2abb7f860","source_family":"public_primary_identity_source","as_of":"2026-08-07"}],"bitcoin_mining_ceased":"2026-06-29","hpc_operation_as_of":"2026-08-07","hpc_operating":false}],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:panther-2027-portion","subject_id":"regional:panther","entity_name":"Bitfarms / Keel Panther Creek","operator_code":null,"reported_value":300,"reported_unit":"MW","kind":"scheduled_increment","source_metric":"panther-2027-portion","scope":"customer_campus","qualifier":"Explicit remaining portion of the 350 MW firm ESA.","quantity_role":"scheduled_increment","comparison":"equal","season":null,"reported_period":"expected by end of 2027","temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer_annual_report","execution_status":"reported_esa_delivery_portion","nonadditive_group":"panther-campus","classification":"bitcoin_mining_transition_to_hpc","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Nesquehoning","state":"PA","location_precision":"named_locality"},"unresolved_conflicts":["Customer annual report states ESA executed. Executed utility agreement itself not captured.","Site was used for Bitcoin mining at the report date, with HPC development proposed. Campus entitlement is not IT MW.","A scheduled portion of the 350 MW total. No building allocation.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":17,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-panther","note":"Public filings link Carbon Node East Development, Panther Creek and Keel. The address 4 Dennison Road identifies the legacy generating plant and the project applicant. It does not identify a future compute building.","scope":"legacy_plant_address_and_proposed_campus_entity","sources":[{"url":"https://files.dep.state.pa.us/RegionalResources/NERO/NEROPortalFiles/CommunityInformation/Panther_Creek/Panther%20Creek%20TDF%20Plan%20Approval%20Application13-00003B.pdf","title":"files.dep.state.pa.us","pdf_page":11,"published":null,"retrieved_at":"2026-09-17T04:39:07.141914+00:00","sha256":"76be20eed1ed50e72eea18b3e7b9aaf3467e31a1f8ee6405a15178dfc97ba59d","source_family":"public_primary_identity_source","as_of":null},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2026-03-27"},{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-29/56-29.pdf","title":"www.pacodeandbulletin.gov","pdf_page":31,"published":"2026-07-18","retrieved_at":"2026-09-17T04:53:13.247906+00:00","sha256":"4ffcb24ab1c8977960ba201b8e20fb2e1dd72bc345b807ffea6676ba2bcf05c6","source_family":"regulatory_notice","as_of":null},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":315,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2025-12-31"}]}],"status_updates":[{"id":"regional-identity:panther-august-status","note":"Keel reported that Bitcoin mining stopped at this campus on June 29, 2026. Its August 10 filing states that HPC data-center operations had not started here as of August 7, 2026. Operation after that date is not established by this source.","scope":"named_campus","sources":[{"url":"https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a","title":"ir.keelinfra.com","pdf_page":59,"published":"2026-08-10","retrieved_at":"2026-09-17T04:48:30.286530+00:00","sha256":"8b708f35f3e894bf0857cdbc86c9ec14144b553723966f2a16f8c0f2abb7f860","source_family":"public_primary_identity_source","as_of":"2026-08-07"}],"bitcoin_mining_ceased":"2026-06-29","hpc_operation_as_of":"2026-08-07","hpc_operating":false}],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:scrubgrass-energized","subject_id":"regional:scrubgrass","entity_name":"Bitfarms / Keel Scrubgrass","operator_code":null,"reported_value":63,"reported_unit":"MW","kind":"energized_capacity","source_metric":"scrubgrass-energized","scope":"customer_campus","qualifier":"Issuer table Current Energized Capacity with explicit not-under-ESA footnote.","quantity_role":"energized_capacity","comparison":"equal","season":null,"reported_period":"as of March 27, 2026","temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer_reported_energized_capacity","execution_status":"not_under_esa_explicit_footnote","nonadditive_group":"scrubgrass-campus","classification":"bitcoin_mining_transition_to_hpc","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Kennerdell","state":"PA","location_precision":"named_locality"},"unresolved_conflicts":["No conversion to import entitlement or measured demand.","Issuer speculative 1,363 MW pipeline combines different future possibilities and is excluded from load evidence.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":16,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-scrubgrass","note":"The company filing places a waste-to-energy plant within the named Scrubgrass campus. EPA identifies Scrubgrass Generating Plant at 2151 Lisbon Road, with EIA plant code 50974. This locates generation infrastructure, without identifying a compute building or its power demand.","scope":"legacy_plant_address_on_named_campus","sources":[{"url":"https://ghgdata.epa.gov/ghgp/html/2023.do?et=undefined&id=1001256","title":"ghgdata.epa.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:46:16.915541+00:00","sha256":"613c844f1474d645f47dd5cb51b972ffaac7e6f45abd7b4316e1f156f4d72894","source_family":"public_primary_identity_source","as_of":"2023-12-31"},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2026-03-27"},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":315,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2025-12-31"}]}],"status_updates":[{"id":"regional-identity:scrubgrass-august-status","note":"Keel reported that Bitcoin mining stopped at this campus on June 29, 2026. Its August 10 filing states that HPC data-center operations had not started here as of August 7, 2026. Operation after that date is not established by this source.","scope":"named_campus","sources":[{"url":"https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a","title":"ir.keelinfra.com","pdf_page":59,"published":"2026-08-10","retrieved_at":"2026-09-17T04:48:30.286530+00:00","sha256":"8b708f35f3e894bf0857cdbc86c9ec14144b553723966f2a16f8c0f2abb7f860","source_family":"public_primary_identity_source","as_of":"2026-08-07"}],"bitcoin_mining_ceased":"2026-06-29","hpc_operation_as_of":"2026-08-07","hpc_operating":false}],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:scrubgrass-import-study","subject_id":"regional:scrubgrass","entity_name":"Bitfarms / Keel Scrubgrass","operator_code":null,"reported_value":750,"reported_unit":"MW","kind":"requested_additional_import","source_metric":"scrubgrass-import-study","scope":"customer_campus","qualifier":"Customer submitted load studies for additional imported power. No executed supply contract asserted.","quantity_role":"requested_additional_import","comparison":"up_to","season":null,"reported_period":"load studies submitted as of March 2026","temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer_reported_study_request","execution_status":"request_not_service_agreement","nonadditive_group":"scrubgrass-campus","classification":"bitcoin_mining_transition_to_hpc","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Kennerdell","state":"PA","location_precision":"named_locality"},"unresolved_conflicts":["Up to value is a request, not secured power.","Gas supply feasibility over 550 MW is generation context and is not part of this imported-load request.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":15,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-scrubgrass","note":"The company filing places a waste-to-energy plant within the named Scrubgrass campus. EPA identifies Scrubgrass Generating Plant at 2151 Lisbon Road, with EIA plant code 50974. This locates generation infrastructure, without identifying a compute building or its power demand.","scope":"legacy_plant_address_on_named_campus","sources":[{"url":"https://ghgdata.epa.gov/ghgp/html/2023.do?et=undefined&id=1001256","title":"ghgdata.epa.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:46:16.915541+00:00","sha256":"613c844f1474d645f47dd5cb51b972ffaac7e6f45abd7b4316e1f156f4d72894","source_family":"public_primary_identity_source","as_of":"2023-12-31"},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2026-03-27"},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":315,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2025-12-31"}]}],"status_updates":[{"id":"regional-identity:scrubgrass-august-status","note":"Keel reported that Bitcoin mining stopped at this campus on June 29, 2026. Its August 10 filing states that HPC data-center operations had not started here as of August 7, 2026. Operation after that date is not established by this source.","scope":"named_campus","sources":[{"url":"https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a","title":"ir.keelinfra.com","pdf_page":59,"published":"2026-08-10","retrieved_at":"2026-09-17T04:48:30.286530+00:00","sha256":"8b708f35f3e894bf0857cdbc86c9ec14144b553723966f2a16f8c0f2abb7f860","source_family":"public_primary_identity_source","as_of":"2026-08-07"}],"bitcoin_mining_ceased":"2026-06-29","hpc_operation_as_of":"2026-08-07","hpc_operating":false}],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:sharon-esa-growth","subject_id":"regional:sharon","entity_name":"Bitfarms / Keel Sharon","operator_code":null,"reported_value":80,"reported_unit":"MW","kind":"customer_reported_contracted_capacity","source_metric":"sharon-esa-growth","scope":"customer_campus","qualifier":"Customer reports 80 MW under ESA as secured growth capacity.","quantity_role":"customer_reported_contracted_capacity","comparison":"equal","season":null,"reported_period":"as of March 27, 2026","temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer_annual_report","execution_status":"executed_esa_reported_by_customer_not_captured","nonadditive_group":"sharon-campus","classification":"bitcoin_mining_transition_to_hpc","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Sharon","state":"PA","location_precision":"named_locality"},"unresolved_conflicts":["Customer annual report states ESA executed. Executed utility agreement itself not captured.","Site was used for Bitcoin mining at the report date, with HPC development proposed. Campus entitlement is not IT MW.","Incremental growth portion, not the 110 MW planned site total. Utility counterparty is not identified in the cited paragraph.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":17,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-sharon","note":"Mercer Node Development appears in the company subsidiary list and the remediation application at 200 Clark Street. That address identifies a remediation and substation property. The proposed connection to the Sharon campus uses several sources; it does not locate a compute building or assign the campus electricity agreement to this property.","scope":"related_infrastructure_property","sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":315,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2025-12-31"},{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-29/1013a.html","title":"www.pacodeandbulletin.gov","pdf_page":null,"published":"2026-07-18","retrieved_at":"2026-09-17T04:53:13.033533+00:00","sha256":"81660c74e32ebabcc33cbd87b8de5644efaeed07b3ca5995717895ef5ce2e391","source_family":"regulatory_notice","as_of":null}]}],"status_updates":[{"id":"regional-identity:sharon-august-status","note":"Keel reported that Bitcoin mining stopped at this campus on June 29, 2026. Its August 10 filing states that HPC data-center operations had not started here as of August 7, 2026. Operation after that date is not established by this source.","scope":"named_campus","sources":[{"url":"https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a","title":"ir.keelinfra.com","pdf_page":59,"published":"2026-08-10","retrieved_at":"2026-09-17T04:48:30.286530+00:00","sha256":"8b708f35f3e894bf0857cdbc86c9ec14144b553723966f2a16f8c0f2abb7f860","source_family":"public_primary_identity_source","as_of":"2026-08-07"}],"bitcoin_mining_ceased":"2026-06-29","hpc_operation_as_of":"2026-08-07","hpc_operating":false}],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:sharon-energized","subject_id":"regional:sharon","entity_name":"Bitfarms / Keel Sharon","operator_code":null,"reported_value":30,"reported_unit":"MW","kind":"energized_capacity","source_metric":"sharon-energized","scope":"customer_campus","qualifier":"Customer reports current energized capacity at the Sharon development site.","quantity_role":"energized_capacity","comparison":"equal","season":null,"reported_period":"as of March 27, 2026","temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer_reported_energized_capacity","execution_status":"current_energization_reported_not_metered","nonadditive_group":"sharon-campus","classification":"bitcoin_mining_transition_to_hpc","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Sharon","state":"PA","location_precision":"named_locality"},"unresolved_conflicts":["Current capacity is not measured usage. Combined future utility capacity is separately reported as 110 MW.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":17,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-sharon","note":"Mercer Node Development appears in the company subsidiary list and the remediation application at 200 Clark Street. That address identifies a remediation and substation property. The proposed connection to the Sharon campus uses several sources; it does not locate a compute building or assign the campus electricity agreement to this property.","scope":"related_infrastructure_property","sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":315,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2025-12-31"},{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-29/1013a.html","title":"www.pacodeandbulletin.gov","pdf_page":null,"published":"2026-07-18","retrieved_at":"2026-09-17T04:53:13.033533+00:00","sha256":"81660c74e32ebabcc33cbd87b8de5644efaeed07b3ca5995717895ef5ce2e391","source_family":"regulatory_notice","as_of":null}]}],"status_updates":[{"id":"regional-identity:sharon-august-status","note":"Keel reported that Bitcoin mining stopped at this campus on June 29, 2026. Its August 10 filing states that HPC data-center operations had not started here as of August 7, 2026. Operation after that date is not established by this source.","scope":"named_campus","sources":[{"url":"https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a","title":"ir.keelinfra.com","pdf_page":59,"published":"2026-08-10","retrieved_at":"2026-09-17T04:48:30.286530+00:00","sha256":"8b708f35f3e894bf0857cdbc86c9ec14144b553723966f2a16f8c0f2abb7f860","source_family":"public_primary_identity_source","as_of":"2026-08-07"}],"bitcoin_mining_ceased":"2026-06-29","hpc_operation_as_of":"2026-08-07","hpc_operating":false}],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:sharon-planned-total","subject_id":"regional:sharon","entity_name":"Bitfarms / Keel Sharon","operator_code":null,"reported_value":110,"reported_unit":"MW","kind":"planned_total_utility_capacity","source_metric":"sharon-planned-total","scope":"customer_campus","qualifier":"Customer explicitly reports expected total energized utility capacity.","quantity_role":"planned_total_utility_capacity","comparison":"equal","season":null,"reported_period":"expected first half of 2027","temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer_annual_report","execution_status":"planned_total_not_delivery_confirmation","nonadditive_group":"sharon-campus","classification":"bitcoin_mining_transition_to_hpc","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Sharon","state":"PA","location_precision":"named_locality"},"unresolved_conflicts":["Total includes 30 MW energized and 80 MW ESA growth. Nonadditive with those components.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":17,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":8,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-sharon","note":"Mercer Node Development appears in the company subsidiary list and the remediation application at 200 Clark Street. That address identifies a remediation and substation property. The proposed connection to the Sharon campus uses several sources; it does not locate a compute building or assign the campus electricity agreement to this property.","scope":"related_infrastructure_property","sources":[{"url":"https://ir.keelinfra.com/static-files/215890f5-194a-418c-9595-6383885ff5a1","title":"ir.keelinfra.com","pdf_page":315,"published":"2026-03-31","retrieved_at":"2026-09-17T03:57:15.350347+00:00","sha256":"e6684d12f3dca1853957f2cc627482d172a8158c66a62e4bb8b26b5d55f071d4","source_family":"customer_regulatory_filing","as_of":"2025-12-31"},{"url":"https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-29/1013a.html","title":"www.pacodeandbulletin.gov","pdf_page":null,"published":"2026-07-18","retrieved_at":"2026-09-17T04:53:13.033533+00:00","sha256":"81660c74e32ebabcc33cbd87b8de5644efaeed07b3ca5995717895ef5ce2e391","source_family":"regulatory_notice","as_of":null}]}],"status_updates":[{"id":"regional-identity:sharon-august-status","note":"Keel reported that Bitcoin mining stopped at this campus on June 29, 2026. Its August 10 filing states that HPC data-center operations had not started here as of August 7, 2026. Operation after that date is not established by this source.","scope":"named_campus","sources":[{"url":"https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a","title":"ir.keelinfra.com","pdf_page":59,"published":"2026-08-10","retrieved_at":"2026-09-17T04:48:30.286530+00:00","sha256":"8b708f35f3e894bf0857cdbc86c9ec14144b553723966f2a16f8c0f2abb7f860","source_family":"public_primary_identity_source","as_of":"2026-08-07"}],"bitcoin_mining_ceased":"2026-06-29","hpc_operation_as_of":"2026-08-07","hpc_operating":false}],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"national-power03::nfpr03-clt01-contracted-load","subject_id":null,"entity_name":"BlockchAIn CLT-01","operator_code":null,"reported_value":65,"reported_unit":"MW","kind":"contracted_utility_load","scope":"campus","electrical_extent":"named_site","comparison":"exact","upper_value":null,"qualifier":"Campus-level contracted utility load. The source also states the prior 40 MW value. No building allocation.","temporal_role":"contract_reported_in_dated_release","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/2070542/000121390026063565/ea029232801ex99-1.htm","title":"blockchain-clt01-2026","pdf_page":null,"published":"2026-05-27","retrieved_at":"2026-09-18T03:52:31.195267+00:00","sha256":"bf90e599143a80872908e3c1d8f516728e4c1dd070622b83ba82d0fd2cec7afe","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Dated release opening paragraph","text_lines_1_based":[15,17],"text_character_span":[725,979],"normalized_text_character_span":[725,979]}],"text_sha256":"c3786c5ad46f6c9afe09e98550dfb7aaaad11fc1f1b8c91dc7b22258e76d1ecc","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-05-27","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-05-27","sec_filing_date":"2026-06-01","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"clt01-contract-and-loi","identity_state":"unresolved_no_record_association","correction_ids":[],"source_observation_id":"nfpr03-clt01-contracted-load","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-clt01-loi-critical-it","subject_id":null,"entity_name":"BlockchAIn CLT-01","operator_code":null,"reported_value":25,"reported_unit":"MW","kind":"critical_it_letters_of_intent","scope":"campus","electrical_extent":"prospective_customer_pipeline","comparison":"exact","upper_value":null,"qualifier":"Customer pipeline evidenced by letters of intent. Executed delivery or binding load obligations are not established by this release; do not equate to current IT load.","temporal_role":"letters_of_intent_prospective_pipeline","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/2070542/000121390026063565/ea029232801ex99-1.htm","title":"blockchain-clt01-2026","pdf_page":null,"published":"2026-05-27","retrieved_at":"2026-09-18T03:52:31.195267+00:00","sha256":"bf90e599143a80872908e3c1d8f516728e4c1dd070622b83ba82d0fd2cec7afe","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML release customer-pipeline paragraph; extracted text lines 20 to 23","text_lines_1_based":[23,24],"text_character_span":[1467,1587],"normalized_text_character_span":[1467,1587]}],"text_sha256":"c3786c5ad46f6c9afe09e98550dfb7aaaad11fc1f1b8c91dc7b22258e76d1ecc","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-05-27","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-05-27","sec_filing_date":"2026-06-01","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"clt01-contract-and-loi","identity_state":"unresolved_no_record_association","correction_ids":[],"source_observation_id":"nfpr03-clt01-loi-critical-it","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"power2-d07bb4e6f880bf70bdae","entity_name":"Bowers Data Center","operator_code":null,"reported_value":60,"reported_unit":"MW","kind":"facility_expected_demand","scope":"building","qualifier":"Source explicitly reports this quantity in the design/PUE paragraph; no calculated PUE or utilization adjustment. Average ambient conditions at design IT load.","temporal_role":"proposed","as_of":"2022-08-31","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=245769&DocumentContentId=79974","title":"BBGF SPPE Application - Main 272 page(s)","pdf_page":17,"published":"2022-08-31","retrieved_at":"2026-09-16T22:55:38.992548+00:00","sha256":"70e16393e308cb1fc71bf944ff14ff2f3b96df76b00a0cd69926795662a3f617","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-f3ce4fe54f023191f737","entity_name":"Bowers Data Center","operator_code":null,"reported_value":72,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Source explicitly reports this quantity in the design/PUE paragraph; no calculated PUE or utilization adjustment. ","temporal_role":"proposed","as_of":"2022-08-31","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=245769&DocumentContentId=79974","title":"BBGF SPPE Application - Main 272 page(s)","pdf_page":17,"published":"2022-08-31","retrieved_at":"2026-09-16T22:55:38.992548+00:00","sha256":"70e16393e308cb1fc71bf944ff14ff2f3b96df76b00a0cd69926795662a3f617","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-7f8991832d677a83dd4a","entity_name":"Bowers Data Center","operator_code":null,"reported_value":48,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Source explicitly reports this quantity in the design/PUE paragraph; no calculated PUE or utilization adjustment. ","temporal_role":"proposed","as_of":"2022-08-31","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=245769&DocumentContentId=79974","title":"BBGF SPPE Application - Main 272 page(s)","pdf_page":17,"published":"2022-08-31","retrieved_at":"2026-09-16T22:55:38.992548+00:00","sha256":"70e16393e308cb1fc71bf944ff14ff2f3b96df76b00a0cd69926795662a3f617","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1744","entity_name":"Brookhaven Data Center","operator_code":"1744","reported_value":300,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Withdrawn","generator_id":null,"proposed_date_native":"01-2029","classification":"unclassified_data_center_name","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Suffolk","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":54,"quantity_cell":"E54"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1721","entity_name":"Brookhaven Logistics Center","operator_code":"1721","reported_value":176.6,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"FS in Progress","generator_id":null,"proposed_date_native":"12-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Suffolk","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":34,"quantity_cell":"E34"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1721:summer","entity_name":"Brookhaven Logistics Center","operator_code":"1721","reported_value":176.6,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1721:winter","entity_name":"Brookhaven Logistics Center","operator_code":"1721","reported_value":176.6,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-mpls-increment-later","subject_id":"dc-ce2790c416eab574","entity_name":"CLAR Minneapolis, 1001 3rd Avenue South, six-story office/data-center host","operator_code":null,"reported_value":20,"reported_unit":"MW","kind":"facility_expansion_increment","scope":"building","electrical_extent":"increment_only","comparison":"range","upper_value":30,"qualifier":"Expected increase over 18–36 months, not a new total; overlap with the 10 MW increment is not specified.","temporal_role":"future_forecast","as_of":"2025-11-10","as_of_basis":"Applicant letter dated November 10, 2025, reproduced in December 8 city report. No later power completion asserted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://lims.minneapolismn.gov/Download/Agenda/8265/5737/10013rdAveSStaffReport.pdf","title":"minneapolis_browser","pdf_page":7,"published":null,"retrieved_at":"2026-09-17T15:11:42.695374+00:00","sha256":"7161bd76b489f213af7494be34c7f6df4bcf1e242abdc601796ee7739f38cb4f","source_family":"state_filing","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-mpls-increment-q1","subject_id":"dc-ce2790c416eab574","entity_name":"CLAR Minneapolis, 1001 3rd Avenue South, six-story office/data-center host","operator_code":null,"reported_value":10,"reported_unit":"MW","kind":"facility_expansion_increment","scope":"building","electrical_extent":"increment_only","comparison":"exact","upper_value":null,"qualifier":"Q1 2026 anticipated increment as reported in November 2025. Do not add to current capacity or mark energized.","temporal_role":"future_forecast","as_of":"2025-11-10","as_of_basis":"Applicant letter dated November 10, 2025, reproduced in December 8 city report. No later power completion asserted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://lims.minneapolismn.gov/Download/Agenda/8265/5737/10013rdAveSStaffReport.pdf","title":"minneapolis_browser","pdf_page":7,"published":null,"retrieved_at":"2026-09-17T15:11:42.695374+00:00","sha256":"7161bd76b489f213af7494be34c7f6df4bcf1e242abdc601796ee7739f38cb4f","source_family":"state_filing","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-mpls-buildout","subject_id":"dc-ce2790c416eab574","entity_name":"CLAR Minneapolis, 1001 3rd Avenue South, six-story office/data-center host","operator_code":null,"reported_value":60,"reported_unit":"MW","kind":"facility_gross_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"approximate","upper_value":null,"qualifier":"Forecast within the existing physical host. No full-buildout completion date or achieved capacity confirmed.","temporal_role":"future_forecast","as_of":"2025-11-10","as_of_basis":"Applicant letter dated November 10, 2025, reproduced in December 8 city report. No later power completion asserted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://lims.minneapolismn.gov/Download/Agenda/8265/5737/10013rdAveSStaffReport.pdf","title":"minneapolis_browser","pdf_page":7,"published":null,"retrieved_at":"2026-09-17T15:11:42.695374+00:00","sha256":"7161bd76b489f213af7494be34c7f6df4bcf1e242abdc601796ee7739f38cb4f","source_family":"state_filing","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-mpls-current","subject_id":"dc-ce2790c416eab574","entity_name":"CLAR Minneapolis, 1001 3rd Avenue South, six-story office/data-center host","operator_code":null,"reported_value":26.5,"reported_unit":"MW","kind":"facility_gross_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Reported gross capacity includes the entire mixed office/data-center building. This is capacity, not measured load or IT. Preserve historical reporting date.","temporal_role":"reported_capacity","as_of":"2025-11-10","as_of_basis":"Applicant letter dated November 10, 2025, reproduced in December 8 city report. No later power completion asserted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"register_selected_field_observation","scalar_eligible":true,"selected_field":"capacity.facility_mw","unresolved_conflicts":["Selected by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://lims.minneapolismn.gov/Download/Agenda/8265/5737/10013rdAveSStaffReport.pdf","title":"minneapolis_browser","pdf_page":7,"published":null,"retrieved_at":"2026-09-17T15:11:42.695374+00:00","sha256":"7161bd76b489f213af7494be34c7f6df4bcf1e242abdc601796ee7739f38cb4f","source_family":"state_filing","reuse_note":"public-record-facts"},{"url":"https://lims.minneapolismn.gov/Download/Agenda/8265/5737/10013rdAveSStaffReport.pdf","title":"minneapolis_browser","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T15:11:42.695374+00:00","sha256":"7161bd76b489f213af7494be34c7f6df4bcf1e242abdc601796ee7739f38cb4f","source_family":"state_filing","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-cedar-full","subject_id":null,"entity_name":"CLOP Cedar Rapids, permit BP-002597-2026, 1515 33rd Avenue SW","operator_code":null,"reported_value":10,"reported_unit":"MW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"The permit identifies one host and first three halls. Exact physical position remains unresolved; no arbitrary address point or scalar import proposed.","temporal_role":"permitted_design","as_of":"2026-06-22","as_of_basis":"Permit application/issue date. No opening inferred.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://apps2.cedar-rapids.org/BuildingPermitViewer/details.aspx?id=a7025abf-6351-428e-9b0d-856ae98b62db","title":"cedar_browser","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:13:32.477Z","sha256":"223a82d1725520622e5891257275baf5fc51e200cc8699552cdf1e360f63b29d","source_family":"state_filing","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-cedar-phase","subject_id":null,"entity_name":"CLOP Cedar Rapids, permit BP-002597-2026, 1515 33rd Avenue SW","operator_code":null,"reported_value":6,"reported_unit":"MW","kind":"it_critical_design","scope":"phase","electrical_extent":"data_halls_1_2_3","comparison":"exact","upper_value":null,"qualifier":"The permit identifies one host and first three halls. Exact physical position remains unresolved; no arbitrary address point or scalar import proposed.","temporal_role":"permitted_design","as_of":"2026-06-22","as_of_basis":"Permit application/issue date. No opening inferred.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://apps2.cedar-rapids.org/BuildingPermitViewer/details.aspx?id=a7025abf-6351-428e-9b0d-856ae98b62db","title":"cedar_browser","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:13:32.477Z","sha256":"223a82d1725520622e5891257275baf5fc51e200cc8699552cdf1e360f63b29d","source_family":"state_filing","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0020:1","entity_name":"CVEC Appomattox","operator_code":"DOM-2025-0020","reported_value":50,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"initial","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Table says projected 2030; prose says ultimate 300 MW May 2029. Retain the timing difference.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0020:2","entity_name":"CVEC Appomattox","operator_code":"DOM-2025-0020","reported_value":300,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2030","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Table says projected 2030; prose says ultimate 300 MW May 2029. Retain the timing difference.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1683","entity_name":"Cayuga Compute","operator_code":"1683","reported_value":88,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Approved","generator_id":null,"proposed_date_native":"01-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Tompkins","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":27,"quantity_cell":"E27"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1683:summer","entity_name":"Cayuga Compute","operator_code":"1683","reported_value":88,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1683:winter","entity_name":"Cayuga Compute","operator_code":"1683","reported_value":88,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1733","entity_name":"Cayuga Data","operator_code":"1733","reported_value":162,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"12-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Tompkins","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":44,"quantity_cell":"E44"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1733:summer","entity_name":"Cayuga Data","operator_code":"1733","reported_value":162,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Aug-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1733:winter","entity_name":"Cayuga Data","operator_code":"1733","reported_value":162,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Aug-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:850","entity_name":"Cayuga Load","operator_code":"0850","reported_value":50,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"FS Pending","generator_id":null,"proposed_date_native":"12-2026","classification":"crypto_mining","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Cayuga","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":12,"quantity_cell":"E12"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:850:summer","entity_name":"Cayuga Load","operator_code":"850","reported_value":50,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-26","classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:850:winter","entity_name":"Cayuga Load","operator_code":"850","reported_value":50,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-26","classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:03","entity_name":"CleanSpark / Vicksburg, MS","operator_code":null,"reported_value":32,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"existing_load_highlighted","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"existing_load_highlighted","generator_id":null,"proposed_date_native":"2024","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":1,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:04","entity_name":"CleanSpark / Wiggins, MS","operator_code":null,"reported_value":58,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"existing_load_highlighted","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"existing_load_highlighted","generator_id":null,"proposed_date_native":"2024","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":1,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-primary03::jax2-utility-entrance-rating","subject_id":"dc-6d9f63cdb2eb335c","entity_name":"Cologix JAX2 host","operator_code":null,"reported_value":3.75,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","electrical_extent":"per_utility_entrance_rating_two_redundant_entrances_no_sum","comparison":"equal","upper_value":null,"qualifier":"Each of two utility entrances is labeled 3.75 MW. Preserve the source 2N diverse-feeds context. Do not sum to 7.5 MW or treat service rating as facility demand or IT capacity. Whole-building exclusive occupancy and interior extent remain unknown.","temporal_role":"undated_operator_technical_specification","as_of":null,"as_of_basis":"No explicit reporting or effective date is printed on these pages. URL directories and document edition codes are not dates.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["This operator specification does not establish metered demand, contracted delivery or commissioning.","The rating is not eligible for a facility-MW or IT-MW scalar.","Typed catalog context only. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.cologix.com/wp-content/uploads/2018/12/Jacksonville-Data-Center-JAX-2.pdf","title":"Cologix JAX2 technical sheet","pdf_page":2,"published":null,"retrieved_at":"2026-09-18T10:11:25.040885+00:00","sha256":"b68dfaf7ab54702e317c4ce7381caf1925ca40ccc55f66b7e5fe9a171d8bff9d","source_family":"operator_document","reuse_note":"Factual extraction with attribution only. No open license or right to redistribute the PDF or page images is inferred.","license":"company-public"},{"url":"https://www.cologix.com/wp-content/uploads/2018/12/Jacksonville-Data-Center-JAX-2.pdf","title":"Cologix JAX2 technical sheet","pdf_page":1,"published":null,"retrieved_at":"2026-09-18T10:11:25.040885+00:00","sha256":"b68dfaf7ab54702e317c4ce7381caf1925ca40ccc55f66b7e5fe9a171d8bff9d","source_family":"operator_document","reuse_note":"Factual extraction with attribution only. No open license or right to redistribute the PDF or page images is inferred.","license":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"unit_count":2,"dimension":"power","source_extraction_kind":"utility_entrance_rating_mw","source_observation_id":"power-primary03:dc-6d9f63cdb2eb335c:utility_entrance_rating_mw","quantity_role":"supply_or_equipment_rating_not_facility_demand","whole_building_exclusive_occupancy":null,"nonadditive_group":"power-primary03::jax2-utility-entrance-rating","source_scope_review":{"sha256":"ca5cd338173b9bf7b2ee186eccc7fdbfec3262bf28b4e73602969faca698c045","reviewer":"Codex parent","reviewed_at":"2026-09-18T10:48:24.970281+00:00","scope":"two_native_catalog_ratings_only","independent_audit":false},"catalog_review":{"reviewer":"Codex parent","reviewed_at":"2026-09-18T11:03:11.151656+00:00","scope":"typed_catalog_only_existing_host_reference"}},{"id":"national-power03::nfpr03-core-austin-it","subject_id":null,"entity_name":"Core Scientific Austin Campus","operator_code":null,"reported_value":16.5,"reported_unit":"MW","kind":"licensed_critical_it_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[102,108],"text_character_span":[8483,8530],"normalized_text_character_span":[8483,8530]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-austin","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"Complete","anticipated_substantial_completion":"Complete"},"source_observation_id":"nfpr03-core-austin-it","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-austin-grid","subject_id":null,"entity_name":"Core Scientific Austin Campus","operator_code":null,"reported_value":20,"reported_unit":"MW","kind":"project_grid_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[102,108],"text_character_span":[8483,8530],"normalized_text_character_span":[8483,8530]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-austin","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"Complete","anticipated_substantial_completion":"Complete"},"source_observation_id":"nfpr03-core-austin-grid","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-dalton1-it","subject_id":null,"entity_name":"Core Scientific Dalton 1","operator_code":null,"reported_value":30,"reported_unit":"MW","kind":"licensed_critical_it_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[117,124],"text_character_span":[8582,8636],"normalized_text_character_span":[8582,8636]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-dalton1","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"H1 2026","anticipated_substantial_completion":"H1 2026"},"source_observation_id":"nfpr03-core-dalton1-it","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-dalton1-grid","subject_id":null,"entity_name":"Core Scientific Dalton 1","operator_code":null,"reported_value":50,"reported_unit":"MW","kind":"project_grid_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[117,124],"text_character_span":[8582,8636],"normalized_text_character_span":[8582,8636]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-dalton1","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"H1 2026","anticipated_substantial_completion":"H1 2026"},"source_observation_id":"nfpr03-core-dalton1-grid","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-dalton-aggregate-access","subject_id":null,"entity_name":"Core Scientific Dalton 1 and Dalton 4","operator_code":null,"reported_value":270,"reported_unit":"MW","kind":"aggregate_utility_access","scope":"campus_group","electrical_extent":"two_building_aggregate","comparison":"exact","upper_value":null,"qualifier":"Reported 270 MW aggregate access for Dalton 1 and 4. No per-building allocation and no addition to broader 450 MW utility procurement target.","temporal_role":"access_reported_in_dated_source","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"The Dalton Campuses: utility access and broader procurement","text_lines_1_based":[228,229],"text_character_span":[20679,21079],"normalized_text_character_span":[20679,21079]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"dalton-utility-access-procurement","identity_state":"unresolved_no_record_association","correction_ids":[],"source_observation_id":"nfpr03-core-dalton-aggregate-access","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-dalton4-it","subject_id":null,"entity_name":"Core Scientific Dalton 4","operator_code":null,"reported_value":145,"reported_unit":"MW","kind":"licensed_critical_it_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[125,132],"text_character_span":[8637,8696],"normalized_text_character_span":[8637,8696]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-dalton4","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"H2 2026","anticipated_substantial_completion":"H1 2027"},"source_observation_id":"nfpr03-core-dalton4-it","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-dalton4-grid","subject_id":null,"entity_name":"Core Scientific Dalton 4","operator_code":null,"reported_value":220,"reported_unit":"MW","kind":"project_grid_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[125,132],"text_character_span":[8637,8696],"normalized_text_character_span":[8637,8696]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-dalton4","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"H2 2026","anticipated_substantial_completion":"H1 2027"},"source_observation_id":"nfpr03-core-dalton4-grid","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-denton-it","subject_id":null,"entity_name":"Core Scientific Denton Campus","operator_code":null,"reported_value":262,"reported_unit":"MW","kind":"licensed_critical_it_design_capacity","scope":"campus","electrical_extent":"multi_building_campus","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[109,116],"text_character_span":[8531,8581],"normalized_text_character_span":[8531,8581]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-denton","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"Complete (initial billing only)","anticipated_substantial_completion":"H2 2026"},"source_observation_id":"nfpr03-core-denton-it","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-denton-grid","subject_id":null,"entity_name":"Core Scientific Denton Campus","operator_code":null,"reported_value":394,"reported_unit":"MW","kind":"project_grid_design_capacity","scope":"campus","electrical_extent":"multi_building_campus","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[109,116],"text_character_span":[8531,8581],"normalized_text_character_span":[8531,8581]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-denton","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"Complete (initial billing only)","anticipated_substantial_completion":"H2 2026"},"source_observation_id":"nfpr03-core-denton-grid","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-hunt-gross-future","subject_id":null,"entity_name":"Core Scientific Hunt County future site","operator_code":null,"reported_value":430,"reported_unit":"MW","kind":"gross_utility_power_expected","scope":"future_campus","electrical_extent":"site_service_agreement","comparison":"approximately","upper_value":null,"qualifier":"Expected 430 MW gross utility capacity associated with May 5 land acquisition and ESA. Future development; no operating IT or facility-demand claim. June 30 is the reporting period end only.","temporal_role":"future_site_supply_expectation","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000014/core-20260630.htm","title":"core-q2-2026","pdf_page":null,"published":"2026-07-28","retrieved_at":"2026-09-18T03:53:58.700941+00:00","sha256":"f8e6412ce78eee3ef775ff1e642dbce837429286fe62d4389a93777beef67cde","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Note 3: Hunt County Acquisition","text_lines_1_based":[2151,2155],"text_character_span":[49285,49640],"normalized_text_character_span":[49258,49613]}],"text_sha256":"3c5d1a734ceacfd4e4f2a2d4f1f24d34f9d929e6f90f978f05aa7b7dbaef0b83","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-07-28","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-07-28","sec_filing_date":"2026-07-28","document_period_end":"2026-06-30","event_dates":[{"date":"2026-05-05","role":"land_acquisition_and_related_ESA","quantity_effective_date":false}],"forecast_target_period":null,"non_additive_group":"core-hunt-future-site","identity_state":"unresolved_no_record_association","correction_ids":["C02-core-q2-date","D01-report-not-effective-date"],"source_observation_id":"nfpr03-core-hunt-gross-future","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-marble-duke-48","subject_id":null,"entity_name":"Core Scientific Marble Campus","operator_code":null,"reported_value":48000,"reported_unit":"kW","kind":"contract_demand","scope":"service_agreement","electrical_extent":"partial_service_arrangement","comparison":"exact","upper_value":null,"qualifier":"One of three separate Marble service arrangements. It is not a whole-facility scalar and must not be summed with the other agreements or project table.","temporal_role":"dated_contract_component","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"The Marble Campus: three service agreements","text_lines_1_based":[241,247],"text_character_span":[22836,23639],"normalized_text_character_span":[22836,23639]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-marble","identity_state":"unresolved_no_record_association","correction_ids":["C06-marble-partial-service-no-sum"],"source_observation_id":"nfpr03-core-marble-duke-48","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-marble-murphy","subject_id":null,"entity_name":"Core Scientific Marble Campus","operator_code":null,"reported_value":35000,"reported_unit":"kW","kind":"firm_power_service","scope":"service_agreement","electrical_extent":"partial_service_arrangement","comparison":"exact","upper_value":null,"qualifier":"One of three separate Marble service arrangements. It is not a whole-facility scalar and must not be summed with the other agreements or project table.","temporal_role":"dated_contract_component","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"The Marble Campus: three service agreements","text_lines_1_based":[241,247],"text_character_span":[22836,23639],"normalized_text_character_span":[22836,23639]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-marble","identity_state":"unresolved_no_record_association","correction_ids":["C06-marble-partial-service-no-sum"],"source_observation_id":"nfpr03-core-marble-murphy","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-marble-it","subject_id":null,"entity_name":"Core Scientific Marble Campus","operator_code":null,"reported_value":65,"reported_unit":"MW","kind":"licensed_critical_it_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[133,140],"text_character_span":[8697,8745],"normalized_text_character_span":[8697,8745]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-marble","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"Complete (initial billing only)","anticipated_substantial_completion":"H1 2026"},"source_observation_id":"nfpr03-core-marble-it","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-marble-grid","subject_id":null,"entity_name":"Core Scientific Marble Campus","operator_code":null,"reported_value":117,"reported_unit":"MW","kind":"project_grid_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[133,140],"text_character_span":[8697,8745],"normalized_text_character_span":[8697,8745]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-marble","identity_state":"unresolved_no_record_association","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"Complete (initial billing only)","anticipated_substantial_completion":"H1 2026"},"source_observation_id":"nfpr03-core-marble-grid","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-marble-duke-34","subject_id":null,"entity_name":"Core Scientific Marble Campus","operator_code":null,"reported_value":34000,"reported_unit":"kW","kind":"starting_contract_demand","scope":"service_agreement","electrical_extent":"partial_service_arrangement","comparison":"exact","upper_value":null,"qualifier":"One of three separate Marble service arrangements. It is not a whole-facility scalar and must not be summed with the other agreements or project table.","temporal_role":"dated_contract_component","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"The Marble Campus: three service agreements","text_lines_1_based":[241,247],"text_character_span":[22836,23639],"normalized_text_character_span":[22836,23639]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-marble","identity_state":"unresolved_no_record_association","correction_ids":["C06-marble-partial-service-no-sum"],"source_observation_id":"nfpr03-core-marble-duke-34","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-muskogee-esa-demand","subject_id":null,"entity_name":"Core Scientific Muskogee Campus","operator_code":null,"reported_value":100000,"reported_unit":"kW","kind":"estimated_contract_maximum_demand","scope":"building","electrical_extent":"whole_named_building","comparison":"estimated_maximum","upper_value":null,"qualifier":"Estimated maximum demand anticipated under the OG&E agreement, subject to reductions/increases. No record association in this package.","temporal_role":"anticipated_contract_service","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"The Muskogee Campus: OG&E agreement","text_lines_1_based":[259,262],"text_character_span":[25374,26027],"normalized_text_character_span":[25374,26027]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-muskogee","identity_state":"reserved_for_separate_Feynman_host_review","correction_ids":[],"source_observation_id":"nfpr03-core-muskogee-esa-demand","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-muskogee-it","subject_id":null,"entity_name":"Core Scientific Muskogee Campus","operator_code":null,"reported_value":70,"reported_unit":"MW","kind":"licensed_critical_it_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[141,147],"text_character_span":[8746,8791],"normalized_text_character_span":[8746,8791]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-muskogee","identity_state":"reserved_for_separate_Feynman_host_review","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"H1 2026","anticipated_substantial_completion":"H1 2026"},"source_observation_id":"nfpr03-core-muskogee-it","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-muskogee-grid","subject_id":null,"entity_name":"Core Scientific Muskogee Campus","operator_code":null,"reported_value":100,"reported_unit":"MW","kind":"project_grid_design_capacity","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Project-table capacity, with mixed delivery stages. The table is not measured demand, fully delivered capacity or current IT load. License allocations corroborate the IT column only.","temporal_role":"dated_project_design_and_license_capacity","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"HTML project overview table; extracted text around lines 87 to 151","text_lines_1_based":[141,147],"text_character_span":[8746,8791],"normalized_text_character_span":[8746,8791]},{"heading":"Project overview table and footnotes 1 and 2","text_lines_1_based":[79,151],"text_character_span":[8077,9018],"normalized_text_character_span":[8077,9018]},{"heading":"CoreWeave Licensing Agreements","text_lines_1_based":[295,297],"text_character_span":[29481,29845],"normalized_text_character_span":[29481,29845]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"core-project-muskogee","identity_state":"reserved_for_separate_Feynman_host_review","correction_ids":["C05-core-table-design-role","D01-report-not-effective-date"],"source_table_delivery_labels":{"anticipated_starting_delivery":"H1 2026","anticipated_substantial_completion":"H1 2026"},"source_observation_id":"nfpr03-core-muskogee-grid","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-core-muskogee-adjacent-future","subject_id":null,"entity_name":"Core Scientific proposed Polaris acquisition adjacent to Muskogee","operator_code":null,"reported_value":440,"reported_unit":"MW","kind":"gross_utility_power_agreements_future_acquisition","scope":"future_campus_expansion","electrical_extent":"adjacent_site","comparison":"up_to","upper_value":null,"qualifier":"Up to 440 MW gross utility capacity in agreements held by acquisition target on adjacent site. Closing expected Q3 2026. Keep separate from existing Muskogee building and all its licensed/service quantities.","temporal_role":"pending_adjacent_site_transaction","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000014/core-20260630.htm","title":"core-q2-2026","pdf_page":null,"published":"2026-07-28","retrieved_at":"2026-09-18T03:53:58.700941+00:00","sha256":"f8e6412ce78eee3ef775ff1e642dbce837429286fe62d4389a93777beef67cde","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Polaris DS LLC Merger Agreement","text_lines_1_based":[2973,2985],"text_character_span":[77767,78766],"normalized_text_character_span":[77684,78683]}],"text_sha256":"3c5d1a734ceacfd4e4f2a2d4f1f24d34f9d929e6f90f978f05aa7b7dbaef0b83","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-07-28","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-07-28","sec_filing_date":"2026-07-28","document_period_end":"2026-06-30","event_dates":[{"date":"2026-05-05","role":"merger_agreement_signed_not_closed","quantity_effective_date":false}],"forecast_target_period":{"native":"third quarter of 2026","start":"2026-07-01","end":"2026-09-30","role":"expected_transaction_closing_not_power_delivery"},"non_additive_group":"core-muskogee-adjacent-future","identity_state":"unresolved_no_record_association","correction_ids":["C02-core-q2-date","D01-report-not-effective-date"],"source_observation_id":"nfpr03-core-muskogee-adjacent-future","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"eia860-2025:61464:G-1:operable","entity_name":"CoreSite Real Estate 2972 Stender, L.P.","operator_code":"61464","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"G-1","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"2972 Stender Way","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":19586,"quantity_cell":"P19586"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:61464:G-2:operable","entity_name":"CoreSite Real Estate 2972 Stender, L.P.","operator_code":"61464","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"G-2","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"2972 Stender Way","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":19587,"quantity_cell":"P19587"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:61464:G-3:operable","entity_name":"CoreSite Real Estate 2972 Stender, L.P.","operator_code":"61464","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"G-3","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"2972 Stender Way","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":19588,"quantity_cell":"P19588"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:61464:G-4:operable","entity_name":"CoreSite Real Estate 2972 Stender, L.P.","operator_code":"61464","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"G-4","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"2972 Stender Way","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":19589,"quantity_cell":"P19589"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:61464:G-5:operable","entity_name":"CoreSite Real Estate 2972 Stender, L.P.","operator_code":"61464","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"G-5","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"2972 Stender Way","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":19590,"quantity_cell":"P19590"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:61464:G-6:operable","entity_name":"CoreSite Real Estate 2972 Stender, L.P.","operator_code":"61464","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"G-6","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"2972 Stender Way","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":19591,"quantity_cell":"P19591"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0083:1","entity_name":"Cosner Spotsylvania REC","operator_code":"DOM-2025-0083","reported_value":300,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"expected load","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested 2027-12-01.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-12---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":9,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:48.584148+00:00","sha256":"0a3e8e293f93818b642ef4587cd826eb7c1debcc432444a96a2b75a74e49c732","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-c098955ff63403504354","entity_name":"Csquare ABQ1","operator_code":"ABQ1","reported_value":5.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/albuquerque","title":"Albuquerque Colocation Data Centers Power & Space Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.732343+00:00","sha256":"bf98ca892af29925caddea47515e93fb6716387c228e79b55116222d80016c9d","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ABQ-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.276148+00:00","sha256":"81c8e4760bba4aecb6dcea82798011508d1347ab3e617c9c7eb731a9880ef5d6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-87a30c2d648c6427f8fb","entity_name":"Csquare ABQ1","operator_code":"ABQ1","reported_value":1.8,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/albuquerque","title":"Albuquerque Colocation Data Centers Power & Space Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.732343+00:00","sha256":"bf98ca892af29925caddea47515e93fb6716387c228e79b55116222d80016c9d","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ABQ-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.276148+00:00","sha256":"81c8e4760bba4aecb6dcea82798011508d1347ab3e617c9c7eb731a9880ef5d6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-ff3937591c8b7bd18110","entity_name":"Csquare ABQ1","operator_code":"ABQ1","reported_value":8.6,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/albuquerque","title":"Albuquerque Colocation Data Centers Power & Space Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.732343+00:00","sha256":"bf98ca892af29925caddea47515e93fb6716387c228e79b55116222d80016c9d","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ABQ-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.276148+00:00","sha256":"81c8e4760bba4aecb6dcea82798011508d1347ab3e617c9c7eb731a9880ef5d6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-17bf293ada031a7291e0","entity_name":"Csquare ATL1","operator_code":"ATL1","reported_value":23.5,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/atlanta","title":"Atlanta Data Centers | Colocation Solutions in Atlanta | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763131+00:00","sha256":"7afce89a851d79d0a14135f1d1898c59b5c69717952a773c795dcab14b14a605","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ATL-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.354908+00:00","sha256":"1249acc4b5fcd1480808ea3fcff3c946274e2f6dfdec6ee2832c0adb20ff1dc6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-d5b7f0c77ef2d527cf7e","entity_name":"Csquare ATL1","operator_code":"ATL1","reported_value":9.2,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/atlanta","title":"Atlanta Data Centers | Colocation Solutions in Atlanta | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763131+00:00","sha256":"7afce89a851d79d0a14135f1d1898c59b5c69717952a773c795dcab14b14a605","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ATL-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.354908+00:00","sha256":"1249acc4b5fcd1480808ea3fcff3c946274e2f6dfdec6ee2832c0adb20ff1dc6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-6aaa9e19b08a73b39341","entity_name":"Csquare ATL1","operator_code":"ATL1","reported_value":81.5,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/atlanta","title":"Atlanta Data Centers | Colocation Solutions in Atlanta | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763131+00:00","sha256":"7afce89a851d79d0a14135f1d1898c59b5c69717952a773c795dcab14b14a605","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ATL-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.354908+00:00","sha256":"1249acc4b5fcd1480808ea3fcff3c946274e2f6dfdec6ee2832c0adb20ff1dc6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-e0fe4f9e1689182635d5","entity_name":"Csquare BOS1","operator_code":"BOS1","reported_value":11.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"campus","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/boston","title":"Top Boston Data Centers | Colocation Power in Boston | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763206+00:00","sha256":"0d57c9a24802035bb6739ad97b04c16d16eeaa25ed1ae7e90ef511e313917c42","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-BOS-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.355276+00:00","sha256":"8bba76918201b37d4800f50eeb6f25dc36a833a8d76e31c9797daa18e6ce7163","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-d16b9eed51d3cf77acc0","entity_name":"Csquare BOS1","operator_code":"BOS1","reported_value":6.1,"reported_unit":"MW","kind":"ups_output_capacity","scope":"campus","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/boston","title":"Top Boston Data Centers | Colocation Power in Boston | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763206+00:00","sha256":"0d57c9a24802035bb6739ad97b04c16d16eeaa25ed1ae7e90ef511e313917c42","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-BOS-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.355276+00:00","sha256":"8bba76918201b37d4800f50eeb6f25dc36a833a8d76e31c9797daa18e6ce7163","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-adbb1f2eaff72b6e552e","entity_name":"Csquare BOS1","operator_code":"BOS1","reported_value":38.2,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"campus","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/boston","title":"Top Boston Data Centers | Colocation Power in Boston | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763206+00:00","sha256":"0d57c9a24802035bb6739ad97b04c16d16eeaa25ed1ae7e90ef511e313917c42","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-BOS-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.355276+00:00","sha256":"8bba76918201b37d4800f50eeb6f25dc36a833a8d76e31c9797daa18e6ce7163","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-3a9f2121ef11280d0b6d","entity_name":"Csquare BOS4","operator_code":"BOS4","reported_value":14.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/boston","title":"Top Boston Data Centers | Colocation Power in Boston | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763206+00:00","sha256":"0d57c9a24802035bb6739ad97b04c16d16eeaa25ed1ae7e90ef511e313917c42","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-BOS-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.355276+00:00","sha256":"8bba76918201b37d4800f50eeb6f25dc36a833a8d76e31c9797daa18e6ce7163","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-1633a36edb1983aebe23","entity_name":"Csquare BOS4","operator_code":"BOS4","reported_value":4.0,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/boston","title":"Top Boston Data Centers | Colocation Power in Boston | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763206+00:00","sha256":"0d57c9a24802035bb6739ad97b04c16d16eeaa25ed1ae7e90ef511e313917c42","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-BOS-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.355276+00:00","sha256":"8bba76918201b37d4800f50eeb6f25dc36a833a8d76e31c9797daa18e6ce7163","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-3ecd003d9e90895cdfa8","entity_name":"Csquare BOS4","operator_code":"BOS4","reported_value":19.1,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/boston","title":"Top Boston Data Centers | Colocation Power in Boston | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763206+00:00","sha256":"0d57c9a24802035bb6739ad97b04c16d16eeaa25ed1ae7e90ef511e313917c42","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-BOS-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.355276+00:00","sha256":"8bba76918201b37d4800f50eeb6f25dc36a833a8d76e31c9797daa18e6ce7163","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-3f0c992adbe370dd4fe5","entity_name":"Csquare CMH1","operator_code":"CMH1","reported_value":3.8,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/columbus","title":"Columbus Data Centers | Ohio Colocation | Power Available Now | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.018225+00:00","sha256":"48da3584a1c150aac98302e9cc436681b480df2d47ebb9664568c750e767fda9","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-CMH-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.474891+00:00","sha256":"686e090e62768e2e3dcd2cf9de805c82595f38941771e4b4e66c0a03403dc611","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-a29823247127e6aeddbe","entity_name":"Csquare CMH1","operator_code":"CMH1","reported_value":1.8,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/columbus","title":"Columbus Data Centers | Ohio Colocation | Power Available Now | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.018225+00:00","sha256":"48da3584a1c150aac98302e9cc436681b480df2d47ebb9664568c750e767fda9","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-CMH-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.474891+00:00","sha256":"686e090e62768e2e3dcd2cf9de805c82595f38941771e4b4e66c0a03403dc611","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-53c0d5b0a7159a33b7ae","entity_name":"Csquare CMH1","operator_code":"CMH1","reported_value":35.8,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/columbus","title":"Columbus Data Centers | Ohio Colocation | Power Available Now | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.018225+00:00","sha256":"48da3584a1c150aac98302e9cc436681b480df2d47ebb9664568c750e767fda9","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-CMH-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.474891+00:00","sha256":"686e090e62768e2e3dcd2cf9de805c82595f38941771e4b4e66c0a03403dc611","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-4a317f965d4470332ad5","entity_name":"Csquare DEN1","operator_code":"DEN1","reported_value":15.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/denver","title":"Top Denver Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288526+00:00","sha256":"300a138ed39e232e393f50c7f5f47bb441f3b14f5e8d2eb0aae0e406d1ed93a6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.483059+00:00","sha256":"84ecba0e98b8e718a3fdbda2f3caea4c42d7d8760d7cc17cb22be69d4adabd73","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-0f3dc306a3c6f348c302","entity_name":"Csquare DEN1","operator_code":"DEN1","reported_value":9.2,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/denver","title":"Top Denver Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288526+00:00","sha256":"300a138ed39e232e393f50c7f5f47bb441f3b14f5e8d2eb0aae0e406d1ed93a6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.483059+00:00","sha256":"84ecba0e98b8e718a3fdbda2f3caea4c42d7d8760d7cc17cb22be69d4adabd73","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-9041118b0b6ff820a29a","entity_name":"Csquare DEN1","operator_code":"DEN1","reported_value":18.3,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/denver","title":"Top Denver Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288526+00:00","sha256":"300a138ed39e232e393f50c7f5f47bb441f3b14f5e8d2eb0aae0e406d1ed93a6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.483059+00:00","sha256":"84ecba0e98b8e718a3fdbda2f3caea4c42d7d8760d7cc17cb22be69d4adabd73","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-152ab7fdc6cfa9b728db","entity_name":"Csquare DEN2","operator_code":"DEN2","reported_value":6.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/denver","title":"Top Denver Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288526+00:00","sha256":"300a138ed39e232e393f50c7f5f47bb441f3b14f5e8d2eb0aae0e406d1ed93a6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.483059+00:00","sha256":"84ecba0e98b8e718a3fdbda2f3caea4c42d7d8760d7cc17cb22be69d4adabd73","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-c7369397bed4b27350b2","entity_name":"Csquare DEN2","operator_code":"DEN2","reported_value":3.8,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/denver","title":"Top Denver Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288526+00:00","sha256":"300a138ed39e232e393f50c7f5f47bb441f3b14f5e8d2eb0aae0e406d1ed93a6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.483059+00:00","sha256":"84ecba0e98b8e718a3fdbda2f3caea4c42d7d8760d7cc17cb22be69d4adabd73","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-1399c0bf8eaa0ee6397c","entity_name":"Csquare DEN2","operator_code":"DEN2","reported_value":27.4,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/denver","title":"Top Denver Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288526+00:00","sha256":"300a138ed39e232e393f50c7f5f47bb441f3b14f5e8d2eb0aae0e406d1ed93a6","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DEN-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.483059+00:00","sha256":"84ecba0e98b8e718a3fdbda2f3caea4c42d7d8760d7cc17cb22be69d4adabd73","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-f36114ea1a796181aeb6","entity_name":"Csquare DFW1","operator_code":"DFW1","reported_value":24.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/dallas-fortworth","title":"Dallas/Fort Worth Data Centers | Colocation Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:48:25.238368+00:00","sha256":"04d47e83f1ebe67d7a1f000dc7627b1d99239c30e69504c4039f5fbedf629ae5","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DFW-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:55:35.354950+00:00","sha256":"f7965eb0de6838a03030d6db850ce573eeca45e497f32d598ab9c6583d320c66","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-410e8490a1e143733429","entity_name":"Csquare DFW1","operator_code":"DFW1","reported_value":16.4,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/dallas-fortworth","title":"Dallas/Fort Worth Data Centers | Colocation Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:48:25.238368+00:00","sha256":"04d47e83f1ebe67d7a1f000dc7627b1d99239c30e69504c4039f5fbedf629ae5","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DFW-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:55:35.354950+00:00","sha256":"f7965eb0de6838a03030d6db850ce573eeca45e497f32d598ab9c6583d320c66","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-5e2de13c0d5bb3fd8111","entity_name":"Csquare DFW1","operator_code":"DFW1","reported_value":51.9,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/dallas-fortworth","title":"Dallas/Fort Worth Data Centers | Colocation Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:48:25.238368+00:00","sha256":"04d47e83f1ebe67d7a1f000dc7627b1d99239c30e69504c4039f5fbedf629ae5","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DFW-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:55:35.354950+00:00","sha256":"f7965eb0de6838a03030d6db850ce573eeca45e497f32d598ab9c6583d320c66","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-1b8876e2ed3c99f1a950","entity_name":"Csquare DFW2","operator_code":"DFW2","reported_value":14.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Source utility 8.6 MW is less than source UPS 14 MW. No repair or inference; seek operator clarification."],"sources":[{"url":"https://www.csquare.com/data-centers/dallas-fortworth","title":"Dallas/Fort Worth Data Centers | Colocation Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:48:25.238368+00:00","sha256":"04d47e83f1ebe67d7a1f000dc7627b1d99239c30e69504c4039f5fbedf629ae5","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DFW-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:55:35.354950+00:00","sha256":"f7965eb0de6838a03030d6db850ce573eeca45e497f32d598ab9c6583d320c66","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-142e1ab36ea7ce962e93","entity_name":"Csquare DFW2","operator_code":"DFW2","reported_value":14.0,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Source utility 8.6 MW is less than source UPS 14 MW. No repair or inference; seek operator clarification."],"sources":[{"url":"https://www.csquare.com/data-centers/dallas-fortworth","title":"Dallas/Fort Worth Data Centers | Colocation Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:48:25.238368+00:00","sha256":"04d47e83f1ebe67d7a1f000dc7627b1d99239c30e69504c4039f5fbedf629ae5","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DFW-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:55:35.354950+00:00","sha256":"f7965eb0de6838a03030d6db850ce573eeca45e497f32d598ab9c6583d320c66","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-85d114de16b53acf8ab3","entity_name":"Csquare DFW2","operator_code":"DFW2","reported_value":8.6,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Source utility 8.6 MW is less than source UPS 14 MW. No repair or inference; seek operator clarification."],"sources":[{"url":"https://www.csquare.com/data-centers/dallas-fortworth","title":"Dallas/Fort Worth Data Centers | Colocation Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:48:25.238368+00:00","sha256":"04d47e83f1ebe67d7a1f000dc7627b1d99239c30e69504c4039f5fbedf629ae5","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DFW-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:55:35.354950+00:00","sha256":"f7965eb0de6838a03030d6db850ce573eeca45e497f32d598ab9c6583d320c66","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-514fdd50f52345cfe651","entity_name":"Csquare DFW3","operator_code":"DFW3","reported_value":10.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/dallas-fortworth","title":"Dallas/Fort Worth Data Centers | Colocation Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:48:25.238368+00:00","sha256":"04d47e83f1ebe67d7a1f000dc7627b1d99239c30e69504c4039f5fbedf629ae5","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DFW-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:55:35.354950+00:00","sha256":"f7965eb0de6838a03030d6db850ce573eeca45e497f32d598ab9c6583d320c66","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-f779a46811b0182da7e4","entity_name":"Csquare DFW3","operator_code":"DFW3","reported_value":4.8,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/dallas-fortworth","title":"Dallas/Fort Worth Data Centers | Colocation Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:48:25.238368+00:00","sha256":"04d47e83f1ebe67d7a1f000dc7627b1d99239c30e69504c4039f5fbedf629ae5","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DFW-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:55:35.354950+00:00","sha256":"f7965eb0de6838a03030d6db850ce573eeca45e497f32d598ab9c6583d320c66","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-75a4f8bfabeb54ec930f","entity_name":"Csquare DFW3","operator_code":"DFW3","reported_value":18.3,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/dallas-fortworth","title":"Dallas/Fort Worth Data Centers | Colocation Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:48:25.238368+00:00","sha256":"04d47e83f1ebe67d7a1f000dc7627b1d99239c30e69504c4039f5fbedf629ae5","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-DFW-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:55:35.354950+00:00","sha256":"f7965eb0de6838a03030d6db850ce573eeca45e497f32d598ab9c6583d320c66","source_family":"operator_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-4037dffa2a4f17c9a229","entity_name":"Csquare EWR2","operator_code":"EWR2","reported_value":31.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","title":"New York/New Jersey Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288453+00:00","sha256":"2a18cc9bdd6b9ca72fc49281516054414a249fc1094e5efbec87d047c7f6fec7","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.579072+00:00","sha256":"d7111395a4e0a80cb64a2ab8274ed7b9da6e8ad6da5ffd991f3e8b2a895595e4","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-18cae899799cb4645990","entity_name":"Csquare EWR2","operator_code":"EWR2","reported_value":20.7,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","title":"New York/New Jersey Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288453+00:00","sha256":"2a18cc9bdd6b9ca72fc49281516054414a249fc1094e5efbec87d047c7f6fec7","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.579072+00:00","sha256":"d7111395a4e0a80cb64a2ab8274ed7b9da6e8ad6da5ffd991f3e8b2a895595e4","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-9d2ea0ad779d55035627","entity_name":"Csquare EWR2","operator_code":"EWR2","reported_value":45.7,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","title":"New York/New Jersey Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288453+00:00","sha256":"2a18cc9bdd6b9ca72fc49281516054414a249fc1094e5efbec87d047c7f6fec7","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.579072+00:00","sha256":"d7111395a4e0a80cb64a2ab8274ed7b9da6e8ad6da5ffd991f3e8b2a895595e4","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-cd144f8e48ba15293806","entity_name":"Csquare EWR3","operator_code":"EWR3","reported_value":14.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","title":"New York/New Jersey Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288453+00:00","sha256":"2a18cc9bdd6b9ca72fc49281516054414a249fc1094e5efbec87d047c7f6fec7","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.579072+00:00","sha256":"d7111395a4e0a80cb64a2ab8274ed7b9da6e8ad6da5ffd991f3e8b2a895595e4","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-28dca5a34cad5c8135a0","entity_name":"Csquare EWR3","operator_code":"EWR3","reported_value":8.1,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","title":"New York/New Jersey Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288453+00:00","sha256":"2a18cc9bdd6b9ca72fc49281516054414a249fc1094e5efbec87d047c7f6fec7","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.579072+00:00","sha256":"d7111395a4e0a80cb64a2ab8274ed7b9da6e8ad6da5ffd991f3e8b2a895595e4","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-ec72f210ab131326ec31","entity_name":"Csquare EWR3","operator_code":"EWR3","reported_value":54.8,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","title":"New York/New Jersey Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288453+00:00","sha256":"2a18cc9bdd6b9ca72fc49281516054414a249fc1094e5efbec87d047c7f6fec7","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.579072+00:00","sha256":"d7111395a4e0a80cb64a2ab8274ed7b9da6e8ad6da5ffd991f3e8b2a895595e4","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-53f47203d26cd2523ed7","entity_name":"Csquare EWR5","operator_code":"EWR5","reported_value":16.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","title":"New York/New Jersey Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288453+00:00","sha256":"2a18cc9bdd6b9ca72fc49281516054414a249fc1094e5efbec87d047c7f6fec7","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.579072+00:00","sha256":"d7111395a4e0a80cb64a2ab8274ed7b9da6e8ad6da5ffd991f3e8b2a895595e4","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-2622e97f55a3948d2049","entity_name":"Csquare EWR5","operator_code":"EWR5","reported_value":11.6,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","title":"New York/New Jersey Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288453+00:00","sha256":"2a18cc9bdd6b9ca72fc49281516054414a249fc1094e5efbec87d047c7f6fec7","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.579072+00:00","sha256":"d7111395a4e0a80cb64a2ab8274ed7b9da6e8ad6da5ffd991f3e8b2a895595e4","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-3a7201333f9920af30d3","entity_name":"Csquare EWR5","operator_code":"EWR5","reported_value":26.3,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/new-york-new-jersey","title":"New York/New Jersey Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288453+00:00","sha256":"2a18cc9bdd6b9ca72fc49281516054414a249fc1094e5efbec87d047c7f6fec7","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-EWR-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.579072+00:00","sha256":"d7111395a4e0a80cb64a2ab8274ed7b9da6e8ad6da5ffd991f3e8b2a895595e4","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-67bb2e4ad9b92307cb54","entity_name":"Csquare IAD1","operator_code":"IAD1","reported_value":37.5,"reported_unit":"MW","kind":"backup_nameplate","scope":"campus","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-394885b320b730d62388","entity_name":"Csquare IAD1","operator_code":"IAD1","reported_value":19.8,"reported_unit":"MW","kind":"ups_output_capacity","scope":"campus","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-8867cc541f894ec67b47","entity_name":"Csquare IAD1","operator_code":"IAD1","reported_value":143.2,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"campus","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-74ef6de995890282ce2f","entity_name":"Csquare IAD2","operator_code":"IAD2","reported_value":20.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"campus","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-6544192f1f83ee71252d","entity_name":"Csquare IAD2","operator_code":"IAD2","reported_value":8.5,"reported_unit":"MW","kind":"ups_output_capacity","scope":"campus","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-15fc2725d45c54fa38d8","entity_name":"Csquare IAD2","operator_code":"IAD2","reported_value":35.8,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"campus","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-afaafd20eba95a88fe9a","entity_name":"Csquare IAD3","operator_code":"IAD3","reported_value":4.5,"reported_unit":"MW","kind":"backup_nameplate","scope":"building","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-c64b1a55aee5bac8b624","entity_name":"Csquare IAD3","operator_code":"IAD3","reported_value":2.9,"reported_unit":"MW","kind":"ups_output_capacity","scope":"building","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-bfd69f718c02a1de5cba","entity_name":"Csquare IAD3","operator_code":"IAD3","reported_value":23.9,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"building","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-827d2fe619f6c3f48a20","entity_name":"Csquare IAD4","operator_code":"IAD4","reported_value":20.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"campus","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-4850566bd619e5527a02","entity_name":"Csquare IAD4","operator_code":"IAD4","reported_value":16.8,"reported_unit":"MW","kind":"ups_output_capacity","scope":"campus","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-65b51b01a4db4550e6b5","entity_name":"Csquare IAD4","operator_code":"IAD4","reported_value":35.8,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"campus","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/northern-virginia","title":"Top Northern Virginia/DC Area Colocation Data Centers | Power Ready","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.509440+00:00","sha256":"242ffbb10cf101e9f2714cafb7f257e5870106024f39a4482f0df4e512f11d23","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-IAD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T01:48:25.762930+00:00","sha256":"3294b6442a57bc30a39b02b64838639a255595d4dac1c4ba4457f8cfba0dc339","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-83455593d3d1a3d150ba","entity_name":"Csquare LAX3","operator_code":"LAX3","reported_value":16.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","title":"Top Los Angeles Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.257170+00:00","sha256":"766b90addb14f2b88f0d0de63cfc7dd8ef56b1f8320a2ed6299b4f73960108df","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-LAX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.564512+00:00","sha256":"4f3f8f438b35b64241401746ef0b3c939eec316adc9b83145e1ce11795edfe5c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-68f57ed9611cb1360d1b","entity_name":"Csquare LAX3","operator_code":"LAX3","reported_value":9.2,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","title":"Top Los Angeles Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.257170+00:00","sha256":"766b90addb14f2b88f0d0de63cfc7dd8ef56b1f8320a2ed6299b4f73960108df","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-LAX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.564512+00:00","sha256":"4f3f8f438b35b64241401746ef0b3c939eec316adc9b83145e1ce11795edfe5c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-505c35f770a4e9174fe6","entity_name":"Csquare LAX3","operator_code":"LAX3","reported_value":24.9,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","title":"Top Los Angeles Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.257170+00:00","sha256":"766b90addb14f2b88f0d0de63cfc7dd8ef56b1f8320a2ed6299b4f73960108df","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-LAX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.564512+00:00","sha256":"4f3f8f438b35b64241401746ef0b3c939eec316adc9b83145e1ce11795edfe5c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-396760c54fd586b7ac01","entity_name":"Csquare LAX4","operator_code":"LAX4","reported_value":4.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Linked market PDF omits this facility; address identity unresolved."],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","title":"Top Los Angeles Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.257170+00:00","sha256":"766b90addb14f2b88f0d0de63cfc7dd8ef56b1f8320a2ed6299b4f73960108df","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-97574643b2c55fb80ff8","entity_name":"Csquare LAX4","operator_code":"LAX4","reported_value":2.7,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Linked market PDF omits this facility; address identity unresolved."],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","title":"Top Los Angeles Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.257170+00:00","sha256":"766b90addb14f2b88f0d0de63cfc7dd8ef56b1f8320a2ed6299b4f73960108df","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-8db7364edbd1135f3ea3","entity_name":"Csquare LAX4","operator_code":"LAX4","reported_value":25.9,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Linked market PDF omits this facility; address identity unresolved."],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","title":"Top Los Angeles Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.257170+00:00","sha256":"766b90addb14f2b88f0d0de63cfc7dd8ef56b1f8320a2ed6299b4f73960108df","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-08d755fbb77ceb1426e8","entity_name":"Csquare LAX5","operator_code":"LAX5","reported_value":12.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","title":"Top Los Angeles Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.257170+00:00","sha256":"766b90addb14f2b88f0d0de63cfc7dd8ef56b1f8320a2ed6299b4f73960108df","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-LAX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.564512+00:00","sha256":"4f3f8f438b35b64241401746ef0b3c939eec316adc9b83145e1ce11795edfe5c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-eb18850021668fc4df45","entity_name":"Csquare LAX5","operator_code":"LAX5","reported_value":5.6,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","title":"Top Los Angeles Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.257170+00:00","sha256":"766b90addb14f2b88f0d0de63cfc7dd8ef56b1f8320a2ed6299b4f73960108df","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-LAX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.564512+00:00","sha256":"4f3f8f438b35b64241401746ef0b3c939eec316adc9b83145e1ce11795edfe5c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-093ee26d5ac7b061d694","entity_name":"Csquare LAX5","operator_code":"LAX5","reported_value":17.3,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/los-angeles","title":"Top Los Angeles Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.257170+00:00","sha256":"766b90addb14f2b88f0d0de63cfc7dd8ef56b1f8320a2ed6299b4f73960108df","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-LAX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.564512+00:00","sha256":"4f3f8f438b35b64241401746ef0b3c939eec316adc9b83145e1ce11795edfe5c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-b22487399ef2cb8ea926","entity_name":"Csquare MSP1","operator_code":"MSP1","reported_value":3.6,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/minneapolis","title":"Top Minneapolis Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288897+00:00","sha256":"3d64ea3079d3c4e61a71846e1477b5a009fa48c39c8932d93143a0710dcaac9e","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-MSP-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.549054+00:00","sha256":"abf345e28ac78825bedd2b633d35be751858217bf9110ca3022ef1317e9ebf9e","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-3ce7464d3548a9c337cc","entity_name":"Csquare MSP1","operator_code":"MSP1","reported_value":2.4,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/minneapolis","title":"Top Minneapolis Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288897+00:00","sha256":"3d64ea3079d3c4e61a71846e1477b5a009fa48c39c8932d93143a0710dcaac9e","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-MSP-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.549054+00:00","sha256":"abf345e28ac78825bedd2b633d35be751858217bf9110ca3022ef1317e9ebf9e","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-267eb82f21d6145c72c5","entity_name":"Csquare MSP1","operator_code":"MSP1","reported_value":19.1,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/minneapolis","title":"Top Minneapolis Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.288897+00:00","sha256":"3d64ea3079d3c4e61a71846e1477b5a009fa48c39c8932d93143a0710dcaac9e","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-MSP-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.549054+00:00","sha256":"abf345e28ac78825bedd2b633d35be751858217bf9110ca3022ef1317e9ebf9e","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-1cc5656694be63163dbe","entity_name":"Csquare ORD1","operator_code":"ORD1","reported_value":16.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"tenant_suite","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","title":"Top Chicago Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763642+00:00","sha256":"f8589964f8e9f7903619e1c93cdcfb31966b3d60069e60dba2ada7704f47b660","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.355477+00:00","sha256":"e017b137f2f0ba03cef530f08a2e78b4741db8e92d7d4ee9cad755911d2c2780","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-5e0e5dc253992d67d880","entity_name":"Csquare ORD1","operator_code":"ORD1","reported_value":8.8,"reported_unit":"MW","kind":"ups_output_capacity","scope":"tenant_suite","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","title":"Top Chicago Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763642+00:00","sha256":"f8589964f8e9f7903619e1c93cdcfb31966b3d60069e60dba2ada7704f47b660","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.355477+00:00","sha256":"e017b137f2f0ba03cef530f08a2e78b4741db8e92d7d4ee9cad755911d2c2780","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-51d6d33068fa9922558e","entity_name":"Csquare ORD1","operator_code":"ORD1","reported_value":32.8,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"tenant_suite","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","title":"Top Chicago Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763642+00:00","sha256":"f8589964f8e9f7903619e1c93cdcfb31966b3d60069e60dba2ada7704f47b660","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.355477+00:00","sha256":"e017b137f2f0ba03cef530f08a2e78b4741db8e92d7d4ee9cad755911d2c2780","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-27aae5ba98b9dc39d904","entity_name":"Csquare ORD2","operator_code":"ORD2","reported_value":22.8,"reported_unit":"MW","kind":"backup_nameplate","scope":"building","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","title":"Top Chicago Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763642+00:00","sha256":"f8589964f8e9f7903619e1c93cdcfb31966b3d60069e60dba2ada7704f47b660","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.355477+00:00","sha256":"e017b137f2f0ba03cef530f08a2e78b4741db8e92d7d4ee9cad755911d2c2780","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-7a5ac4996cba88d66aa3","entity_name":"Csquare ORD2","operator_code":"ORD2","reported_value":12.7,"reported_unit":"MW","kind":"ups_output_capacity","scope":"building","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","title":"Top Chicago Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763642+00:00","sha256":"f8589964f8e9f7903619e1c93cdcfb31966b3d60069e60dba2ada7704f47b660","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.355477+00:00","sha256":"e017b137f2f0ba03cef530f08a2e78b4741db8e92d7d4ee9cad755911d2c2780","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-c6f69634d0f5e2445630","entity_name":"Csquare ORD2","operator_code":"ORD2","reported_value":25.9,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"building","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","title":"Top Chicago Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763642+00:00","sha256":"f8589964f8e9f7903619e1c93cdcfb31966b3d60069e60dba2ada7704f47b660","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.355477+00:00","sha256":"e017b137f2f0ba03cef530f08a2e78b4741db8e92d7d4ee9cad755911d2c2780","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-5511e5e8a3e78a2d0bba","entity_name":"Csquare ORD4","operator_code":"ORD4","reported_value":14.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","title":"Top Chicago Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763642+00:00","sha256":"f8589964f8e9f7903619e1c93cdcfb31966b3d60069e60dba2ada7704f47b660","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.355477+00:00","sha256":"e017b137f2f0ba03cef530f08a2e78b4741db8e92d7d4ee9cad755911d2c2780","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-a82377f151f4cabcc7ec","entity_name":"Csquare ORD4","operator_code":"ORD4","reported_value":3.6,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","title":"Top Chicago Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763642+00:00","sha256":"f8589964f8e9f7903619e1c93cdcfb31966b3d60069e60dba2ada7704f47b660","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.355477+00:00","sha256":"e017b137f2f0ba03cef530f08a2e78b4741db8e92d7d4ee9cad755911d2c2780","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-9affe0410a0c642ee687","entity_name":"Csquare ORD4","operator_code":"ORD4","reported_value":88.9,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/chicago","title":"Top Chicago Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:07.763642+00:00","sha256":"f8589964f8e9f7903619e1c93cdcfb31966b3d60069e60dba2ada7704f47b660","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ORD-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.355477+00:00","sha256":"e017b137f2f0ba03cef530f08a2e78b4741db8e92d7d4ee9cad755911d2c2780","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-f20491b76e2c60014a9c","entity_name":"Csquare PHX1","operator_code":"PHX1","reported_value":13.3,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/phoenix","title":"Phoenix Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537697+00:00","sha256":"9c665acce0166f8decac9c9c1d6553e7476966a3d878c3d955dca72fbb65e8dd","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-PHX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.761428+00:00","sha256":"b8a140ce2cea0f2c9f12e95a55050e84611f30329aa435123c5050edf2169e8c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-6440becc9d9960124895","entity_name":"Csquare PHX3","operator_code":"PHX3","reported_value":11.5,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Inventory uses legacy PHX1 Mesa name. Current primary PHX3 matches 1301 West University; do not match current PHX1 Phoenix."],"sources":[{"url":"https://www.csquare.com/data-centers/phoenix","title":"Phoenix Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537697+00:00","sha256":"9c665acce0166f8decac9c9c1d6553e7476966a3d878c3d955dca72fbb65e8dd","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-PHX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.761428+00:00","sha256":"b8a140ce2cea0f2c9f12e95a55050e84611f30329aa435123c5050edf2169e8c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-fc6ca7ea928fa55b10e4","entity_name":"Csquare PHX3","operator_code":"PHX3","reported_value":8.0,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Inventory uses legacy PHX1 Mesa name. Current primary PHX3 matches 1301 West University; do not match current PHX1 Phoenix."],"sources":[{"url":"https://www.csquare.com/data-centers/phoenix","title":"Phoenix Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537697+00:00","sha256":"9c665acce0166f8decac9c9c1d6553e7476966a3d878c3d955dca72fbb65e8dd","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-PHX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.761428+00:00","sha256":"b8a140ce2cea0f2c9f12e95a55050e84611f30329aa435123c5050edf2169e8c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-b163fb68c9ce9799ff31","entity_name":"Csquare PHX3","operator_code":"PHX3","reported_value":17.3,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Inventory uses legacy PHX1 Mesa name. Current primary PHX3 matches 1301 West University; do not match current PHX1 Phoenix."],"sources":[{"url":"https://www.csquare.com/data-centers/phoenix","title":"Phoenix Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537697+00:00","sha256":"9c665acce0166f8decac9c9c1d6553e7476966a3d878c3d955dca72fbb65e8dd","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-PHX-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.761428+00:00","sha256":"b8a140ce2cea0f2c9f12e95a55050e84611f30329aa435123c5050edf2169e8c","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::csquare-sea1-backup","entity_name":"Csquare SEA1","operator_code":"SEA1","reported_value":19.5,"reported_unit":"MW","kind":"backup_generation_capacity","scope":"operator_multi_site","qualifier":"Two addresses are explicitly listed on SEA1 page. Do not apportion quantities to either physical building. Keep utility supply, UPS and backup generation as separate native quantities. Utility capacity is not an executed service commitment or total facility demand. No status inference.","comparison":null,"as_of":null,"as_of_basis":"Undated technical values; copyright year and retrieval are not fact dates","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf","title":"centersquaredc.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T04:42:25.122416+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-30f03dabad84f5e208a5","entity_name":"Csquare SEA1","operator_code":"SEA1","reported_value":19.5,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/seattle","title":"Top Seattle Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537306+00:00","sha256":"238598c060066ca0d5a59b5a5ab6232904358231dbb0d7eb87adc523fdcf597f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SEA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.832877+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::csquare-sea1-ups","entity_name":"Csquare SEA1","operator_code":"SEA1","reported_value":10.8,"reported_unit":"MW","kind":"ups_nameplate_capacity","scope":"operator_multi_site","qualifier":"Two addresses are explicitly listed on SEA1 page. Do not apportion quantities to either physical building. Keep utility supply, UPS and backup generation as separate native quantities. Utility capacity is not an executed service commitment or total facility demand. No status inference.","comparison":null,"as_of":null,"as_of_basis":"Undated technical values; copyright year and retrieval are not fact dates","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf","title":"centersquaredc.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T04:42:25.122416+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-f682694129983e212907","entity_name":"Csquare SEA1","operator_code":"SEA1","reported_value":10.8,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/seattle","title":"Top Seattle Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537306+00:00","sha256":"238598c060066ca0d5a59b5a5ab6232904358231dbb0d7eb87adc523fdcf597f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SEA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.832877+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::csquare-sea1-utility","entity_name":"Csquare SEA1","operator_code":"SEA1","reported_value":109,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_multi_site","qualifier":"Two addresses are explicitly listed on SEA1 page. Do not apportion quantities to either physical building. Keep utility supply, UPS and backup generation as separate native quantities. Utility capacity is not an executed service commitment or total facility demand. No status inference.","comparison":null,"as_of":null,"as_of_basis":"Undated technical values; copyright year and retrieval are not fact dates","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf","title":"centersquaredc.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T04:42:25.122416+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-6db9cff9d26518b0a32b","entity_name":"Csquare SEA1","operator_code":"SEA1","reported_value":109.0,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/seattle","title":"Top Seattle Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537306+00:00","sha256":"238598c060066ca0d5a59b5a5ab6232904358231dbb0d7eb87adc523fdcf597f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SEA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.832877+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::csquare-sea2-backup","entity_name":"Csquare SEA2","operator_code":"SEA2","reported_value":10,"reported_unit":"MW","kind":"backup_generation_capacity","scope":"operator_facility","qualifier":"Exact primary address matches an accepted building record, but the operator electrical scope is not independently proved to cover every host tenant. Keep utility supply, UPS and backup generation as separate native quantities. Utility capacity is not an executed service commitment or total facility demand. No status inference.","comparison":null,"as_of":null,"as_of_basis":"Undated technical values; copyright year and retrieval are not fact dates","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf","title":"centersquaredc.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T04:42:25.122416+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-82a5759835508bf408cd","entity_name":"Csquare SEA2","operator_code":"SEA2","reported_value":10.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/seattle","title":"Top Seattle Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537306+00:00","sha256":"238598c060066ca0d5a59b5a5ab6232904358231dbb0d7eb87adc523fdcf597f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SEA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.832877+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::csquare-sea2-ups","entity_name":"Csquare SEA2","operator_code":"SEA2","reported_value":2.9,"reported_unit":"MW","kind":"ups_nameplate_capacity","scope":"operator_facility","qualifier":"Exact primary address matches an accepted building record, but the operator electrical scope is not independently proved to cover every host tenant. Keep utility supply, UPS and backup generation as separate native quantities. Utility capacity is not an executed service commitment or total facility demand. No status inference.","comparison":null,"as_of":null,"as_of_basis":"Undated technical values; copyright year and retrieval are not fact dates","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf","title":"centersquaredc.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T04:42:25.122416+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-ea8e9583e798ca0e022c","entity_name":"Csquare SEA2","operator_code":"SEA2","reported_value":2.9,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/seattle","title":"Top Seattle Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537306+00:00","sha256":"238598c060066ca0d5a59b5a5ab6232904358231dbb0d7eb87adc523fdcf597f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SEA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.832877+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::csquare-sea2-utility","entity_name":"Csquare SEA2","operator_code":"SEA2","reported_value":8.6,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Exact primary address matches an accepted building record, but the operator electrical scope is not independently proved to cover every host tenant. Keep utility supply, UPS and backup generation as separate native quantities. Utility capacity is not an executed service commitment or total facility demand. No status inference.","comparison":null,"as_of":null,"as_of_basis":"Undated technical values; copyright year and retrieval are not fact dates","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf","title":"centersquaredc.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T04:42:25.122416+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-c977b1fd76ff18d8fcfe","entity_name":"Csquare SEA2","operator_code":"SEA2","reported_value":8.6,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/seattle","title":"Top Seattle Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537306+00:00","sha256":"238598c060066ca0d5a59b5a5ab6232904358231dbb0d7eb87adc523fdcf597f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SEA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.832877+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::csquare-sea3-backup","entity_name":"Csquare SEA3","operator_code":"SEA3","reported_value":6,"reported_unit":"MW","kind":"backup_generation_capacity","scope":"operator_facility","qualifier":"Exact primary address matches an accepted building record, but the operator electrical scope is not independently proved to cover every host tenant. Keep utility supply, UPS and backup generation as separate native quantities. Utility capacity is not an executed service commitment or total facility demand. No status inference.","comparison":null,"as_of":null,"as_of_basis":"Undated technical values; copyright year and retrieval are not fact dates","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf","title":"centersquaredc.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T04:42:25.122416+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-0a0d5e7ed1d3e55bb459","entity_name":"Csquare SEA3","operator_code":"SEA3","reported_value":6.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/seattle","title":"Top Seattle Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537306+00:00","sha256":"238598c060066ca0d5a59b5a5ab6232904358231dbb0d7eb87adc523fdcf597f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SEA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.832877+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::csquare-sea3-ups","entity_name":"Csquare SEA3","operator_code":"SEA3","reported_value":1.8,"reported_unit":"MW","kind":"ups_nameplate_capacity","scope":"operator_facility","qualifier":"Exact primary address matches an accepted building record, but the operator electrical scope is not independently proved to cover every host tenant. Keep utility supply, UPS and backup generation as separate native quantities. Utility capacity is not an executed service commitment or total facility demand. No status inference.","comparison":null,"as_of":null,"as_of_basis":"Undated technical values; copyright year and retrieval are not fact dates","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf","title":"centersquaredc.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T04:42:25.122416+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-fc7568506ab6f668dc43","entity_name":"Csquare SEA3","operator_code":"SEA3","reported_value":1.8,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/seattle","title":"Top Seattle Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537306+00:00","sha256":"238598c060066ca0d5a59b5a5ab6232904358231dbb0d7eb87adc523fdcf597f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SEA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.832877+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::csquare-sea3-utility","entity_name":"Csquare SEA3","operator_code":"SEA3","reported_value":17.3,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Exact primary address matches an accepted building record, but the operator electrical scope is not independently proved to cover every host tenant. Keep utility supply, UPS and backup generation as separate native quantities. Utility capacity is not an executed service commitment or total facility demand. No status inference.","comparison":null,"as_of":null,"as_of_basis":"Undated technical values; copyright year and retrieval are not fact dates","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://centersquaredc.com/hubfs/CenterSquare/docs/Centersquare-SEA-SpecSheet.pdf","title":"centersquaredc.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T04:42:25.122416+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-ac86964b3a48ecfd4782","entity_name":"Csquare SEA3","operator_code":"SEA3","reported_value":17.3,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/seattle","title":"Top Seattle Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.537306+00:00","sha256":"238598c060066ca0d5a59b5a5ab6232904358231dbb0d7eb87adc523fdcf597f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SEA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.832877+00:00","sha256":"59dbfcbdb4002a6d7cbf1c0b94bbb58ce97ec3edc84cc5c48e94a0acb732879f","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-2bdfc69ecc71b4c471f6","entity_name":"Csquare SFO1","operator_code":"SFO1","reported_value":17.5,"reported_unit":"MW","kind":"backup_nameplate","scope":"campus","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Source prose refers to SFO1 and SFO2 inside SFO1 section. Address group preserved; no per-building allocation."],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-958c768f97a9a96eab6f","entity_name":"Csquare SFO1","operator_code":"SFO1","reported_value":11.2,"reported_unit":"MW","kind":"ups_output_capacity","scope":"campus","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Source prose refers to SFO1 and SFO2 inside SFO1 section. Address group preserved; no per-building allocation."],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-63c1047bd062e7dd0579","entity_name":"Csquare SFO1","operator_code":"SFO1","reported_value":34.5,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"campus","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Source prose refers to SFO1 and SFO2 inside SFO1 section. Address group preserved; no per-building allocation."],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-ccd1ffb5436dbf6d2848","entity_name":"Csquare SFO2","operator_code":"SFO2","reported_value":22.5,"reported_unit":"MW","kind":"backup_nameplate","scope":"campus","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-be45a0e6aabd913ea31a","entity_name":"Csquare SFO2","operator_code":"SFO2","reported_value":14.1,"reported_unit":"MW","kind":"ups_output_capacity","scope":"campus","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-59ee6c32d17b8a7511f3","entity_name":"Csquare SFO2","operator_code":"SFO2","reported_value":43.2,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"campus","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-60a4dac5f3f9f2b7d7d9","entity_name":"Csquare SFO3","operator_code":"SFO3","reported_value":5.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-da9e25bd13539a5bca91","entity_name":"Csquare SFO3","operator_code":"SFO3","reported_value":3.2,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-6a8c86f9054ec8bbb9db","entity_name":"Csquare SFO3","operator_code":"SFO3","reported_value":8.6,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-e46d79dd4fcce0b54723","entity_name":"Csquare SFO4","operator_code":"SFO4","reported_value":20.5,"reported_unit":"MW","kind":"backup_nameplate","scope":"campus","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-92c45ede1dcf1ff91c0c","entity_name":"Csquare SFO4","operator_code":"SFO4","reported_value":12.3,"reported_unit":"MW","kind":"ups_output_capacity","scope":"campus","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-cbec7620234727f67813","entity_name":"Csquare SFO4","operator_code":"SFO4","reported_value":43.1,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"campus","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/silicon-valley","title":"Silicon Valley Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.575381+00:00","sha256":"310be7c354339ea3d7dba5a1244e0587d1b686c7d36234663d6ab86a106d7731","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-SFO-SpecSheet.pdf","title":"www.csquare.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T01:48:25.904140+00:00","sha256":"d5467d4cb3c55fea0c330b01b543e5e4b3475e52af95fc34dc6a95c3bae048e0","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-992fa4a4010d3e127987","entity_name":"Csquare TPA1","operator_code":"TPA1","reported_value":9.0,"reported_unit":"MW","kind":"backup_nameplate","scope":"operator_facility","qualifier":"Operator aggregate generator capacity; not a facility demand estimate","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/tampa","title":"Tampa Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.600140+00:00","sha256":"e380efb7482541f60c59fdaf6fc9cfd32e4a6c4854967b2fdb50bcb9495f5f46","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-TPA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.802629+00:00","sha256":"6047bcdedcf05b7f8db0c41d1feaffaf945c914bc8012a98aabb240f0fe4de7a","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-554d3118f0f1aa975158","entity_name":"Csquare TPA1","operator_code":"TPA1","reported_value":2.5,"reported_unit":"MW","kind":"ups_output_capacity","scope":"operator_facility","qualifier":"Operator UPS capacity; not automatically critical IT load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/tampa","title":"Tampa Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.600140+00:00","sha256":"e380efb7482541f60c59fdaf6fc9cfd32e4a6c4854967b2fdb50bcb9495f5f46","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-TPA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.802629+00:00","sha256":"6047bcdedcf05b7f8db0c41d1feaffaf945c914bc8012a98aabb240f0fe4de7a","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-ee553e127cd91017484c","entity_name":"Csquare TPA1","operator_code":"TPA1","reported_value":9.0,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"operator_facility","qualifier":"Operator utility capacity; not measured consumption or established total facility design load","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated operator specifications; copyright and retrieval dates are not effective dates","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.csquare.com/data-centers/tampa","title":"Tampa Colocation Data Centers | Power Available | Csquare","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:47:08.600140+00:00","sha256":"e380efb7482541f60c59fdaf6fc9cfd32e4a6c4854967b2fdb50bcb9495f5f46","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"},{"url":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-TPA-SpecSheet.pdf","title":"www.csquare.com","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T01:48:25.802629+00:00","sha256":"6047bcdedcf05b7f8db0c41d1feaffaf945c914bc8012a98aabb240f0fe4de7a","source_family":"operator_power_specification","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"washington-power03::waip02-cyrus-it-project","subject_id":null,"entity_name":"CyrusOne PNW1","operator_code":null,"reported_value":36,"reported_unit":"MW","kind":"it_critical","scope":"project","electrical_extent":"project_total_it_capacity","comparison":"exact","upper_value":null,"qualifier":"Undated page describes 720,000 sqft technical IT and future development land. Exact electrical extent is not tied to the retained 2025 building. Do not assign to roof.","temporal_role":"undated_operator_marketing","as_of":null,"as_of_basis":"Undated source, retrieval timestamp is not an as-of date","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["cyrus-project-building-scope","Parent selected this attributed project or campus quantity for catalog publication only. No building field is authorized."],"catalog_holds":{"additional_holds":["Sabey130/123MW figures conflict within one document. Preserve both and do not sum.","Sabey pages say critical capacity without an explicit IT definition. Retain source extraction it_critical as extraction metadata only, with public kind critical_power_unspecified.","No observed facility demand, per-building allocation, power conversion, status, opening, GFA or currentness inferred.","No scalar field promotion. Catalog rows and project/campus quantities do not count as buildings."],"held_groups":[{"package":"washington_bulk_power_round01","reason":"Awaiting separate parent source review; earlier identity import is not power selection.","selection":"all36catalog_observations"}]},"sources":[{"url":"https://www.cyrusone.com/data-centers/north-america/quincy-washington","title":"cyrus_live","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T13:43:58.642134+00:00","sha256":"c18762166cb2f50c4b67befa3a1cb1b0478cdbd9cec35a7ebe9ddbc89b0a127c","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"source_extraction_kind":"it_critical"},{"id":"power-cacb0ed26dae58e97e8a","entity_name":"CyrusOne Sangamon County campus","operator_code":null,"reported_value":600,"reported_unit":"MW","kind":"forecast_load","scope":"campus","qualifier":"Demand stated in community FAQ question; no building split or observed consumption established","temporal_role":"forecast","as_of":"2025-11-10","as_of_basis":"Date attached to county-reproduced CyrusOne FAQ answer","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://sangamonil.gov/departments/a-c/county-board/proposed-cyrusone-data-center","title":"Proposed CyrusOne Data Center","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:44:01.666839+00:00","sha256":"5e93025150a4beca9aaeff357293a7e16653dd42b3b027e53936aad6c95864bb","source_family":"county_utility","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power03::nfpr03-core-dalton-aggregate-future","subject_id":null,"entity_name":"Dalton Utilities broader outside-provider procurement target","operator_code":null,"reported_value":450,"reported_unit":"MW","kind":"utility_procurement_target","scope":"utility_procurement","electrical_extent":"broader_utility_supply_not_allocated_to_project","comparison":"up_to","upper_value":null,"qualifier":"DU committed commercially reasonable efforts toward up to 450 MW total procurement. Approximately 270 MW of that total is allocated to Dalton 1 and 4 together. Reject 450 MW as their building or campus-group capacity.","temporal_role":"future_commercial_efforts_target","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","title":"core-supplemental-2026","pdf_page":null,"published":"2026-04-21","retrieved_at":"2026-09-18T03:52:28.606000+00:00","sha256":"5f4f71a85f2e2c7ec56fdfefd1c78c9fcb96f1887468a1dc71a4b5efdec86068","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"The Dalton Campuses: utility access and broader procurement","text_lines_1_based":[228,229],"text_character_span":[20679,21079],"normalized_text_character_span":[20679,21079]}],"text_sha256":"9411009a9b42f4bacb54bc335fb5e21c622f77cfc196ca7f3448b5114a756707","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-04-21","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-04-21","sec_filing_date":"2026-04-21","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"dalton-utility-access-procurement","identity_state":"unresolved_no_record_association","correction_ids":["C01-dalton450-utility-scope"],"source_observation_id":"nfpr03-core-dalton-aggregate-future","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"power-primary04::dc-9c7cf487e920e58b:operator_it_context","subject_id":"dc-9c7cf487e920e58b","entity_name":"DartPoints Baton Rouge 1","operator_code":"BTR01","reported_value":500,"reported_unit":"kW","kind":"it_critical","scope":"operator_facility","electrical_extent":"named_operator_IT_boundary_whole_physical_host_unknown","comparison":"equal","upper_value":null,"qualifier":"Native named operator Critical IT Load only. Explicit suite/unit where reported. Whole physical-host IT total is unestablished. Canonical building identity does not establish electrical extent. No building capacity scalar, other-tenant demand, utilization or currentness inference.","temporal_role":"undated_reported_critical_it_capacity","as_of":null,"as_of_basis":"No explicit fact-effective or publication date. Retrieval, copyright and edition dates are not substituted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"source_reviewed_pending_registration","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Whole physical-host electrical boundary remains unknown. No whole-host scalar is selected.","Typed operator/suite IT or utility context only. Never included in physical-building totals."],"catalog_holds":{},"sources":[{"url":"https://dartpoints.com/locations/btr01-baton-rouge-la/","title":"BTR01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-18T08:46:35.306959+00:00","sha256":"1536494782a0e5fc7aa6e5e216dc993d1becf68319d7a5b8810354a53f479ab3","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"},{"url":"https://dartpoints.com/data-centers/louisiana-data-center/","title":"BTR01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-18T11:09:08.599617+00:00","sha256":"22274536b0b5a1bb2df02185417f2f52aef7d14e2cc181471997464fab9cec57","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"native_address":"7127 Florida Blvd, Baton Rouge, LA 70806, United States","unit_count":null,"aggregate_value":null,"whole_building_exclusive_occupancy":null,"nonadditive_group":"power-primary04::dc-9c7cf487e920e58b:operator_it_context","source_scope_review":{"review_id":"power-primary04-parent-source-review","sha256":"1cafb6097eb29597b005ca93201c400e77f21b215c9aa1ba418eb9ef0d032463","reviewed_at":"2026-09-18T11:38:16.975129+00:00","reviewer":null,"independent_audit":false}},{"id":"power-primary04::dc-e091407a11fb6642:operator_it_context","subject_id":"dc-e091407a11fb6642","entity_name":"DartPoints Cincinnati","operator_code":"CVG01","reported_value":180,"reported_unit":"kW","kind":"it_critical","scope":"tenant_suite","electrical_extent":"named_operator_IT_boundary_whole_physical_host_unknown","comparison":"equal","upper_value":null,"qualifier":"Native named operator Critical IT Load only. Explicit suite/unit where reported. Whole physical-host IT total is unestablished. Canonical building identity does not establish electrical extent. No building capacity scalar, other-tenant demand, utilization or currentness inference.","temporal_role":"undated_reported_critical_it_capacity","as_of":null,"as_of_basis":"No explicit fact-effective or publication date. Retrieval, copyright and edition dates are not substituted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"source_reviewed_pending_registration","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Whole physical-host electrical boundary remains unknown. No whole-host scalar is selected.","Typed operator/suite IT or utility context only. Never included in physical-building totals."],"catalog_holds":{},"sources":[{"url":"https://dartpoints.com/locations/cvg01-cincinniati-oh/","title":"CVG01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-18T08:46:37.504782+00:00","sha256":"14d518b90f28b7f855108849597a3e3e9ca4d756ccbcfd22d1a0f2c84b0bf74c","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"},{"url":"https://dartpoints.com/data-centers/ohio-data-center/","title":"CVG01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-18T11:09:08.597335+00:00","sha256":"84f800c90406fc7acca8c523f4ad0263f697e7729bd72eadd8f0add22dfb63e5","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"native_address":"302 W 3rd St UNIT 400, Cincinnati, OH 45202, United States","unit_count":null,"aggregate_value":null,"whole_building_exclusive_occupancy":null,"nonadditive_group":"power-primary04::dc-e091407a11fb6642:operator_it_context","source_scope_review":{"review_id":"power-primary04-parent-source-review","sha256":"1cafb6097eb29597b005ca93201c400e77f21b215c9aa1ba418eb9ef0d032463","reviewed_at":"2026-09-18T11:38:16.975129+00:00","reviewer":null,"independent_audit":false}},{"id":"power-primary04::dc-4fea269fe51a1f8f:operator_it_context","subject_id":"dc-4fea269fe51a1f8f","entity_name":"DartPoints Columbia","operator_code":"CAE01","reported_value":110,"reported_unit":"kW","kind":"it_critical","scope":"tenant_suite","electrical_extent":"named_operator_IT_boundary_whole_physical_host_unknown","comparison":"equal","upper_value":null,"qualifier":"Native named operator Critical IT Load only. Explicit suite/unit where reported. Whole physical-host IT total is unestablished. Canonical building identity does not establish electrical extent. No building capacity scalar, other-tenant demand, utilization or currentness inference.","temporal_role":"undated_reported_critical_it_capacity","as_of":null,"as_of_basis":"No explicit fact-effective or publication date. Retrieval, copyright and edition dates are not substituted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"source_reviewed_pending_registration","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Whole physical-host electrical boundary remains unknown. No whole-host scalar is selected.","Typed operator/suite IT or utility context only. Never included in physical-building totals."],"catalog_holds":{},"sources":[{"url":"https://dartpoints.com/locations/cae01-columbia-sc/","title":"CAE01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-18T08:46:36.195379+00:00","sha256":"7356dc5a4bec96535b1ba6a029c6ced2bcfdaa1c9807da742ce2abda06bd29a1","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"},{"url":"https://dartpoints.com/data-centers/south-carolina-data-center/","title":"CAE01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T08:44:12.594698+00:00","sha256":"ee6ec484ac9eb5159e24fe21b369287fe8ad2679d06a8a9d0da35b566cf2acdd","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"native_address":"1000 Catawba St ste 180, Columbia, SC 29201, United States","unit_count":null,"aggregate_value":null,"whole_building_exclusive_occupancy":null,"nonadditive_group":"power-primary04::dc-4fea269fe51a1f8f:operator_it_context","source_scope_review":{"review_id":"power-primary04-parent-source-review","sha256":"1cafb6097eb29597b005ca93201c400e77f21b215c9aa1ba418eb9ef0d032463","reviewed_at":"2026-09-18T11:38:16.975129+00:00","reviewer":null,"independent_audit":false}},{"id":"power-primary04::dc-c17916a31265ad55:operator_it_context","subject_id":"dc-c17916a31265ad55","entity_name":"DartPoints Greenville","operator_code":"GSP01","reported_value":190,"reported_unit":"kW","kind":"it_critical","scope":"tenant_suite","electrical_extent":"named_operator_IT_boundary_whole_physical_host_unknown","comparison":"equal","upper_value":null,"qualifier":"Native named operator Critical IT Load only. Explicit suite/unit where reported. Whole physical-host IT total is unestablished. Canonical building identity does not establish electrical extent. No building capacity scalar, other-tenant demand, utilization or currentness inference.","temporal_role":"undated_reported_critical_it_capacity","as_of":null,"as_of_basis":"No explicit fact-effective or publication date. Retrieval, copyright and edition dates are not substituted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"source_reviewed_pending_registration","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Whole physical-host electrical boundary remains unknown. No whole-host scalar is selected.","Typed operator/suite IT or utility context only. Never included in physical-building totals."],"catalog_holds":{},"sources":[{"url":"https://dartpoints.com/locations/gsp01-greenville-sc/","title":"GSP01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-18T08:46:37.949096+00:00","sha256":"d248367e09c4cbeb9fe1ec85493dd8f214577882fd9bdb0ca1c11eb2cfdae06f","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"},{"url":"https://dartpoints.com/data-centers/south-carolina-data-center/","title":"GSP01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T08:44:12.594698+00:00","sha256":"ee6ec484ac9eb5159e24fe21b369287fe8ad2679d06a8a9d0da35b566cf2acdd","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"native_address":"78 Global Dr # 100, Greenville, SC 29607, United States","unit_count":null,"aggregate_value":null,"whole_building_exclusive_occupancy":null,"nonadditive_group":"power-primary04::dc-c17916a31265ad55:operator_it_context","source_scope_review":{"review_id":"power-primary04-parent-source-review","sha256":"1cafb6097eb29597b005ca93201c400e77f21b215c9aa1ba418eb9ef0d032463","reviewed_at":"2026-09-18T11:38:16.975129+00:00","reviewer":null,"independent_audit":false}},{"id":"power-primary04::dc-3f232dfbc0bc6b4c:operator_it_context","subject_id":"dc-3f232dfbc0bc6b4c","entity_name":"DartPoints Shreveport","operator_code":"SHV01","reported_value":215,"reported_unit":"kW","kind":"it_critical","scope":"operator_facility","electrical_extent":"named_operator_IT_boundary_whole_physical_host_unknown","comparison":"equal","upper_value":null,"qualifier":"Native named operator Critical IT Load only. Explicit suite/unit where reported. Whole physical-host IT total is unestablished. Canonical building identity does not establish electrical extent. No building capacity scalar, other-tenant demand, utilization or currentness inference.","temporal_role":"undated_reported_critical_it_capacity","as_of":null,"as_of_basis":"No explicit fact-effective or publication date. Retrieval, copyright and edition dates are not substituted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"source_reviewed_pending_registration","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Whole physical-host electrical boundary remains unknown. No whole-host scalar is selected.","Typed operator/suite IT or utility context only. Never included in physical-building totals."],"catalog_holds":{},"sources":[{"url":"https://dartpoints.com/locations/shv01-shreveport-la/","title":"SHV01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-18T08:46:38.383059+00:00","sha256":"7716751361e2376c6e4ecb23562240f57f5690fbfaeee8bafdd51a1534b2db4e","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"},{"url":"https://dartpoints.com/data-centers/louisiana-data-center/","title":"SHV01 native technical specification","pdf_page":null,"published":null,"retrieved_at":"2026-09-18T11:09:08.599617+00:00","sha256":"22274536b0b5a1bb2df02185417f2f52aef7d14e2cc181471997464fab9cec57","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"native_address":"601 Milam St, Shreveport, LA 71101, United States","unit_count":null,"aggregate_value":null,"whole_building_exclusive_occupancy":null,"nonadditive_group":"power-primary04::dc-3f232dfbc0bc6b4c:operator_it_context","source_scope_review":{"review_id":"power-primary04-parent-source-review","sha256":"1cafb6097eb29597b005ca93201c400e77f21b215c9aa1ba418eb9ef0d032463","reviewed_at":"2026-09-18T11:38:16.975129+00:00","reviewer":null,"independent_audit":false}},{"id":"nyiso-queue:1726","entity_name":"Data & Technology Campus","operator_code":"1726","reported_value":300,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"12-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Erie","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":38,"quantity_cell":"E38"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1726:summer","entity_name":"Data & Technology Campus","operator_code":"1726","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1726:winter","entity_name":"Data & Technology Campus","operator_code":"1726","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"isone:celt2026:nema:reported_load_nameplate_mw:reported_pre_derating_load_nameplate","entity_name":"Data Center","operator_code":null,"reported_value":200,"reported_unit":"MW","kind":"reported_load_nameplate_mw","scope":"forecast_project_within_load_zone","qualifier":"Reported Nameplate MW before forecast derating. This is load nameplate, not generator nameplate.","quantity_role":"reported_pre_derating_load_nameplate","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2026-03-27","as_of_basis":"Printed document date or latest plan revision; not HTTP upload date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"formal study agreement; none under construction; excluded from winter2026/27 and summers2026/2027","proposed_date_native":"thru 2027","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"load_zone_not_building","planning_area":null,"point_of_interconnection":null,"grid_region":"ISO-NE"},"unresolved_conflicts":["No customer or street address. Not a delivered or metered load.","The hypothetical 500 MW calculation elsewhere in the deck is excluded.","The table timeline does not establish actual commissioning."],"sources":[{"url":"https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf","title":"www.iso-ne.com","pdf_page":14,"published":"2026-03-27","retrieved_at":"2026-09-17T02:42:33.882310+00:00","sha256":"1e6957c4d60d705d5e9c21671c18786072eafb325846489386a60dd54ff045cf","source_family":"isone-celt2026","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power03::nfpr03-mdu-leola-esa","subject_id":null,"entity_name":"Data center near Leola, South Dakota","operator_code":null,"reported_value":50,"reported_unit":"MW","kind":"requested_electric_service_agreement","scope":"facility_unresolved","electrical_extent":"unidentified_data_center_request","comparison":"up_to","upper_value":null,"qualifier":"Up to 50 MW requested near Leola. SDPUC ESA approval remained pending an updated conditional-use permit. August 5, 2025 concerns local siting requirements, not ESA approval.","temporal_role":"regulatory_request_pending_approval","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/67716/000006771626000050/mdu-20260331.htm","title":"mdu-q1-2026","pdf_page":null,"published":"2026-05-07","retrieved_at":"2026-09-18T03:52:37.284129+00:00","sha256":"5fa3e9e1bd2ea6518ac86b1b52beaefdad0bf88a2ad9be48dde92a11ae1d3114","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Operating discussion, printed page 35: Leola request","text_lines_1_based":[5105,5105],"text_character_span":[135111,135703],"normalized_text_character_span":[135105,135697]}],"text_sha256":"ef7d141b4673e59c6993e58ccfd6bc5792161e3a54ad5cc723e82632f4134dda","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-05-07","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-05-07","sec_filing_date":"2026-05-07","document_period_end":"2026-03-31","event_dates":[{"date":"2024-08","role":"ESA_approval_request_filed","precision":"month","quantity_effective_date":false},{"date":"2025-08-05","role":"local_siting_requirements_effective","quantity_effective_date":false}],"forecast_target_period":null,"non_additive_group":"mdu-leola-request","identity_state":"unresolved_no_record_association","correction_ids":["C04-mdu-report-event-forecast-date-separation"],"source_observation_id":"nfpr03-mdu-leola-esa","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"power2-7130f9656b50ef2149b0","entity_name":"DataBank ACT1","operator_code":null,"reported_value":0.8,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639290Q6IqaJFr/ACT1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:38.937816+00:00","sha256":"a5fb9f7a4a4c2813e79a39a68bf069322e6e765a408ff79a1d2194e5f2d523dd","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-969cd46b76de000df708","entity_name":"DataBank ATL1","operator_code":null,"reported_value":7.1,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639317hPICWIr8/ATL1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:07.001603+00:00","sha256":"6d05442e5a891ba685dcbca9cf0644594f274ae4ee90f7fc776270f1b0d0440c","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-91ced41522354f4ff9c0","entity_name":"DataBank ATL2","operator_code":null,"reported_value":4.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639331J275JOQz/ATL2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:05.416049+00:00","sha256":"7b5b8794214725da6602ed702b0994e523962763f3c642c43568995f8ed4e7af","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-6cdd82a477be7cb1b063","entity_name":"DataBank ATL3","operator_code":null,"reported_value":6.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/17866393639wkfviBo/ATL3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:06.073502+00:00","sha256":"425c67f9ef37bc3e489cf5ea4273a3108c73a7d3765bcd923d9a26b21b52fb1a","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-03aabf4ce4d25469f9fb","entity_name":"DataBank ATL4","operator_code":null,"reported_value":40.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639381ABPzo1sZ/ATL4_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:06.570746+00:00","sha256":"5554100216814729059b366bf6ac963d39a0d9b6b7f3559ec49d8aad7b380518","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-ce32b6efdb61347d7b7f","entity_name":"DataBank ATL5","operator_code":null,"reported_value":48.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639550rFIQcE6m/ATL5_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:07.491740+00:00","sha256":"d1412c3df43f72340bd42f688a45c8d6979c49b8fa069e0764507acb11dbe94a","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-1fe3503be8fde337b2aa","entity_name":"DataBank ATL6","operator_code":null,"reported_value":72.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639583JlnGbZVY/ATL6_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:08.023050+00:00","sha256":"3d768b447eb2eacbff2367cd1bb93b64cdf48729113411a02dc7a93da6e7e440","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-087c48eb80e0c02996f2","entity_name":"DataBank AUS1","operator_code":null,"reported_value":0.405,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639603VI4EnjmA/AUS1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:08.525749+00:00","sha256":"97b8bed348abce57d081899bad756711928e898562c4a9a4344c0f2f999ac135","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-93a299404e3b7caaf4d5","entity_name":"DataBank BOS1","operator_code":null,"reported_value":0.5,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639641RuAZHPZK/BOS1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:09.032163+00:00","sha256":"2ee82eaaafa638a3257270a4e822c57f8cdd3818951ea5e5d53cdd478278bd4c","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-d7fb256039a9f17fbea7","entity_name":"DataBank CLE1","operator_code":null,"reported_value":0.4,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639670LBVc9HFL/CLE1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:11.346454+00:00","sha256":"b74244ed8141f73279c3c356c3a0cb46ff010ea7a3913e45c977350ddcda3199","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-22bdb42cd4b6ede7f302","entity_name":"DataBank DEN1","operator_code":null,"reported_value":2.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639699zevrSfsK/DEN1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:18.504481+00:00","sha256":"c12544905aaeb6ee0991d1556a66dd4e65708388646ca5d51853fedc92d4ac29","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-00ee4839c054ce58ccf1","entity_name":"DataBank DEN2","operator_code":null,"reported_value":4.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639721Lf2ibTeR/DEN2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:17.645757+00:00","sha256":"ebd9bc9119e2917c2e615bf3212b04513b05e4200e69655742d6b9d5e54d66eb","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-3ea63f8e97feebc95198","entity_name":"DataBank DEN3","operator_code":null,"reported_value":2.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639739yEcbHjDP/DEN3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:17.160798+00:00","sha256":"548946152a1368ac41cbf103b9b30a84d4e53d586c2fd3c0b0b8badb4482cc58","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-3b76ccf2308f4a9adddc","entity_name":"DataBank DEN4","operator_code":null,"reported_value":0.5,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639761286Dm2Zf/DEN4_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:19.036909+00:00","sha256":"02cdf374d0931ed6ef022fba01c75f9b386ad43c21f4acda55da713bd5519118","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-7f5f68486e49b229377d","entity_name":"DataBank DEN5","operator_code":null,"reported_value":16.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/17866397812ZYopKer/DEN5_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:17.990092+00:00","sha256":"a55c6485fd922e222965761c910313ffc0f9269f9fa746ccf020c97678d1cc2d","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-c45c21cd1a6c21b08e09","entity_name":"DataBank DFW1","operator_code":null,"reported_value":7.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639881OzzjSFtG/DFW1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:12.943664+00:00","sha256":"2caf60f69fa0a27f649486e5dbb0c774f26b43d21c11d1de3a0f66fb0a891604","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-084751d18fe576cd647e","entity_name":"DataBank DFW10","operator_code":null,"reported_value":60.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Primary address layout requires manual reconciliation."],"sources":[{"url":"https://storage.pardot.com/1103952/1786640013IbNvT3bY/DFW10_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:15.338994+00:00","sha256":"6dc726552d38b24589e02ca6b02bc6ec06a4dc16eb4d971e46dd4f493b710a06","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-f0a47a7d425474e2df47","entity_name":"DataBank DFW2","operator_code":null,"reported_value":4.3,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639894F5OQ7z15/DFW2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:16.414654+00:00","sha256":"babd04a107a7c5dfe795e31c843fb8a1e1b3ba5e3bbd58c3e3be4ccf4c971ea8","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-1a14bc33f41e4ed463d1","entity_name":"DataBank DFW3","operator_code":null,"reported_value":12.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/17866399109yfyzAbG/DFW3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:14.964108+00:00","sha256":"f8b03a1b7a819481518b1f058c9209f2c48aa56229d810a7d96f0f6ff74d06b0","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-51fac1e2adaea5365ea6","entity_name":"DataBank DFW4","operator_code":null,"reported_value":4.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639924mRwAVI7l/DFW4_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:11.873117+00:00","sha256":"17cd7d937380b867f693c9953e3de35c736f97de9b97ea67389f1f5b91dd8a29","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-0903cdacc3ccdb299102","entity_name":"DataBank DFW5","operator_code":null,"reported_value":1.3,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639940NZpoDFct/DFW5_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:12.398001+00:00","sha256":"72984ebfe7738d5798ff3b46da083b3b3cbc3868059257cddc247bf151b9efa4","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-5d591bb7c4c547bf95c2","entity_name":"DataBank DFW6","operator_code":null,"reported_value":0.675,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639953BWHLUKHQ/DFW6_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:13.772692+00:00","sha256":"035958f11613219cbaeadd9d8189a0161201edf4d86cbfb1c00f62f425a0fbcb","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-849899fa5a710d79dcbf","entity_name":"DataBank DFW7","operator_code":null,"reported_value":0.94,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639967HynpevTO/DFW7_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:13.328389+00:00","sha256":"0708399b6659d33dce8cdf19ebf46be25fb281514b6565c9e3224c8d25f497b7","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-1b6045e9a4b76c3b6196","entity_name":"DataBank DFW8","operator_code":null,"reported_value":40.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786639979zevLcelm/DFW8_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:14.505318+00:00","sha256":"cd7e0c28722a13bfee453988b449880e0208f57cc8218236ba0e4410ab03965f","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-fa1d19ab574a5b5477d7","entity_name":"DataBank DFW9","operator_code":null,"reported_value":60.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Primary address layout requires manual reconciliation."],"sources":[{"url":"https://storage.pardot.com/1103952/1786639992ogZPapMz/DFW9_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:15.862618+00:00","sha256":"1c1afad39f51862d408d6002f0738a1cf5e1f53834dd6a8286e73c4a39ac9fc7","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-a51028adf70847791835","entity_name":"DataBank EWR1","operator_code":null,"reported_value":1.7,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/178664004825vesu5f/EWR1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:27.941615+00:00","sha256":"085cf8bf4fbcaaab7d326830ce0c30a3e0e9e0f710cf30b709c64fdda49b50fd","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-03f090b441193a2fc39f","entity_name":"DataBank EWR2","operator_code":null,"reported_value":3.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640061ztoysmUy/EWR2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:28.461880+00:00","sha256":"b9266e7e602ce993d3d156aa5ee7ad9fdd108c0bde38749e9b7fb9f59c3e913c","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::ewr2","entity_name":"DataBank EWR2","operator_code":null,"reported_value":3,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Explicit critical IT power in dated operator tour description; not diesel generator capacity.","comparison":null,"as_of":"2024-05-08","as_of_basis":"Explicit document reporting date","period_start":null,"period_end":null,"temporal_role":"dated_source_power_observation","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.databank.com/resources/videos/take-the-virtual-tour-of-ewr2/","title":"www.databank.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:28:20.347920+00:00","sha256":"ed34637727371c5514a6d6eb490431cfbb6899dccc695ea07687a924ef3b2a02","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.databank.com/data-centers/new-jersey/","title":"www.databank.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:29:11.732161+00:00","sha256":"e6301aeec39cd6aa7e7b0696fb2f9b80fd36a6bb134b86cae9dc78cee9ded708","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-007584a3d82774530ff9","entity_name":"DataBank HOU1","operator_code":null,"reported_value":15.6,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640072vJDjrjAN/HOU1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:20.606860+00:00","sha256":"9546742b338960d1a61751e9cfdd7cfe747151d2bbdd2130e1f7040849ee172d","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-3f0ffb6fa7562e23cb61","entity_name":"DataBank HOU2","operator_code":null,"reported_value":9.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640084YGti9Zf0/HOU2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:21.101220+00:00","sha256":"387000d4590255a84d123d7511ae7330fb1484d2f95b22143db54edde7d565af","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-697e7812c17ad39544fd","entity_name":"DataBank HOU3","operator_code":null,"reported_value":6.5,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Primary address layout requires manual reconciliation."],"sources":[{"url":"https://storage.pardot.com/1103952/1786640095b5UE3ZGb/HOU3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:20.080841+00:00","sha256":"270c1f8031b6d82bd628a831041c3e892564516ea1afdb08a2f11277cec4ced9","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-dca3de644f3d84a188d8","entity_name":"DataBank HOU5","operator_code":null,"reported_value":5.25,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640107a5M3ABPq/HOU5_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:19.592826+00:00","sha256":"7b96aea24f254a3ddd6fb5ca5275ea1418802d1431722a7d7827c4c307337857","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-322679328804f65e86df","entity_name":"DataBank IAD1","operator_code":null,"reported_value":9.9,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640129B2UD4ZzA/IAD1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:30.440376+00:00","sha256":"b1bc1f184f962e38b40d4a2677f567c67b5cd4f972d66e162aaee7305db706ef","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-6eae4ca4ea722e04a79e","entity_name":"DataBank IAD2","operator_code":null,"reported_value":3.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/17866401424gdZeJHO/IAD2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:32.119278+00:00","sha256":"3680afca63cf3809124500e19db848d6b63314aa141a3bc9d3c3544d142f1579","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-1b4ada4ffd1ae685e30a","entity_name":"DataBank IAD3","operator_code":null,"reported_value":40.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640158saaGOyma/IAD3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:41:19.232622+00:00","sha256":"f9e5e481c8564cc209ab6383c4dbc05983e881242f8711b1363ddb092ed8220b","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-71be3f43b54c8a7012ab","entity_name":"DataBank IAD4","operator_code":null,"reported_value":20.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640183HK0SVZZs/IAD4_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:30.828541+00:00","sha256":"e2cd97623decb3c43a36d3d20b750501d577b0b4c6aacf87446a76f8f6f9779e","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-abec0055e0fc76894b45","entity_name":"DataBank IAD5","operator_code":null,"reported_value":72.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640195u0YpqD12/IAD5_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:31.262023+00:00","sha256":"5c5b43d0f79ec3391a2caf69acf98b51737ccab994fc4bda1969ea7ede07327f","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-c9f2a531485b874abac0","entity_name":"DataBank IAD6","operator_code":null,"reported_value":120.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640208WYoK8cFY/IAD6_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:31.679480+00:00","sha256":"c2ce4a598ad208d240d761f0296c32ae61f7ea57618803d09e633f3727af0fcb","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-abd01152efc674a36d40","entity_name":"DataBank IND1","operator_code":null,"reported_value":2.1,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640223v0EcB1Q0/IND1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:22.104128+00:00","sha256":"f2701b7b68d4c86441842bb235b2007b9c9575677572077ba185399886d259e2","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-8dc0d6fd2c70981a6345","entity_name":"DataBank IND2","operator_code":null,"reported_value":3.75,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640240n8ZHZ1ku/IND2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:21.651201+00:00","sha256":"3ddd795c131d6e1bb0d3b0031b1ab322d56a841815ac965def41e2a4f5d4f041","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-57d0f9c679b1c25d6cf4","entity_name":"DataBank LAS1","operator_code":null,"reported_value":3.35,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["The undated LAS1 datasheet reports 3.35 MW of critical IT load. The April 1, 2024 operator announcement reports 3.55 MW after an expansion at the same address. The source dates do not establish whether capacity changed, the definitions differ or a number is erroneous. Both claims remain attributed; no single building IT capacity is selected.","Compare the dated operator source: https://www.databank.com/resources/press-releases/databank-completes-lease-buy-back-for-las1-data-center-in-las-vegas/"],"sources":[{"url":"https://storage.pardot.com/1103952/1786640251ZbNeJHaJ/LAS1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:24.176806+00:00","sha256":"0b1d4b301d04ce598c7ed7d90191cb33fcb1cf1fc7c2b172b3a80e78ed20e7e3","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-a2ea66bd21b57aea50a5","entity_name":"DataBank LAX1","operator_code":null,"reported_value":2.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640278ERHfGGVC/LAX1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:24.551911+00:00","sha256":"bb9eec2778cbf61863b2811ad271478b47670a7847d5814616dc2731070bc530","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-6042d73e0924fa2b7479","entity_name":"DataBank LGA1","operator_code":null,"reported_value":0.74,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640317GvzvVvAT/LGA1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:29.487011+00:00","sha256":"3c698fe12d10209bab7cdec5d353ec88d1aacb72a3073c5bda1264c2fd984258","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-d0d2826470b15bf0d845","entity_name":"DataBank LGA2","operator_code":null,"reported_value":0.68,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640331dIdekNDz/LGA2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:28.988662+00:00","sha256":"fff490c1853cd72647a7953691c832478d1b55e46e90afc0ad7bb29b4955d23c","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-baccf1033efae6294eca","entity_name":"DataBank LGA3","operator_code":null,"reported_value":20.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Primary address layout requires manual reconciliation."],"sources":[{"url":"https://storage.pardot.com/1103952/1786640346A3dYdZbj/LGA3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:29.949618+00:00","sha256":"8ca69817f31073ce8a800c28b5242e83c28a46e07e163ffb3202746016864371","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"databank:lga3:operator_it_load_mw:operator_it_capacity","entity_name":"DataBank LGA3","operator_code":null,"reported_value":20,"reported_unit":"MW","kind":"operator_it_load_mw","scope":"named_facility_not_resolved_to_polygon","qualifier":"Explicit operator Critical IT Load label. Not total facility demand or the NYISO requested service.","quantity_role":"operator_it_capacity","comparison":null,"season":null,"reported_period":null,"temporal_role":"it_context","as_of":null,"as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"undated live operator page at retrieval","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"it_context","is_default_dc_load_evidence":true,"location_context":{"address":"2000 Corporate Dr.","city":"Orangeburg","county":null,"state":"NY","location_precision":"operator_facility_address_shared_by_two_facilities","planning_area":null,"point_of_interconnection":null,"grid_region":"NYISO"},"unresolved_conflicts":["LGA3 and LGA4 have the same address. Phase2 queue identity is not resolved to one code or roof."],"sources":[{"url":"https://www.databank.com/data-centers/new-york-city/orangeburg-campus/lga3/","title":"www.databank.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:42:39.660764+00:00","sha256":"923669f3b06a4ec11fa140b50fbcbc2a65e6dec8d893060f26cc652ba8f905f2","source_family":"databank-lga3","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"databank:lga4:operator_it_load_mw:operator_it_capacity","entity_name":"DataBank LGA4","operator_code":null,"reported_value":10,"reported_unit":"MW","kind":"operator_it_load_mw","scope":"named_facility_not_resolved_to_polygon","qualifier":"Explicit operator Critical IT Load label. Not total facility demand or the NYISO requested service.","quantity_role":"operator_it_capacity","comparison":null,"season":null,"reported_period":null,"temporal_role":"it_context","as_of":null,"as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"undated live operator page at retrieval","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"it_context","is_default_dc_load_evidence":true,"location_context":{"address":"2000 Corporate Dr.","city":"Orangeburg","county":null,"state":"NY","location_precision":"operator_facility_address_shared_by_two_facilities","planning_area":null,"point_of_interconnection":null,"grid_region":"NYISO"},"unresolved_conflicts":["LGA3 and LGA4 have the same address. Phase2 queue identity is not resolved to one code or roof."],"sources":[{"url":"https://www.databank.com/data-centers/new-york-city/orangeburg-campus/lga4/","title":"www.databank.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:42:40.103554+00:00","sha256":"036b94d4aed66da2606e696f2df9f85f04b88def56d4bcdfbf64dd7e2f9d24d8","source_family":"databank-lga4","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-d00c7024347c4b94c5a4","entity_name":"DataBank MCI2","operator_code":null,"reported_value":2.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640467SB7QFVRE/MCI2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:23.363713+00:00","sha256":"4bad376be44cf18fabd1b02f897c8926869a8e334c79745e5587c07ed9ae31ac","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-0682bd5a77e921afc87a","entity_name":"DataBank MCI3","operator_code":null,"reported_value":12.75,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640479RtJoL3V6/MCI3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:23.724709+00:00","sha256":"447f333f731e949dee581c1e1197aa3e7cfbbdc14c68cf4eb68fa69cab7c9c06","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-a2621fee31d5a0a1badf","entity_name":"DataBank MEM1","operator_code":null,"reported_value":0.45,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640495dGlQZQyI/MEM1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:24.953543+00:00","sha256":"b5a139e34fd46b10a6009786d48cf25a15780a3dd52972e9bbf6c50fd9da61f2","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-f72f54cbced201d79d3a","entity_name":"DataBank MIA1","operator_code":null,"reported_value":1.6,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640511gGLZCYjp/MIA1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:25.320680+00:00","sha256":"107cef1bc4ee23bbf614ac787b2842580a25e53de31ae4f01d67be91af21a919","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-d02b309e13babf885347","entity_name":"DataBank MSP1","operator_code":null,"reported_value":1.35,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640535AbLkwihE/MSP1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:27.144153+00:00","sha256":"6caefb3ce04a1c00f2bd4b10dd96b63b59aa36b22cf68fcaf62aff191946dcec","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-f599145fb41a118d62ee","entity_name":"DataBank MSP2","operator_code":null,"reported_value":5.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640554O8ovpS6D/MSP2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:26.746488+00:00","sha256":"13272a961f5a88a455597fc3bd8fb905f48b3e4f51f212ce664fe936104d11a1","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-d50b6702ef45a9ca0cfc","entity_name":"DataBank MSP3","operator_code":null,"reported_value":9.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640569pezZW9Vz/MSP3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:26.090304+00:00","sha256":"61e3ac2ca8ed96193e921a1602cc671cd6a3d130bfd53efa11a859ba78abd446","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-39cf3d11e2e4da58d291","entity_name":"DataBank MSP4","operator_code":null,"reported_value":0.779,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640584nuzUfCIf/MSP4_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:25.750665+00:00","sha256":"ef2d19e2a3c7f972ff108e449010639eeb86315773c42fbbd2067886c5a12b97","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-adbeb050ac5d9fd74410","entity_name":"DataBank ORD1","operator_code":null,"reported_value":1.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640598boRVyuOf/ORD1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:09.513155+00:00","sha256":"cd1a4462c79743409223864286eb84bc2aaf84892ff2df2f1e8a1d653dcdb16c","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-d90d1b46c10ad4dec606","entity_name":"DataBank ORD2","operator_code":null,"reported_value":2.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640612Kkg8hmO6/ORD2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:09.982145+00:00","sha256":"4d64206cfc937a5d5f82b2c6372cac11947ae5aaec19f53ee09e272b109b19c6","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-3408060cd0dd8307258b","entity_name":"DataBank ORD3","operator_code":null,"reported_value":2.7,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640627sVzz5ptt/ORD3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:10.342155+00:00","sha256":"f9cd96b057ef54bc12046d188d2712bc68ed8b5517842c8e3b165d5478f26fd0","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-0a2b18493a1b342910d9","entity_name":"DataBank ORD4","operator_code":null,"reported_value":8.75,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640641VeyuzMlw/ORD4_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:10.834345+00:00","sha256":"209a0d6e8d3cc6cbaf6529f89519e5d78bac706be4265fcf21e24957b2d98c37","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-ec7efc9a9ceddbeed4ac","entity_name":"DataBank PHL1","operator_code":null,"reported_value":0.34,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640654hIH7BS0v/PHL1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:32.583087+00:00","sha256":"2d3912c2d0d4d5b91448bc259381b778814b643d997eda8ddf0a2befa1390918","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-45f8f5ee4f7da6a641dc","entity_name":"DataBank PIT1","operator_code":null,"reported_value":1.9,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640666ywwiNAFn/PIT1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:33.044062+00:00","sha256":"8252f2c56f2073ac6cf9953f256579cdcdf1a557e8e5ecd6ffbad740e7b14495","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-94b6fc0822a104395891","entity_name":"DataBank PIT2","operator_code":null,"reported_value":5.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640682y09L56oY/PIT2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:33.396414+00:00","sha256":"2bf6da0526c3fd001dbaf01aef1d9867f630ea6f6281835947e8fab1276cda71","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-5c5c639700b489dd2fe8","entity_name":"DataBank SAN1","operator_code":null,"reported_value":7.2,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/178664069641NYBPs8/SAN1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:36.714080+00:00","sha256":"12f34d7f28f243f34e51f250bb6a916b6a5c96b1dee10214ccb18aef9118f61e","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-97e0d266e663bcb7a797","entity_name":"DataBank SEA1","operator_code":null,"reported_value":0.21,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640708AEdR1tfr/SEA1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:37.409266+00:00","sha256":"00f642203fa171df4ba2fd9c1335584b265d89b27e8e6fd259cd3063da5079b8","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-7763832f2e170921ef48","entity_name":"DataBank SEA2","operator_code":null,"reported_value":3.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640722Di2baA3l/SEA2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:37.891193+00:00","sha256":"2f4ff51932d51292d8c954cd35937eae6e38a993bd12d17f32e48714cba3a005","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-09c3331c2b256398f664","entity_name":"DataBank SFO1","operator_code":null,"reported_value":3.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640733T9cQZYhW/SFO1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:38.400190+00:00","sha256":"42c6e250c33546713f16e9ca9189b2cbf1bb19a264283887418a2b690862f496","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-cf99f9a93b399178e710","entity_name":"DataBank SLC1","operator_code":null,"reported_value":0.5,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/178664074406H0JHGz/SLC1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:33.875565+00:00","sha256":"13ac09d38b97fe78838f42feb2875afd1bf7d7acd9c2c8c08bdef716a733e50e","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-5fdbce30d5f70e148a58","entity_name":"DataBank SLC2","operator_code":null,"reported_value":3.25,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640757afwTcacG/SLC2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:35.786309+00:00","sha256":"4c8ba4622e7df0f12a676f9f9a231c5c7dde1f828af57bc0f242f771f22e767a","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-1c0761b9c496ec30c4ad","entity_name":"DataBank SLC3","operator_code":null,"reported_value":7.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640770v6MV7p0P/SLC3_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:35.239963+00:00","sha256":"68b0935f901ff5cea41ffebfc45f44a54dd2d04e6064da95c967476d579150a4","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-db84bf4eaa8332d37d61","entity_name":"DataBank SLC4","operator_code":null,"reported_value":3.67,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640782bHAtPtEe/SLC4_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:34.292283+00:00","sha256":"3aff27303507c8d7522fa4bce5255dfada4072bfac4420b2cfcfec7c284b73d8","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-2706028d50a174a8ee89","entity_name":"DataBank SLC5","operator_code":null,"reported_value":10.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Cover photo shows 14870 while the text address is 14850 S Pony Express Rd. Parent physical identity is accepted separately; photo is not new identity proof."],"sources":[{"url":"https://storage.pardot.com/1103952/1786640794GYOlikEa/SLC5_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:34.744348+00:00","sha256":"a37f0b025788161294e1a83c19e3374bab3aeb57a0a36bef0d6ba2c9c93cb8fc","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-f51886944958c801776b","entity_name":"DataBank SLC6","operator_code":null,"reported_value":22.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640806ppwwSzqz/SLC6_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:36.269383+00:00","sha256":"541ede74a02c530d60c65ffa7432617b0dfc1b927ef84395850523c91cc1b1c1","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-b035949ed8efeb8a3194","entity_name":"DataBank SNA1","operator_code":null,"reported_value":2.64,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640822UPZcSvr2/SNA1_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:22.559831+00:00","sha256":"3315573bf13d6a2ef4238fa0b46302a222ba5f620c15a7ecd3c6abd5543bbf5c","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-5b36580729959d9c7768","entity_name":"DataBank SNA2","operator_code":null,"reported_value":8.0,"reported_unit":"MW","kind":"it_critical","scope":"operator_facility","qualifier":"Explicit Critical IT Load badge for this operator facility. Tenant, shared-roof and campus boundary not inferred from code/address.","temporal_role":"undated_report","as_of":null,"as_of_basis":"Undated datasheet. Cover quarter/version label is not an exact fact date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://storage.pardot.com/1103952/1786640837GT0VWhTa/SNA2_datasheet.pdf","title":"storage.pardot.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-16T22:42:22.930892+00:00","sha256":"5399742cbc9831e689ac262bcf34e7a3276aa673f71186ee5ea05fc0ce07081c","source_family":"operator_it_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-nypa-row-196","subject_id":null,"entity_name":"Databank Holdings, Ltd. / Orangeburg, NY","operator_code":null,"reported_value":1000.0,"reported_unit":"kW","kind":"public_power_allocation","scope":"customer","electrical_extent":"award_program_only","comparison":"exact","upper_value":null,"qualifier":"Recharge New York allocation, not utility service limit or facility design. Name-and-city discovery association only. Two Orangeburg allocation rows remain separate. No building match or sum assumed.","temporal_role":"allocation_as_reported","as_of":"2026-07-01","as_of_basis":"Row data_valid_as_of 7/1/2026.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://data.ny.gov/resource/mkqe-r4dx.json?$limit=50000","title":"nypa_dataset_rows","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:57:34.294195+00:00","sha256":"d22fdb16f42f9987df5576181905ce9d4153541952c2fc100a905229f6da5411","source_family":"public_registry","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:authorized_accelerated_service_mva:walsh:2027","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":24,"reported_unit":"MVA","kind":"authorized_accelerated_service_mva","scope":"customer_service_property","qualifier":"Council report proposed acceleration of the same 24 MVA service ceiling; no increment.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2027","temporal_role":"load_evidence","as_of":"2025-02-11","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_negotiation_and_execution; executed_amendment_not_captured","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Report references Exhibit E while the attached original table is in Exhibit D. Legal entity street number is not accepted as a service address."],"sources":[{"url":"https://santaclara.legistar.com/ViewReport.ashx?M=R&N=TextL5&GID=693&ID=24505&GUID=LATEST&Title=Legislation+Text","title":"santaclara.legistar.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T03:21:37.729756+00:00","sha256":"c65def41247a5d4a86f8ddf7b8879a52f03d8e8c70cbd7f1cfa26fe7a97b1f56","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2023","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":5.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2023","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":29,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2024","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":7.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2024","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":29,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2025","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":9.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2025","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":29,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2026","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":11.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2026","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":30,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2027","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":13.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2027","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":30,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2028","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":16.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2028","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":30,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2029","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":18.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2029","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":30,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2030","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":20.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2030","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":30,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2031","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":22.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2031","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":30,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:walsh:2032 through 2033","entity_name":"Digital Realty / 651 Walsh Partners Laurelwood property","operator_code":null,"reported_value":24.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2032 through 2033","temporal_role":"load_evidence","as_of":"2023-01-06","as_of_basis":"Last city signature page 19; attached to February 11, 2025 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_parcel","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Later council report authorizes acceleration to 24 MVA in 2027. No executed amendment table captured."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13739880&GUID=26991753-2763-426B-B991-3DC9EF783DCD","title":"santaclara.legistar.com","pdf_page":30,"published":null,"retrieved_at":"2026-09-17T03:21:40.013414+00:00","sha256":"c478aa45286198adbe6b654e291cdeaa2826d39ade39d17aa73a4d2c1dcc01ba","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::or1-backup-main-2019","entity_name":"Digital Realty OR-1 and Beaver Ventures air source","operator_code":null,"reported_value":3,"reported_unit":"MW","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":8,"qualifier":"Eight 2019 replacement Cummins units, table row 2. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":"2023-05-01","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","OEG describes one building with eight 10 MW data-hall feeds and total 80 MW after all halls are built out. The page does not define IT versus gross input or identify the street address. DEQ OR1 source is 6675 NE 62nd, matching PDX11 address, while PDX12 uses 5870 NE Schaaf. The contractor code alone does not adjudicate which physical building. The 2023 DEQ table crosses out removed engines and marks future equipment; do not count both replaced and replacement units."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0186-ST-01_RR_2023.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T05:03:30.794708+00:00","sha256":"f2f682d770ce1ea460bd1ec11bf64b2a21aedc3e7cdb6ffd592c7341402ace52","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."},{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0186-ST-01_RR_2023.PDF","title":"deqonline.deq.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T05:03:30.794708+00:00","sha256":"f2f682d770ce1ea460bd1ec11bf64b2a21aedc3e7cdb6ffd592c7341402ace52","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::or1-backup-main-future","entity_name":"Digital Realty OR-1 and Beaver Ventures air source","operator_code":null,"reported_value":3,"reported_unit":"MW","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":40,"qualifier":"Forty future Cummins units with QSK95-G12 and filter. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":"2023-05-01","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","OEG describes one building with eight 10 MW data-hall feeds and total 80 MW after all halls are built out. The page does not define IT versus gross input or identify the street address. DEQ OR1 source is 6675 NE 62nd, matching PDX11 address, while PDX12 uses 5870 NE Schaaf. The contractor code alone does not adjudicate which physical building. The 2023 DEQ table crosses out removed engines and marks future equipment; do not count both replaced and replacement units."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0186-ST-01_RR_2023.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T05:03:30.794708+00:00","sha256":"f2f682d770ce1ea460bd1ec11bf64b2a21aedc3e7cdb6ffd592c7341402ace52","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."},{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0186-ST-01_RR_2023.PDF","title":"deqonline.deq.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T05:03:30.794708+00:00","sha256":"f2f682d770ce1ea460bd1ec11bf64b2a21aedc3e7cdb6ffd592c7341402ace52","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-qts-historical","subject_id":null,"entity_name":"DuPont Fabros NJ1 / QTS Piscataway historical original facility","operator_code":null,"reported_value":36.4,"reported_unit":"MW","kind":"it_critical_design","scope":"facility_unresolved","electrical_extent":"original_extent_unresolved","comparison":"exact","upper_value":null,"qualifier":"Current operator describes an additional two-story expansion. Original 36.4 and current 65+ differ in date and physical scope; unresolved extent prevents selecting a canonical IT value.","temporal_role":"historical_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["qts_original_vs_expanded_electrical_extent","Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://forestnj.com/case-studies/technology/dupont-fabros","title":"dupont_nj1_engineering","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:55:52.367586+00:00","sha256":"06f150b4ca030495e826f89828080117b64de317187f6dda8885f05705879701","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-edged-campus","subject_id":null,"entity_name":"Edged Chicago campus","operator_code":null,"reported_value":96,"reported_unit":"MW","kind":"it_critical_design","scope":"campus","electrical_extent":"campus","comparison":"exact","upper_value":null,"qualifier":"Campus critical capacity including multiple future facilities.","temporal_role":"reported_capacity","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://www.edged.us/chicago","title":"edged_chicago","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:05:45.648235+00:00","sha256":"b2f8c27861ba817b7d25407b4ede88220d29fcdaa1caf876a716cc03f13e607b","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-edged-ord01-1","subject_id":"dc-dfe99a66839f5412","entity_name":"Edged ORD01-1, 2835 Bilter Road, Aurora","operator_code":null,"reported_value":24,"reported_unit":"MW","kind":"critical_power_unspecified","scope":"building","electrical_extent":"whole_named_building","comparison":"approximate","upper_value":null,"qualifier":"The source reports 24 MW of critical capacity for ORD01-1. It does not explicitly define this as IT load. The technical sheet is undated; retrieval and filename dates are not effective dates. The value remains research context and does not populate an IT or facility power field.","temporal_role":"reported_capacity","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Bare critical capacity is not explicitly defined as IT load."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://cdn.prod.website-files.com/62f4046c4606ae485a2c58ec/68fb9d0876ec8fe228472aed_ORD01-1_Spec%20Sheet_250828_Digital.pdf","title":"edged_ord01_1","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T15:06:50.285432+00:00","sha256":"e32f9de1db62b8fa52b413a9c262c98b59bf3c533336b2e5811107e201ea41fa","source_family":"operator_document","reuse_note":"company-public"},{"url":"https://cdn.prod.website-files.com/62f4046c4606ae485a2c58ec/68fb9d0876ec8fe228472aed_ORD01-1_Spec%20Sheet_250828_Digital.pdf","title":"edged_ord01_1","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T15:06:50.285432+00:00","sha256":"e32f9de1db62b8fa52b413a9c262c98b59bf3c533336b2e5811107e201ea41fa","source_family":"operator_document","reuse_note":"company-public"},{"url":"https://www.edged.us/chicago","title":"edged_chicago","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:05:45.648235+00:00","sha256":"b2f8c27861ba817b7d25407b4ede88220d29fcdaa1caf876a716cc03f13e607b","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"source_extraction_kind":"it_critical_design"},{"id":"national-power01::nfpr01-edged-ord01-2","subject_id":null,"entity_name":"Edged ORD01-2/3 future facilities","operator_code":null,"reported_value":72,"reported_unit":"MW","kind":"it_critical_design","scope":"building_group","electrical_extent":"one_or_two_buildings","comparison":"approximate","upper_value":null,"qualifier":"The design can be one or two buildings. Neither divide it nor apply it to ORD01-1.","temporal_role":"future_design","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://cdn.prod.website-files.com/62f4046c4606ae485a2c58ec/68fb9d202d006d751aec0054_ORD01-2_Spec%20Sheet_250828_Digital.pdf","title":"edged_ord01_2","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T15:06:50.285737+00:00","sha256":"af2b2c58a0c5eff0ed334dd28bf7135c0e016917b8d9fda13f3fecea3be3472b","source_family":"operator_document","reuse_note":"company-public"},{"url":"https://cdn.prod.website-files.com/62f4046c4606ae485a2c58ec/68fb9d202d006d751aec0054_ORD01-2_Spec%20Sheet_250828_Digital.pdf","title":"edged_ord01_2","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T15:06:50.285737+00:00","sha256":"af2b2c58a0c5eff0ed334dd28bf7135c0e016917b8d9fda13f3fecea3be3472b","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2025-007:1","entity_name":"Eldean Piqua AES Ohio","operator_code":"Dayton-2025-007","reported_value":45,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2027-12","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 440 MW December 2029 and 600 MW December 2030 struck through. Red entries are replacements/additions. Total requested new load, not increments to sum.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2025-007:2","entity_name":"Eldean Piqua AES Ohio","operator_code":"Dayton-2025-007","reported_value":205,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2028-12","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 440 MW December 2029 and 600 MW December 2030 struck through. Red entries are replacements/additions. Total requested new load, not increments to sum.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2025-007:3","entity_name":"Eldean Piqua AES Ohio","operator_code":"Dayton-2025-007","reported_value":365,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2029-05","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 440 MW December 2029 and 600 MW December 2030 struck through. Red entries are replacements/additions. Total requested new load, not increments to sum.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2025-007:4","entity_name":"Eldean Piqua AES Ohio","operator_code":"Dayton-2025-007","reported_value":600,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2029-12","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 440 MW December 2029 and 600 MW December 2030 struck through. Red entries are replacements/additions. Total requested new load, not increments to sum.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2025-007:5","entity_name":"Eldean Piqua AES Ohio","operator_code":"Dayton-2025-007","reported_value":870,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2030-05","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 440 MW December 2029 and 600 MW December 2030 struck through. Red entries are replacements/additions. Total requested new load, not increments to sum.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2025-007:6","entity_name":"Eldean Piqua AES Ohio","operator_code":"Dayton-2025-007","reported_value":1140,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2031-11","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 440 MW December 2029 and 600 MW December 2030 struck through. Red entries are replacements/additions. Total requested new load, not increments to sum.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2025-007:7","entity_name":"Eldean Piqua AES Ohio","operator_code":"Dayton-2025-007","reported_value":1400,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2033-05","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 440 MW December 2029 and 600 MW December 2030 struck through. Red entries are replacements/additions. Total requested new load, not increments to sum.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2025-007:8","entity_name":"Eldean Piqua AES Ohio","operator_code":"Dayton-2025-007","reported_value":440,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"superseded_request","comparison":"equal","season":"both","reported_period":"2029-12","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"superseded","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 440 MW December 2029 and 600 MW December 2030 struck through. Red entries are replacements/additions. Total requested new load, not increments to sum.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2025-007:9","entity_name":"Eldean Piqua AES Ohio","operator_code":"Dayton-2025-007","reported_value":600,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"superseded_request","comparison":"equal","season":"both","reported_period":"2030-12","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"superseded","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 440 MW December 2029 and 600 MW December 2030 struck through. Red entries are replacements/additions. Total requested new load, not increments to sum.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0051:1","entity_name":"Emy Spotsylvania REC","operator_code":"DOM-2025-0051","reported_value":212,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"expected load","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested 2027-07-05.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-12---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":7,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:48.584148+00:00","sha256":"0a3e8e293f93818b642ef4587cd826eb7c1debcc432444a96a2b75a74e49c732","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-c04fc7a237ff749862d8","entity_name":"Entergy Louisiana Evest LLC generation support","operator_code":null,"reported_value":5278,"reported_unit":"MW","kind":"procurement_generation","scope":"portfolio","qualifier":"Proposed utility generation resources supporting Evest service; no exclusive onsite supply claim. Generation nameplate is not data-center load","temporal_role":"proposed","as_of":null,"as_of_basis":"not established; retrieval is not publication","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/7323/000006598426000283/etr-20260630.htm","title":"etr-20260630","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:42:04.602830+00:00","sha256":"f34334804bb5599c06db4184e64adf8ea846476ac4ceef13584f148663b1b188","source_family":"sec_utility","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:65209:EQX53:operable","entity_name":"Equinix - Billerica","operator_code":"65209","reported_value":1.9,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQX53","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"41 Alexander Road","city":"Billerica","county":"Middlesex","state":"MA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":23765,"quantity_cell":"P23765"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:66150:EQX36:operable","entity_name":"Equinix - Elmsford","operator_code":"66150","reported_value":1.7,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQX36","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"401 Fieldcrest Dr","city":"Elmsford","county":"Westchester","state":"NY","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":24888,"quantity_cell":"P24888"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62671:EQX1A:operable","entity_name":"Equinix Caspian Dr. Fuel Cell","operator_code":"62671","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQX1A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"255 Caspian Drive","city":"Sunnyvale","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","EIA coordinate differs more than 500 m from the exact address candidate. Do not copy the plant point.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":20978,"quantity_cell":"P20978"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62671:EQX1B:operable","entity_name":"Equinix Caspian Dr. Fuel Cell","operator_code":"62671","reported_value":2.8,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQX1B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"255 Caspian Drive","city":"Sunnyvale","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","EIA coordinate differs more than 500 m from the exact address candidate. Do not copy the plant point.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":20979,"quantity_cell":"P20979"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62704:EQX09:operable","entity_name":"Equinix Douglas St. Fuel Cell","operator_code":"62704","reported_value":1,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQX09","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"445 North Douglas St.","city":"El Segundo","county":"Los Angeles","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":21042,"quantity_cell":"P21042"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62704:EQX95:operable","entity_name":"Equinix Douglas St. Fuel Cell","operator_code":"62704","reported_value":1,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQX95","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"445 North Douglas St.","city":"El Segundo","county":"Los Angeles","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":21043,"quantity_cell":"P21043"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62702:EQ14A:operable","entity_name":"Equinix Great Oaks Blvd. Fuel Cell","operator_code":"62702","reported_value":2.4,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQ14A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"11 Great Oaks Blvd.","city":"San Jose","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":21037,"quantity_cell":"P21037"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62702:EQ14B:operable","entity_name":"Equinix Great Oaks Blvd. Fuel Cell","operator_code":"62702","reported_value":2.1,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQ14B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"11 Great Oaks Blvd.","city":"San Jose","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":21038,"quantity_cell":"P21038"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62703:EQ13A:operable","entity_name":"Equinix Lundy Ave. Fuel Cell","operator_code":"62703","reported_value":1.8,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQ13A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"1735 Lundy Ave.","city":"San Jose","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":21039,"quantity_cell":"P21039"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62703:EQ13B:operable","entity_name":"Equinix Lundy Ave. Fuel Cell","operator_code":"62703","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQ13B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"1735 Lundy Ave.","city":"San Jose","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":21040,"quantity_cell":"P21040"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62703:EQX05:operable","entity_name":"Equinix Lundy Ave. Fuel Cell","operator_code":"62703","reported_value":1.1,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQX05","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"1735 Lundy Ave.","city":"San Jose","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":21041,"quantity_cell":"P21041"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:62705:EQX08:operable","entity_name":"Equinix Maple Ave. Fuel Cell","operator_code":"62705","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQX08","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"1920 E. Maple Ave","city":"El Segundo","county":"Los Angeles","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":21044,"quantity_cell":"P21044"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:60223:EQXOO:operable","entity_name":"Equinix San Jose","operator_code":"60223","reported_value":1.1,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"OP: Operating - in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as needed (intermittent or seasonal) basis.","generator_id":"EQXOO","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"9 Great Oaks Boulevard","city":"San Jose","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":18177,"quantity_cell":"P18177"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:16","entity_name":"FX Solutions – Atlas Power** / Williston, North Dakota","operator_code":null,"reported_value":700,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2024","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-primary03::orm1-transformer-rating","subject_id":"dc-80a1c06b299611c9","entity_name":"Fibernet ORM1 host","operator_code":null,"reported_value":1.5,"reported_unit":"MW","kind":"transformer_rating","scope":"operator_facility","electrical_extent":"one_transformer_rating_not_building_demand","comparison":"equal","upper_value":null,"qualifier":"The Power Feeds row states one 1.5 MW transformer. Preserve MW exactly as printed, without changing to MVA. Transformer rating is equipment context, not contracted utility service, demand or IT capacity. ORM1 is the scope of pages 1 to 3; no fact is transferred from later ORM2 pages. Whole-building exclusive occupancy and interior extent remain unknown.","temporal_role":"undated_operator_technical_specification","as_of":null,"as_of_basis":"No explicit reporting or effective date is printed on these pages. URL directories and document edition codes are not dates.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["This operator specification does not establish metered demand, contracted delivery or commissioning.","The rating is not eligible for a facility-MW or IT-MW scalar.","Typed catalog context only. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.fiber.net/wp-content/uploads/2024/06/Fibernet-utah-data-center-information.pdf","title":"Fibernet ORM1 data center information","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T14:41:32.669581+00:00","sha256":"1104fc7e5df489f434d215ccff6bfec6073a26f3e7a3eb6877b790af25390287","source_family":"operator_document","reuse_note":"Factual extraction with attribution only. No open license or right to redistribute the PDF or page images is inferred.","license":"company-public"},{"url":"https://www.fiber.net/wp-content/uploads/2024/06/Fibernet-utah-data-center-information.pdf","title":"Fibernet ORM1 data center information","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T14:41:32.669581+00:00","sha256":"1104fc7e5df489f434d215ccff6bfec6073a26f3e7a3eb6877b790af25390287","source_family":"operator_document","reuse_note":"Factual extraction with attribution only. No open license or right to redistribute the PDF or page images is inferred.","license":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"unit_count":1,"dimension":"power","source_extraction_kind":"transformer_rating_mw","source_observation_id":"power-primary03:dc-80a1c06b299611c9:transformer_rating_mw","quantity_role":"supply_or_equipment_rating_not_facility_demand","whole_building_exclusive_occupancy":null,"nonadditive_group":"power-primary03::orm1-transformer-rating","source_scope_review":{"sha256":"ca5cd338173b9bf7b2ee186eccc7fdbfec3262bf28b4e73602969faca698c045","reviewer":"Codex parent","reviewed_at":"2026-09-18T10:48:24.970281+00:00","scope":"two_native_catalog_ratings_only","independent_audit":false},"catalog_review":{"reviewer":"Codex parent","reviewed_at":"2026-09-18T11:03:11.151656+00:00","scope":"typed_catalog_only_existing_host_reference"}},{"id":"pjm:DOM-2024-0016:1","entity_name":"Firehouse Loudoun","operator_code":"DOM-2024-0016","reported_value":209,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"summer","reported_period":"initial","temporal_role":"dated_load_record","as_of":"2026-04-07","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old requested 2028-01-31 struck through; new 2030-12-31.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260407/20260407-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":11,"published":"2026-04-07","retrieved_at":"2026-09-17T01:44:08.334712+00:00","sha256":"bd83050e6d2f294d432e871a3bcedfd3574ff6489ea54094d073b6e1118076b0","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0016:2","entity_name":"Firehouse Loudoun","operator_code":"DOM-2024-0016","reported_value":160,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"winter","reported_period":"initial","temporal_role":"dated_load_record","as_of":"2026-04-07","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old requested 2028-01-31 struck through; new 2030-12-31.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260407/20260407-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":11,"published":"2026-04-07","retrieved_at":"2026-09-17T01:44:08.334712+00:00","sha256":"bd83050e6d2f294d432e871a3bcedfd3574ff6489ea54094d073b6e1118076b0","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0016:3","entity_name":"Firehouse Loudoun","operator_code":"DOM-2024-0016","reported_value":234,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2030","temporal_role":"dated_load_record","as_of":"2026-04-07","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old requested 2028-01-31 struck through; new 2030-12-31.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260407/20260407-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":11,"published":"2026-04-07","retrieved_at":"2026-09-17T01:44:08.334712+00:00","sha256":"bd83050e6d2f294d432e871a3bcedfd3574ff6489ea54094d073b6e1118076b0","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-aurora","entity_name":"Flexential - Denver - Aurora","operator_code":"Aurora","reported_value":6.75,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":15,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":14,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-centennial","entity_name":"Flexential - Denver - Centennial Data Center","operator_code":"Centennial","reported_value":1.6,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":17,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":16,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-englewood","entity_name":"Flexential Denver - Englewood","operator_code":"Englewood","reported_value":18,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":19,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":18,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::flex-h2-backup-design","entity_name":"Flexential Hillsboro 2 backup expansion","operator_code":null,"reported_value":32.5,"reported_unit":"MW","kind":"backup_generation_total","scope":"building_backup","dimension":"real_power","unit_count":null,"qualifier":"Ten generators after proposed expansion. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Report explicitly maps former 23605 NW Huffman to 5737 NE Huffman, with generators west of the building. The phrase total electrical capacity is inside the emergency-generator paragraph. Six prior generators and four additions describe backup expansion."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0241-SI-01_RR_2020.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-16T22:29:45.483240+00:00","sha256":"6fcd264a178753672082570c68230534b2829af907c756d791e31dce0f6e6a61","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::flex-h2-backup-prior","entity_name":"Flexential Hillsboro 2 backup expansion","operator_code":null,"reported_value":19.5,"reported_unit":"MW","kind":"backup_generation_total","scope":"building_backup","dimension":"real_power","unit_count":null,"qualifier":"Six existing emergency generators before the four-unit expansion. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Report explicitly maps former 23605 NW Huffman to 5737 NE Huffman, with generators west of the building. The phrase total electrical capacity is inside the emergency-generator paragraph. Six prior generators and four additions describe backup expansion."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0241-SI-01_RR_2020.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-16T22:29:45.483240+00:00","sha256":"6fcd264a178753672082570c68230534b2829af907c756d791e31dce0f6e6a61","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::flex-h3-backup-total","entity_name":"Flexential Hillsboro 3 backup design","operator_code":null,"reported_value":58.5,"reported_unit":"MW","kind":"backup_generation_total","scope":"building_backup","dimension":"real_power","unit_count":null,"qualifier":"Eighteen proposed standby units. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Eighteen 3.25 MW emergency units and a directly stated 58.5 MW backup total. The report covers five previously approved units plus thirteen additional units. Expiry shown August 1, 2026 is not proof of closure or renewal status."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0244-ST-01_RR_2021.PDF","title":"deqonline.deq.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-16T22:29:34.333686+00:00","sha256":"2b18b2ec13660c617eb4cc423e1062d6255687140568126593b10f57bcb36146","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-las-north","entity_name":"Flexential Las Vegas - North","operator_code":"North Las Vegas","reported_value":9,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":52,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":51,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-hil2","entity_name":"Flexential Portland - Hillsboro 2","operator_code":"Hillsboro 2","reported_value":18,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":67,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":66,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-hil3","entity_name":"Flexential Portland - Hillsboro 3","operator_code":"Hillsboro 3","reported_value":36,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":69,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":68,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-hil4","entity_name":"Flexential Portland - Hillsboro 4","operator_code":"Hillsboro 4","reported_value":18,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":71,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":70,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-slc-downtown","entity_name":"Flexential Salt Lake City - Downtown","operator_code":"Downtown Salt Lake City","reported_value":2.65,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":95,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":94,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-fairpark","entity_name":"Flexential Salt Lake City - Fair Park","operator_code":"Fair Park","reported_value":490,"reported_unit":"kW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":97,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":96,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-millcreek","entity_name":"Flexential Salt Lake City - Millcreek","operator_code":"Millcreek","reported_value":1.92,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":101,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":100,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::flex-southvalley","entity_name":"Flexential Salt Lake City - South Valley","operator_code":"South Valley","reported_value":1.2,"reported_unit":"MW","kind":"ups_critical_load_capacity","scope":"operator_facility","qualifier":"Native UPS critical-load capacity, not promoted to total facility or explicitly defined IT power. Named facility is associated with an accepted record, but this is not independent proof of whole-building IT electrical boundaries.","comparison":null,"as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":103,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.flexential.com/system/files/file/2024-06/Fleet-Tour-Guide-hvc.pdf","title":"www.flexential.com","pdf_page":102,"published":null,"retrieved_at":"2026-09-17T04:28:20.348336+00:00","sha256":"2eb9c3647360c4ee1122ee1b40466cd35361c2e781062ea3fd04110074395f41","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0071:1","entity_name":"Frances Louisa REC","operator_code":"DOM-2025-0071","reported_value":176,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"expected load","temporal_role":"dated_load_record","as_of":"2026-01-06","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested 2027-08-01.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260106/20260106-item-07---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":16,"published":"2026-01-06","retrieved_at":"2026-09-17T01:44:51.852353+00:00","sha256":"2f238764129e7df2ba1fbc7af464705ef0354973d8fcb1ba49a4350e86f31060","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1748","entity_name":"GLOBE DH 2","operator_code":"1748","reported_value":192,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"01-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"NIAGARA FALLS","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche.","source county field contains locality name"],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":58,"quantity_cell":"E58"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1748:summer","entity_name":"GLOBE DH 2","operator_code":"1748","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jun-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1748:winter","entity_name":"GLOBE DH 2","operator_code":"1748","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jun-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1749","entity_name":"Globe DH 3","operator_code":"1749","reported_value":192,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"03-2029","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"niagara falls","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche.","source county field contains locality name"],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":59,"quantity_cell":"E59"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1749:summer","entity_name":"Globe DH 3","operator_code":"1749","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1749:winter","entity_name":"Globe DH 3","operator_code":"1749","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1747","entity_name":"Globe Digital Holdings - 1","operator_code":"1747","reported_value":192,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"10-2028","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Niagara","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":57,"quantity_cell":"E57"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1747:summer","entity_name":"Globe Digital Holdings - 1","operator_code":"1747","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jun-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1747:winter","entity_name":"Globe Digital Holdings - 1","operator_code":"1747","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jun-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-ce36c3ea9dec12edc625","entity_name":"Goodman Energy Park Vernon two-building campus","operator_code":null,"reported_value":83.2,"reported_unit":"MW","kind":"facility_expected_demand","scope":"campus","qualifier":"Combined two-building design. Generic singular building in PUE paragraph does not change the campus scope. No per-building allocation.","temporal_role":"proposed","as_of":"2025-02-28","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=262029&DocumentContentId=98538","title":"GIC Vernon SPPE Application VBGF - Main Application 200 page(s)","pdf_page":15,"published":"2025-02-28","retrieved_at":"2026-09-16T22:55:40.278358+00:00","sha256":"dd16b3b58eae17476f6f742eb1ec271d94d1a7eafe964f2375c94f39da803f60","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-10be6d403b1d47b95af6","entity_name":"Goodman Energy Park Vernon two-building campus","operator_code":null,"reported_value":99,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Combined two-building design. Generic singular building in PUE paragraph does not change the campus scope. No per-building allocation.","temporal_role":"proposed","as_of":"2025-02-28","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=262029&DocumentContentId=98538","title":"GIC Vernon SPPE Application VBGF - Main Application 200 page(s)","pdf_page":15,"published":"2025-02-28","retrieved_at":"2026-09-16T22:55:40.278358+00:00","sha256":"dd16b3b58eae17476f6f742eb1ec271d94d1a7eafe964f2375c94f39da803f60","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-e5fa81a0add837077d68","entity_name":"Goodman Energy Park Vernon two-building campus","operator_code":null,"reported_value":64,"reported_unit":"MW","kind":"it_critical","scope":"campus","qualifier":"Combined two-building design. Generic singular building in PUE paragraph does not change the campus scope. No per-building allocation.","temporal_role":"proposed","as_of":"2025-02-28","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=262029&DocumentContentId=98538","title":"GIC Vernon SPPE Application VBGF - Main Application 200 page(s)","pdf_page":15,"published":"2025-02-28","retrieved_at":"2026-09-16T22:55:40.278358+00:00","sha256":"dd16b3b58eae17476f6f742eb1ec271d94d1a7eafe964f2375c94f39da803f60","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:14","entity_name":"Google / Cedar Rapids, Iowa","operator_code":null,"reported_value":600,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2026","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:13","entity_name":"Google / Council Bluffs, Iowa","operator_code":null,"reported_value":500,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"existing_load_highlighted","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"existing_load_highlighted","generator_id":null,"proposed_date_native":"Existing","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyperscaler-botetourt-requested-peak-2026-09","entity_name":"Google Botetourt campus / Daleville customer delivery point","operator_code":null,"reported_value":300,"reported_unit":"MW","kind":"requested_load","scope":"campus_delivery_point","qualifier":"Approximate projected peak at a campus delivery point, requested in September 2026.","comparison":"approximately","temporal_role":"projected_peak_demand_request","as_of":"2026-09","as_of_basis":"Application month, day unknown","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Requested peak at one campus delivery point. The utility application does not allocate demand among physical buildings. County page explicitly connects Google to the named Daleville project. No proximity match or division by three. Public volumes1/2 captured; volume3 not offered by the project page and not inspected."],"sources":[{"url":"https://aeptransmission.com/Virginia/DalevilleArea/docs/Daleville Area Transmission Improvements Project_Volume 1_Public.pdf#view=Fit","title":"aeptransmission.com","pdf_page":19,"published":null,"retrieved_at":"2026-09-17T10:52:46.133536+00:00","sha256":"e1b53a6ee60b1f450ad2eb3ac4ad7d4fef6c136233c7fc612c3e4c4c3cf64bc6","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."},{"url":"https://aeptransmission.com/Virginia/DalevilleArea/docs/Daleville Area Transmission Improvements Project_Volume 1_Public.pdf#view=Fit","title":"aeptransmission.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T10:52:46.133536+00:00","sha256":"e1b53a6ee60b1f450ad2eb3ac4ad7d4fef6c136233c7fc612c3e4c4c3cf64bc6","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."},{"url":"https://www.botetourtva.gov/1024/Google-Data-Center-Electricity","title":"www.botetourtva.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T10:47:21.070850+00:00","sha256":"fba195b84355d4fd7fb24df33e1cb85b92ef186da455b6e8adc3183da17f324e","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-48d43c90ed3e58813d72","entity_name":"Google Xcel Minnesota energy package","operator_code":null,"reported_value":1900,"reported_unit":"MW","kind":"procurement_generation","scope":"portfolio","qualifier":"Clean energy resources in ESA package, not customer facility power demand","temporal_role":"proposed","as_of":null,"as_of_basis":"not established; retrieval is not publication","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://s202.q4cdn.com/586283047/files/doc_financials/2026/q1/Xcel-Earnings-Release-Q1-2026.pdf","title":"s202.q4cdn.com","pdf_page":11,"published":null,"retrieved_at":"2026-09-17T01:42:04.802432+00:00","sha256":"e813862743b5a42122c514e0a79ea79665582285d6108bf825cdcbea29b727d6","source_family":"utility_investor_disclosure","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:10","entity_name":"Google* / Fort Wayne, Indiana","operator_code":null,"reported_value":null,"reported_unit":null,"kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":null,"season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"TBA","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-4e57a97ef3ba12203271","entity_name":"Great Oaks South SV-12","operator_code":null,"reported_value":33,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Final EIR states approximately 33 MW for each building including IT, cooling, lighting and monitoring; no campus division.","temporal_role":"proposed","as_of":"2021-07-28","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=239063&DocumentContentId=72499","title":"Great Oaks South Backup Generating Facility Final Environmental Impact Report 579 page(s)","pdf_page":70,"published":"2021-07-28","retrieved_at":"2026-09-16T22:57:33.090911+00:00","sha256":"4ebdb3e6a8a5797a0004663472c332a9fdd8d5b58382655febd0f50cff45c908","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-4243cbc699618129666b","entity_name":"Great Oaks South SV-12","operator_code":null,"reported_value":25,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Applicant explicitly assigns 25.0 MW critical IT to each of three buildings.","temporal_role":"proposed","as_of":"2021-03-12","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=237149&DocumentContentId=70329","title":"GSOBGF Revised Project Description Project Description 32 page(s)","pdf_page":5,"published":"2021-03-12","retrieved_at":"2026-09-16T22:54:59.561404+00:00","sha256":"18354be3407b06d4ad25a3e6f8fe8910ff0e657580e4fc0e2d984f4b66276394","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-9242e46e835e7d492e2c","entity_name":"Great Oaks South SV-18","operator_code":null,"reported_value":33,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Final EIR states approximately 33 MW for each building including IT, cooling, lighting and monitoring; no campus division.","temporal_role":"proposed","as_of":"2021-07-28","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=239063&DocumentContentId=72499","title":"Great Oaks South Backup Generating Facility Final Environmental Impact Report 579 page(s)","pdf_page":70,"published":"2021-07-28","retrieved_at":"2026-09-16T22:57:33.090911+00:00","sha256":"4ebdb3e6a8a5797a0004663472c332a9fdd8d5b58382655febd0f50cff45c908","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-c0ed2cf23a0b9d68c986","entity_name":"Great Oaks South SV-18","operator_code":null,"reported_value":25,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Applicant explicitly assigns 25.0 MW critical IT to each of three buildings.","temporal_role":"proposed","as_of":"2021-03-12","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=237149&DocumentContentId=70329","title":"GSOBGF Revised Project Description Project Description 32 page(s)","pdf_page":5,"published":"2021-03-12","retrieved_at":"2026-09-16T22:54:59.561404+00:00","sha256":"18354be3407b06d4ad25a3e6f8fe8910ff0e657580e4fc0e2d984f4b66276394","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-369dca7856962ac7b45e","entity_name":"Great Oaks South SV-19","operator_code":null,"reported_value":33,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Final EIR states approximately 33 MW for each building including IT, cooling, lighting and monitoring; no campus division.","temporal_role":"proposed","as_of":"2021-07-28","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=239063&DocumentContentId=72499","title":"Great Oaks South Backup Generating Facility Final Environmental Impact Report 579 page(s)","pdf_page":70,"published":"2021-07-28","retrieved_at":"2026-09-16T22:57:33.090911+00:00","sha256":"4ebdb3e6a8a5797a0004663472c332a9fdd8d5b58382655febd0f50cff45c908","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-76c9cd39d8cceb4b53d0","entity_name":"Great Oaks South SV-19","operator_code":null,"reported_value":25,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Applicant explicitly assigns 25.0 MW critical IT to each of three buildings.","temporal_role":"proposed","as_of":"2021-03-12","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=237149&DocumentContentId=70329","title":"GSOBGF Revised Project Description Project Description 32 page(s)","pdf_page":5,"published":"2021-03-12","retrieved_at":"2026-09-16T22:54:59.561404+00:00","sha256":"18354be3407b06d4ad25a3e6f8fe8910ff0e657580e4fc0e2d984f4b66276394","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-6843866b962551d40f15","entity_name":"Great Oaks South three-building campus","operator_code":null,"reported_value":99,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Maximum combined three-building demand. Distinct from each 33 MW building.","temporal_role":"proposed","as_of":"2021-12-10","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=240902&DocumentContentId=74743","title":"efiling.energy.ca.gov","pdf_page":11,"published":"2021-12-10","retrieved_at":"2026-09-17T02:21:59.028127+00:00","sha256":"5d8c31e858a97890ad7608f32e697f85620202160ee45b4be04200e293b3644f","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"regional:saline-contracted-demand","subject_id":"regional:saline","entity_name":"Green Chile Ventures / Oracle Saline Township","operator_code":null,"reported_value":1383,"reported_unit":"MW","kind":"regulator_reported_contracted_demand","source_metric":"saline-contracted-demand","scope":"customer_campus","qualifier":"Regulator describes the data center demand associated with conditionally approved primary supply contracts.","quantity_role":"regulator_reported_contracted_demand","comparison":"equal","season":null,"reported_period":"contract approval December 18, 2025","temporal_role":"load_evidence","as_of":"2025-12-18","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"conditionally_approved_regulator_summary","execution_status":"redacted_agreement_captured_regulator_reports_conditional_approval","nonadditive_group":"saline-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Saline Township","state":"MI","location_precision":"named_locality"},"unresolved_conflicts":["Minimum billing at 80 percent is not utilization.","Regulator requires priority load reduction and cost protections. March 27, 2026 release reports rehearing denial.","Agreement ramp is redacted. Separate energy storage capacity is not added to customer demand.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001Xeg1uAAB","title":"mi-psc.my.site.com","pdf_page":1,"published":"2025-12-18","retrieved_at":"2026-09-17T03:57:14.962043+00:00","sha256":"6ddfa9cc93a4e3dca29f0e296aa236347669a96d25cb14767b10679ae81572d8","source_family":"regulator_release","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001rbzGwAAI","title":"mi-psc.my.site.com","pdf_page":2,"published":"2026-03-27","retrieved_at":"2026-09-17T03:57:15.134303+00:00","sha256":"ca1fa7081ae1aa49e6f98c3906d53dd4364b0448a0d846bdac1501ac218a9094","source_family":"regulator_release","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001MH71XAAT","title":"mi-psc.my.site.com","pdf_page":46,"published":"2025-11-03","retrieved_at":"2026-09-17T03:56:06.367305+00:00","sha256":"2e927e89666e6e67c36ce265f2a808efac14a44eee531a7efd0a5a6cd7a68017","source_family":"regulatory_filing","reuse_note":"Public primary document. No open republication license asserted. Retain local source bytes; publish attributed facts and short excerpts only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-saline","note":"The utility contract names Green Chile Ventures as the customer and RD Michigan Property Owner 1 LLC as developer and landlord. The township judgment names RD Michigan Property Owner I LLC and identifies Project Mitten north of US-12. This is a proposed association between the campus records. The I and 1 legal-name variants remain unresolved; no building or service-address match is established.","scope":"primary_plan_campus_property","sources":[{"url":"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001MH71XAAT","title":"mi-psc.my.site.com","pdf_page":46,"published":"2025-11-03","retrieved_at":"2026-09-17T03:56:06.367305+00:00","sha256":"2e927e89666e6e67c36ce265f2a808efac14a44eee531a7efd0a5a6cd7a68017","source_family":"regulatory_filing","as_of":"2025-10-22"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":2,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-10-15"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":36,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-08-14"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":3,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-10-15"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":5,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-10-15"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":37,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-08-14"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:saline-application-maximum","subject_id":"regional:saline","entity_name":"Green Chile Ventures / Oracle Saline Township","operator_code":null,"reported_value":1.4,"reported_unit":"GW","kind":"requested_maximum","source_metric":"saline-application-maximum","scope":"customer_campus","qualifier":"Approximate maximum customer load in the filed application; native GW retained.","quantity_role":"requested_maximum","comparison":"approximately","season":null,"reported_period":"maximum planned by December 2027","temporal_role":"load_evidence","as_of":"2025-11-03","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"filed_application_historical","execution_status":"special_contracts_reported_executed_subject_to_approval","nonadditive_group":"saline-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"Saline Township","state":"MI","location_precision":"named_locality"},"unresolved_conflicts":["Planned load starts January 2027 in the application. This is not a measured value.","Later regulator release reports 1,383 MW. These are nonadditive descriptions; do not treat the rounded 1.4 GW as a second project.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001MH71XAAT","title":"mi-psc.my.site.com","pdf_page":3,"published":"2025-11-03","retrieved_at":"2026-09-17T03:56:06.367305+00:00","sha256":"2e927e89666e6e67c36ce265f2a808efac14a44eee531a7efd0a5a6cd7a68017","source_family":"regulatory_filing","reuse_note":"Public primary document. No open republication license asserted. Retain local source bytes; publish attributed facts and short excerpts only."},{"url":"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001MH71XAAT","title":"mi-psc.my.site.com","pdf_page":46,"published":"2025-11-03","retrieved_at":"2026-09-17T03:56:06.367305+00:00","sha256":"2e927e89666e6e67c36ce265f2a808efac14a44eee531a7efd0a5a6cd7a68017","source_family":"regulatory_filing","reuse_note":"Public primary document. No open republication license asserted. Retain local source bytes; publish attributed facts and short excerpts only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-saline","note":"The utility contract names Green Chile Ventures as the customer and RD Michigan Property Owner 1 LLC as developer and landlord. The township judgment names RD Michigan Property Owner I LLC and identifies Project Mitten north of US-12. This is a proposed association between the campus records. The I and 1 legal-name variants remain unresolved; no building or service-address match is established.","scope":"primary_plan_campus_property","sources":[{"url":"https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001MH71XAAT","title":"mi-psc.my.site.com","pdf_page":46,"published":"2025-11-03","retrieved_at":"2026-09-17T03:56:06.367305+00:00","sha256":"2e927e89666e6e67c36ce265f2a808efac14a44eee531a7efd0a5a6cd7a68017","source_family":"regulatory_filing","as_of":"2025-10-22"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":2,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-10-15"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":36,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-08-14"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":3,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-10-15"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":5,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-10-15"},{"url":"https://salinetownship.org/uploads/notices/SalineDataCenterConsentJudgmentFinalExecutionCopy492124804975v1.pdf","title":"salinetownship.org","pdf_page":37,"published":"2025-10-15","retrieved_at":"2026-09-17T04:39:00.713051+00:00","sha256":"1481e56f84eb5f0f768020de6fff67f06821011a1e16ed70515c23c56c0bc9a1","source_family":"public_primary_identity_source","as_of":"2025-08-14"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"nyiso-queue:1725","entity_name":"Greenidge 200 MW Data Center Project","operator_code":"1725","reported_value":200,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"05-2028","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Yates","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","Greenidge and Yates county align. 200 MW is a request at the generating-plant/data-center location, not one observed roof."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":37,"quantity_cell":"E37"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1725:summer","entity_name":"Greenidge 200 MW Data Center Project","operator_code":"1725","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-29","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","Greenidge and Yates county align. 200 MW is a request at the generating-plant/data-center location, not one observed roof."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1725:winter","entity_name":"Greenidge 200 MW Data Center Project","operator_code":"1725","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-29","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","Greenidge and Yates county align. 200 MW is a request at the generating-plant/data-center location, not one observed roof."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:776","entity_name":"Greenidge Load","operator_code":"0776","reported_value":60,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"FS Pending","generator_id":null,"proposed_date_native":"04-2030","classification":"crypto_mining","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Yates","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":11,"quantity_cell":"E11"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:776:summer","entity_name":"Greenidge Load","operator_code":"776","reported_value":60,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Apr-30","classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:776:winter","entity_name":"Greenidge Load","operator_code":"776","reported_value":60,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Apr-30","classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1762","entity_name":"Highwall Data Center","operator_code":"1762","reported_value":400,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"03-2029","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Clearfield","state":"PA","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":72,"quantity_cell":"E72"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1682","entity_name":"Hudson Valley Data Center","operator_code":"1682","reported_value":50,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Withdrawn","generator_id":null,"proposed_date_native":"09-2028","classification":"unclassified_data_center_name","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Rockland","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":26,"quantity_cell":"E26"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1714","entity_name":"Hudson Valley Data Center","operator_code":"1714","reported_value":50,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Accepted Cost Allocation/IA in Progress","generator_id":null,"proposed_date_native":"01-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Rockland","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":29,"quantity_cell":"E29"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1714:summer","entity_name":"Hudson Valley Data Center","operator_code":"1714","reported_value":50,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Feb-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1714:winter","entity_name":"Hudson Valley Data Center","operator_code":"1714","reported_value":50,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Feb-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-7b2643e07b932f97b255","entity_name":"Humphreys Peak Power LLC Tucson campus","operator_code":null,"reported_value":286,"reported_unit":"MW","kind":"contracted_service","scope":"campus","qualifier":"Up to; ACC approval reported December 3 2025; campus service limit, not observed demand","temporal_role":"contracted","as_of":null,"as_of_basis":"not established; retrieval is not publication","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.tep.com/data-center-esa/","title":"Data Center ESA – Tucson Electric Power","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:42:04.327005+00:00","sha256":"58c4ab88d58d0411692cc342d567548307127d4e27a2ff4a7d0d497b39746da6","source_family":"utility_service_agreement","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-inl4","entity_name":"INL C3","operator_code":null,"reported_value":4,"reported_unit":"MW","kind":"untyped_data_center_design","scope":"data_center_portion","qualifier":"The November 2020 report describes a 4 MW data-center portion within an office building. Expansion and electrical-feed units differ elsewhere in the report.","comparison":null,"temporal_role":"dated_report","as_of":"2020-11","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://inldigitallibrary.inl.gov/content/uploads/50/2026/04/Sort_27265.pdf","title":"inldigitallibrary.inl.gov","pdf_page":19,"published":null,"retrieved_at":"2026-09-17T11:56:06.140829+00:00","sha256":"bf429dfc3a17a26765888772bbc0ed85bd9552e744f53f56b195b26f45cc84d3","source_family":"public_registry","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-inla","entity_name":"INL C3 Utility A","operator_code":null,"reported_value":3.75,"reported_unit":"MVA","kind":"utility_apparent_power","scope":"electrical_feed","qualifier":"The electrical diagram reports 3.75 MVA for Utility A. A later table labels the same feed in MW. Neither a power-factor conversion nor a sum of feeds is justified.","comparison":null,"temporal_role":"dated_report","as_of":"2020-11","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://inldigitallibrary.inl.gov/content/uploads/50/2026/04/Sort_27265.pdf","title":"inldigitallibrary.inl.gov","pdf_page":25,"published":null,"retrieved_at":"2026-09-17T11:56:06.140829+00:00","sha256":"bf429dfc3a17a26765888772bbc0ed85bd9552e744f53f56b195b26f45cc84d3","source_family":"public_registry","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1740","entity_name":"Incremental Load Request for Remington Factory Redevelopment","operator_code":"1740","reported_value":400,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"07-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Herkimer","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":50,"quantity_cell":"E50"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1740:summer","entity_name":"Incremental Load Request for Remington Factory Redevelopment","operator_code":"1740","reported_value":400,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Aug-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1740:winter","entity_name":"Incremental Load Request for Remington Factory Redevelopment","operator_code":"1740","reported_value":400,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Aug-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:proposed_available_service_mva:intel-juliette:August 1, 2028","entity_name":"Intel Juliette property","operator_code":null,"reported_value":73.0,"reported_unit":"MVA","kind":"proposed_available_service_mva","scope":"customer_service_property","qualifier":"Table D1 available capacity for the Intel premises including all service addresses.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"August 1, 2028","temporal_role":"load_evidence","as_of":"2025-05-27","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_agreement_form; both_signature_fields_blank","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"3750 Juliette Lane","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Table includes 73 MVA on August 1, 2028; council prose says additional capacity no earlier than August 1, 2029. The summary may refer to the full 17 MVA increment, so this is a timing ambiguity rather than a proven contradiction. Keep the dated table and summary distinct."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=14231851&GUID=D3D66287-C9B3-4564-9B45-4E2E6FEF9E94","title":"santaclara.legistar.com","pdf_page":24,"published":null,"retrieved_at":"2026-09-17T03:21:38.240724+00:00","sha256":"4e5bc0f98084e1c1a44d853f5888f024ac2e38d6e198189175c4704d239d0316","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:proposed_available_service_mva:intel-juliette:August 1, 2029","entity_name":"Intel Juliette property","operator_code":null,"reported_value":79.0,"reported_unit":"MVA","kind":"proposed_available_service_mva","scope":"customer_service_property","qualifier":"Table D1 available capacity for the Intel premises including all service addresses.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"August 1, 2029","temporal_role":"load_evidence","as_of":"2025-05-27","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_agreement_form; both_signature_fields_blank","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"3750 Juliette Lane","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Table includes 73 MVA on August 1, 2028; council prose says additional capacity no earlier than August 1, 2029. The summary may refer to the full 17 MVA increment, so this is a timing ambiguity rather than a proven contradiction. Keep the dated table and summary distinct."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=14231851&GUID=D3D66287-C9B3-4564-9B45-4E2E6FEF9E94","title":"santaclara.legistar.com","pdf_page":24,"published":null,"retrieved_at":"2026-09-17T03:21:38.240724+00:00","sha256":"4e5bc0f98084e1c1a44d853f5888f024ac2e38d6e198189175c4704d239d0316","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:proposed_available_service_mva:intel-juliette:Effective Date","entity_name":"Intel Juliette property","operator_code":null,"reported_value":62.0,"reported_unit":"MVA","kind":"proposed_available_service_mva","scope":"customer_service_property","qualifier":"Table D1 available capacity for the Intel premises including all service addresses.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"Effective Date","temporal_role":"load_evidence","as_of":"2025-05-27","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_agreement_form; both_signature_fields_blank","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"3750 Juliette Lane","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Table includes 73 MVA on August 1, 2028; council prose says additional capacity no earlier than August 1, 2029. The summary may refer to the full 17 MVA increment, so this is a timing ambiguity rather than a proven contradiction. Keep the dated table and summary distinct."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=14231851&GUID=D3D66287-C9B3-4564-9B45-4E2E6FEF9E94","title":"santaclara.legistar.com","pdf_page":24,"published":null,"retrieved_at":"2026-09-17T03:21:38.240724+00:00","sha256":"4e5bc0f98084e1c1a44d853f5888f024ac2e38d6e198189175c4704d239d0316","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0036:1","entity_name":"Jamestown Drive Petersburg","operator_code":"DOM-2024-0036","reported_value":100,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"strictly_greater_than","season":"both","reported_period":"ultimate","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Total in excess of 100 MW, not 100 MW exact. Former James Hill label. Requested 2028-12-31.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-12---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":5,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:48.584148+00:00","sha256":"0a3e8e293f93818b642ef4587cd826eb7c1debcc432444a96a2b75a74e49c732","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1754","entity_name":"Kenwood Tech Center","operator_code":"1754","reported_value":180,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"12-2028","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Albany","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":64,"quantity_cell":"E64"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1754:summer","entity_name":"Kenwood Tech Center","operator_code":"1754","reported_value":180,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1754:winter","entity_name":"Kenwood Tech Center","operator_code":"1754","reported_value":180,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-nypa-row-415","subject_id":null,"entity_name":"Kyalami Data LLC / Lansing, NY","operator_code":null,"reported_value":2000.0,"reported_unit":"kW","kind":"public_power_allocation","scope":"customer","electrical_extent":"award_program_only","comparison":"exact","upper_value":null,"qualifier":"Recharge New York allocation, not utility service limit or facility design. Name-and-city discovery association only. Two Orangeburg allocation rows remain separate. No building match or sum assumed.","temporal_role":"allocation_as_reported","as_of":"2026-07-01","as_of_basis":"Row data_valid_as_of 7/1/2026.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://data.ny.gov/resource/mkqe-r4dx.json?$limit=50000","title":"nypa_dataset_rows","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:57:34.294195+00:00","sha256":"d22fdb16f42f9987df5576181905ce9d4153541952c2fc100a905229f6da5411","source_family":"public_registry","reuse_note":"public-record-facts"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-lanl-cooling","entity_name":"LANL SCC ECCCE","operator_code":null,"reported_value":33.2,"reported_unit":"MW_thermal","kind":"thermal_cooling_capacity","scope":"cooling_system","qualifier":"The engineer reports 33.2 MW of thermal cooling capacity. This is not electrical demand or facility power capacity.","comparison":null,"temporal_role":"dated_report","as_of":null,"as_of_basis":"The source does not provide a publication or observation date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://www.bpce.com/project/los-alamos-national-laboratory-strategic-computing-complex/","title":"www.bpce.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:56:58.896138+00:00","sha256":"aad0042bca03a08906cb1cf95fa4f1c88aaba1fcd7b5b61e7e25a9e4a527fd76","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-lanl-it","entity_name":"LANL Strategic Computing Complex","operator_code":null,"reported_value":7.1,"reported_unit":"MW","kind":"computational_equipment_power","scope":"computational_equipment_excludes_whole_facility","qualifier":"The historical report assigns 7.1 MW to secure computational equipment, expandable to 30 MW. It does not report inclusive facility input.","comparison":null,"temporal_role":"historical_design","as_of":"2007-03-28","as_of_basis":"March 28, 2007 publication cover. The attached draft is Version 4 dated March 17, 2007.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://www.osti.gov/servlets/purl/1036298","title":"www.osti.gov","pdf_page":15,"published":null,"retrieved_at":"2026-09-17T11:56:59.016592+00:00","sha256":"8eb727fa761731e5a00c0e69bb224d8228c70192eeab175021d58370ad1840e0","source_family":"public_registry","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-1:requested_load_mw:requested_total_project_load","entity_name":"LC24-1","operator_code":"LC24-1","reported_value":49.5,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"2028","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"Gilroy","point_of_interconnection":"Garlic","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":65,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-13:requested_load_mw:requested_total_project_load","entity_name":"LC24-13","operator_code":"LC24-13","reported_value":99.0,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"6/1/2026","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"San Jose","point_of_interconnection":"New Hellyer","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":62,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-14:requested_load_mw:requested_total_project_load","entity_name":"LC24-14","operator_code":"LC24-14","reported_value":99.0,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"4/1/2028","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"San Jose","point_of_interconnection":"New Hellyer","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":62,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-18:requested_load_mw:requested_total_project_load","entity_name":"LC24-18","operator_code":"LC24-18","reported_value":99.0,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"4/1/2028","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"Mission","point_of_interconnection":"Eastshore","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":66,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-2:requested_load_mw:requested_total_project_load","entity_name":"LC24-2","operator_code":"LC24-2","reported_value":49.0,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"6/1/2027","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"De Anza","point_of_interconnection":"Lockheed #1","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":61,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-24:requested_load_increment_mw:explicit_increment","entity_name":"LC24-24","operator_code":"LC24-24","reported_value":14.5,"reported_unit":"MW","kind":"requested_load_increment_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"explicit_increment","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"9/1/2026","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"Gilroy","point_of_interconnection":"Garlic","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":65,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-24:requested_load_mw:requested_total_project_load","entity_name":"LC24-24","operator_code":"LC24-24","reported_value":49.5,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"9/1/2026","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"Gilroy","point_of_interconnection":"Garlic","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":65,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-26:requested_load_mw:requested_total_project_load","entity_name":"LC24-26","operator_code":"LC24-26","reported_value":99.0,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"6/1/2029","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"San Jose","point_of_interconnection":"San Jose A","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":64,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-27:requested_load_mw:requested_total_project_load","entity_name":"LC24-27","operator_code":"LC24-27","reported_value":49.0,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"6/1/2028","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"San Jose","point_of_interconnection":"San Jose A","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":64,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-28:requested_load_mw:requested_total_project_load","entity_name":"LC24-28","operator_code":"LC24-28","reported_value":49.0,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"12/1/2027","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"San Jose","point_of_interconnection":"San Jose A","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":64,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-3:requested_load_mw:requested_total_project_load","entity_name":"LC24-3","operator_code":"LC24-3","reported_value":99.0,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"4/1/2028","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"San Jose","point_of_interconnection":"New Charcot near Trimble","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":63,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:LC24-6:requested_load_mw:requested_total_project_load","entity_name":"LC24-6","operator_code":"LC24-6","reported_value":99.0,"reported_unit":"MW","kind":"requested_load_mw","scope":"load_interconnection_project","qualifier":"PG&E labels Data Center Load. Requested utility load, not metered consumption, IT load or guaranteed service.","quantity_role":"requested_total_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"4/1/2028","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"Mission","point_of_interconnection":"Eastshore","grid_region":"CAISO"},"unresolved_conflicts":["Single or dual service describes connections, not a MW multiplier.","No customer or street address in this source. Electrical schematic is not a georeferenced building plan.","Requested ISD differs from capacity-upgrade ISD and does not prove operation."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":66,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-f9b624ae7745458ab2b4","entity_name":"Lafayette Data Center","operator_code":null,"reported_value":93.8,"reported_unit":"MW","kind":"facility_expected_demand","scope":"building","qualifier":"99.8 MW includes the 0.8 MW admin/PBB load; 93.8 MW is design at average conditions; 66 MW is critical IT. 99.0 MW describes the suites only.","temporal_role":"proposed","as_of":"2023-02-07","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Source separately labels 99.0 MW as building demand while 99.8 includes PBB. Confirm administration/PBB boundary before a whole-building scalar."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=248686&DocumentContentId=83199","title":"DR Revised Project Description - LBGF Part I *** This document is a duplicate of TN 248684 *** Project Description 42 page(s)","pdf_page":4,"published":"2023-02-07","retrieved_at":"2026-09-16T22:57:43.249820+00:00","sha256":"21fe23690bab544bd81d15e87ae22bc83db8700f22075a3f2e0e41aadd248395","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-4329b354a9b41c364403","entity_name":"Lafayette Data Center","operator_code":null,"reported_value":99.8,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"99.8 MW includes the 0.8 MW admin/PBB load; 93.8 MW is design at average conditions; 66 MW is critical IT. 99.0 MW describes the suites only.","temporal_role":"proposed","as_of":"2023-02-07","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Source separately labels 99.0 MW as building demand while 99.8 includes PBB. Confirm administration/PBB boundary before a whole-building scalar."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=248686&DocumentContentId=83199","title":"DR Revised Project Description - LBGF Part I *** This document is a duplicate of TN 248684 *** Project Description 42 page(s)","pdf_page":4,"published":"2023-02-07","retrieved_at":"2026-09-16T22:57:43.249820+00:00","sha256":"21fe23690bab544bd81d15e87ae22bc83db8700f22075a3f2e0e41aadd248395","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-6bb3c70251c6e0e2de1f","entity_name":"Lafayette Data Center","operator_code":null,"reported_value":66,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"99.8 MW includes the 0.8 MW admin/PBB load; 93.8 MW is design at average conditions; 66 MW is critical IT. 99.0 MW describes the suites only.","temporal_role":"proposed","as_of":"2023-02-07","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Source separately labels 99.0 MW as building demand while 99.8 includes PBB. Confirm administration/PBB boundary before a whole-building scalar."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=248686&DocumentContentId=83199","title":"DR Revised Project Description - LBGF Part I *** This document is a duplicate of TN 248684 *** Project Description 42 page(s)","pdf_page":4,"published":"2023-02-07","retrieved_at":"2026-09-16T22:57:43.249820+00:00","sha256":"21fe23690bab544bd81d15e87ae22bc83db8700f22075a3f2e0e41aadd248395","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-cb2-it-old","entity_name":"Lake Mariner CB-2","operator_code":null,"reported_value":40,"reported_unit":"MW","kind":"historical_it_conflict","scope":"named_building_prior_design","qualifier":"The May 2025 table reports 40 MW IT while its map labels 42 MW IT. The February 2026 release explicitly reports 42 MW for CB2.","comparison":null,"temporal_role":"dated_report","as_of":"2025-05-09","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["The May2025 table reports 40 MW IT and 50 MW gross. The map says 42 MW IT. February2026 explicitly reports 42 MW IT for CB2. Hold gross power. Do not calculate 52.5 MW from IT."],"sources":[{"url":"https://d1io3yog0oux5.cloudfront.net/_0c87b48cb4d1c6967968c7d0c3e5933d/terawulf/db/2396/23301/pdf/WULF_Q1_2025_Investor_Pres_vF.pdf","title":"d1io3yog0oux5.cloudfront.net","pdf_page":21,"published":null,"retrieved_at":"2026-09-17T12:02:17.890825+00:00","sha256":"1cecf5be9a637c6d72b56217e462e673a2495f1a46ea68feb5c384411538985f","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-cb2-gross-old","entity_name":"Lake Mariner CB-2","operator_code":null,"reported_value":50,"reported_unit":"MW","kind":"historical_proposed_gross_load","scope":"named_building_prior_design","qualifier":"The May 2025 table reports 50 MW gross and 40 MW IT. Its map instead labels 42 MW IT. The later 42 MW IT statement does not establish revised gross power.","comparison":null,"temporal_role":"dated_report","as_of":"2025-05-09","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["The May2025 table reports 40 MW IT and 50 MW gross. The map says 42 MW IT. February2026 explicitly reports 42 MW IT for CB2. Hold gross power. Do not calculate 52.5 MW from IT."],"sources":[{"url":"https://d1io3yog0oux5.cloudfront.net/_0c87b48cb4d1c6967968c7d0c3e5933d/terawulf/db/2396/23301/pdf/WULF_Q1_2025_Investor_Pres_vF.pdf","title":"d1io3yog0oux5.cloudfront.net","pdf_page":21,"published":null,"retrieved_at":"2026-09-17T12:02:17.890825+00:00","sha256":"1cecf5be9a637c6d72b56217e462e673a2495f1a46ea68feb5c384411538985f","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-cb4-it","entity_name":"Lake Mariner CB4","operator_code":null,"reported_value":168,"reported_unit":"MW","kind":"it_critical","scope":"named_building_current_plan_location_unresolved","qualifier":"The February 2026 release reports 168 MW critical IT for CB4. A revised labeled plan is needed before assigning this quantity to a physical building point.","comparison":null,"temporal_role":"dated_report","as_of":"2026-02-26","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000026/a_wulfearningsrelease2026-.htm","title":"investors.terawulf.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T12:00:36.510293+00:00","sha256":"791f1401ca42b31a9dde54b742981d9f461f475333d666cec502820f78c2c1ef","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-cb5-it","entity_name":"Lake Mariner CB5","operator_code":null,"reported_value":168,"reported_unit":"MW","kind":"it_critical","scope":"named_building_current_plan_location_unresolved","qualifier":"The February 2026 release reports 168 MW critical IT for CB5. A revised labeled plan is needed before assigning this quantity to a physical building point.","comparison":null,"temporal_role":"dated_report","as_of":"2026-02-26","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000026/a_wulfearningsrelease2026-.htm","title":"investors.terawulf.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T12:00:36.510293+00:00","sha256":"791f1401ca42b31a9dde54b742981d9f461f475333d666cec502820f78c2c1ef","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1670","entity_name":"Lake Mariner Data II","operator_code":"1670","reported_value":250,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Approved","generator_id":null,"proposed_date_native":"02-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Niagara","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":24,"quantity_cell":"E24"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1670:summer","entity_name":"Lake Mariner Data II","operator_code":"1670","reported_value":250,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jun-25","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1670:winter","entity_name":"Lake Mariner Data II","operator_code":"1670","reported_value":250,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jun-25","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-wulfden-gross","entity_name":"Lake Mariner WULF Den","operator_code":null,"reported_value":2.5,"reported_unit":"MW","kind":"proposed_gross_load","scope":"demonstration_unit_physical_extent_unresolved","qualifier":"The May 2025 table reports 2.5 MW gross for WULF Den. The plan does not resolve whether this is a container, hall or whole building.","comparison":null,"temporal_role":"dated_report","as_of":"2025-05-09","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://d1io3yog0oux5.cloudfront.net/_0c87b48cb4d1c6967968c7d0c3e5933d/terawulf/db/2396/23301/pdf/WULF_Q1_2025_Investor_Pres_vF.pdf","title":"d1io3yog0oux5.cloudfront.net","pdf_page":21,"published":null,"retrieved_at":"2026-09-17T12:02:17.890825+00:00","sha256":"1cecf5be9a637c6d72b56217e462e673a2495f1a46ea68feb5c384411538985f","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-6f7ea76ae3ce29846f92","entity_name":"Laurelwood Building 1","operator_code":null,"reported_value":49,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Approximately 49 MW per building is stated by the decision. Rounded source estimate, not a division of the 99 MW campus total.","temporal_role":"proposed","as_of":"2020-03-13","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=232394&DocumentContentId=64398","title":"efiling.energy.ca.gov","pdf_page":11,"published":"2020-03-13","retrieved_at":"2026-09-17T02:21:19.466585+00:00","sha256":"a404e0f5a4313f4cca38005e1645715965c25db241aed9d3d3bea328065f47b9","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-c29e8f80d76c980caccd","entity_name":"Laurelwood Building 2","operator_code":null,"reported_value":49,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Approximately 49 MW per building is stated by the decision. Rounded source estimate, not a division of the 99 MW campus total.","temporal_role":"proposed","as_of":"2020-03-13","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=232394&DocumentContentId=64398","title":"efiling.energy.ca.gov","pdf_page":11,"published":"2020-03-13","retrieved_at":"2026-09-17T02:21:19.466585+00:00","sha256":"a404e0f5a4313f4cca38005e1645715965c25db241aed9d3d3bea328065f47b9","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-d2121fa4715e45f8f777","entity_name":"Laurelwood Data Center campus","operator_code":null,"reported_value":99,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Regulator project description; proposal design quantity, not measured demand or current operating status","temporal_role":"proposed","as_of":null,"as_of_basis":"not established; retrieval is not publication","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/laurelwood-data-center","title":"Laurelwood Data Center | California Energy Commission","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:42:08.028451+00:00","sha256":"f3a9c2ac48c5e1d0f406a1f313896d2c6d2a8d3d760c81952515fa5c10dadbcb","source_family":"cec_project","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-b278cfa4af74b50f9b96","entity_name":"Laurelwood two-building campus","operator_code":null,"reported_value":99,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Explicit reported design value, not measured operation.","temporal_role":"proposed","as_of":"2020-03-13","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=232394&DocumentContentId=64398","title":"efiling.energy.ca.gov","pdf_page":10,"published":"2020-03-13","retrieved_at":"2026-09-17T02:21:19.466585+00:00","sha256":"a404e0f5a4313f4cca38005e1645715965c25db241aed9d3d3bea328065f47b9","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-4c609da8f2898a5b11c4","entity_name":"Lockhart Moore South Carolina data center request","operator_code":null,"reported_value":200,"reported_unit":"MW","kind":"requested_service","scope":"project","qualifier":"Proposed data center load in unexecuted NITSA filing; no customer identity or energization inferred","temporal_role":"proposed","as_of":"2025-10-07","as_of_basis":"Filing letter date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://dms.psc.sc.gov/Attachments/Matter/3e10165f-8b97-4aca-9878-31d3beb6ae71","title":"dms.psc.sc.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T01:44:01.388851+00:00","sha256":"9db6753556e46128758f57de9cce6b8585711b72f8e526cdef2c54663f5ab688","source_family":"puc_ferc","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power03::nfpr03-mdu-ellendale-increment-forecast","subject_id":null,"entity_name":"MDU additional Applied Digital incremental-load forecast","operator_code":null,"reported_value":50,"reported_unit":"MW","kind":"incremental_load_forecast","scope":"regional_project","electrical_extent":"additional_data_center_load","comparison":"exact","upper_value":null,"qualifier":"Additional 50 MW expected by the end of Q2 2026. Report known date is May 7; target period is separate. No claim the forecast occurred or that it maps to Polaris Forge 1.","temporal_role":"future_forecast","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/67716/000006771626000050/mdu-20260331.htm","title":"mdu-q1-2026","pdf_page":null,"published":"2026-05-07","retrieved_at":"2026-09-18T03:52:37.284129+00:00","sha256":"5fa3e9e1bd2ea6518ac86b1b52beaefdad0bf88a2ad9be48dde92a11ae1d3114","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Operating discussion, printed page 34: existing Ellendale and additional regional load","text_lines_1_based":[5102,5102],"text_character_span":[134400,135101],"normalized_text_character_span":[134394,135095]}],"text_sha256":"ef7d141b4673e59c6993e58ccfd6bc5792161e3a54ad5cc723e82632f4134dda","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-05-07","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-05-07","sec_filing_date":"2026-05-07","document_period_end":"2026-03-31","event_dates":[],"forecast_target_period":{"native":"by the end of the second quarter of 2026","end":"2026-06-30","role":"forecast_deadline_not_actual_or_as_of"},"non_additive_group":"mdu-historical-and-additional-load-no-sum","identity_state":"unresolved_no_record_association","correction_ids":["C04-mdu-report-event-forecast-date-separation"],"source_observation_id":"nfpr03-mdu-ellendale-increment-forecast","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-mdu-ellendale-additional-esa","subject_id":null,"entity_name":"MDU additional Applied Digital load in utility service territory","operator_code":null,"reported_value":350,"reported_unit":"MW","kind":"additional_service_agreement","scope":"regional_project","electrical_extent":"additional_regional_service_agreement","comparison":"exact","upper_value":null,"qualifier":"Additional 350 MW ESA approved by NDPSC; approval date and exact facility not stated in this passage. No allocation to Polaris Forge 1 or existing buildings.","temporal_role":"approved_agreement_reported_in_dated_filing","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/67716/000006771626000050/mdu-20260331.htm","title":"mdu-q1-2026","pdf_page":null,"published":"2026-05-07","retrieved_at":"2026-09-18T03:52:37.284129+00:00","sha256":"5fa3e9e1bd2ea6518ac86b1b52beaefdad0bf88a2ad9be48dde92a11ae1d3114","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Operating discussion, printed page 34: existing Ellendale and additional regional load","text_lines_1_based":[5102,5102],"text_character_span":[134400,135101],"normalized_text_character_span":[134394,135095]}],"text_sha256":"ef7d141b4673e59c6993e58ccfd6bc5792161e3a54ad5cc723e82632f4134dda","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-05-07","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-05-07","sec_filing_date":"2026-05-07","document_period_end":"2026-03-31","event_dates":[],"forecast_target_period":null,"non_additive_group":"mdu-historical-and-additional-load-no-sum","identity_state":"unresolved_no_record_association","correction_ids":["C04-mdu-report-event-forecast-date-separation"],"source_observation_id":"nfpr03-mdu-ellendale-additional-esa","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-mdu-ellendale-increment-online","subject_id":null,"entity_name":"MDU incremental Applied Digital load, facility unresolved","operator_code":null,"reported_value":50,"reported_unit":"MW","kind":"incremental_load_online","scope":"regional_project","electrical_extent":"additional_data_center_load","comparison":"approximately","upper_value":null,"qualifier":"Approximately 50 MW reported currently online in a filing dated May 7. The passage gives no quantity effective date; March 31 quarter end is not assigned. This is part of incremental regional load, not a separately additive building value.","temporal_role":"online_increment_reported_at_unspecified_effective_date","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/67716/000006771626000050/mdu-20260331.htm","title":"mdu-q1-2026","pdf_page":null,"published":"2026-05-07","retrieved_at":"2026-09-18T03:52:37.284129+00:00","sha256":"5fa3e9e1bd2ea6518ac86b1b52beaefdad0bf88a2ad9be48dde92a11ae1d3114","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Operating discussion, printed page 34: existing Ellendale and additional regional load","text_lines_1_based":[5102,5102],"text_character_span":[134400,135101],"normalized_text_character_span":[134394,135095]}],"text_sha256":"ef7d141b4673e59c6993e58ccfd6bc5792161e3a54ad5cc723e82632f4134dda","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-05-07","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-05-07","sec_filing_date":"2026-05-07","document_period_end":"2026-03-31","event_dates":[],"forecast_target_period":null,"non_additive_group":"mdu-historical-and-additional-load-no-sum","identity_state":"unresolved_no_record_association","correction_ids":["C04-mdu-report-event-forecast-date-separation"],"source_observation_id":"nfpr03-mdu-ellendale-increment-online","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"pnfr07::context-mghpcc-it","entity_name":"MGHPCC","operator_code":null,"reported_value":10,"reported_unit":"MW","kind":"it_computing_allocation","scope":"building_computing_allocation","qualifier":"Undated MIT documentation assigns 10 MW to computing. The later Project Olympia article has an unresolved tenant boundary, so current building IT capacity remains unknown.","comparison":null,"temporal_role":"dated_report","as_of":null,"as_of_basis":"The source does not provide a publication or observation date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Retain 15 MW only as the dated 2013 facility capacity. Withhold current capacity and undated 10 MW IT. The Summer2026 Project Olympia article says the building can supply 2.5 MW, but tenant versus whole-building scope is unresolved. The parent review retained this distinction."],"sources":[{"url":"https://tig.csail.mit.edu/hardware/mghpcc/","title":"tig.csail.mit.edu","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:56:58.074613+00:00","sha256":"97dc3143a0c647011f7d2b38be16fb3c019005b4f14d0a26d4672b9008505a5d","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-mghpcc-utility","entity_name":"MGHPCC","operator_code":null,"reported_value":15,"reported_unit":"MW","kind":"utility_service_connection","scope":"whole_building_service","qualifier":"Undated MIT documentation reports a 15 MW utility connection. It does not establish present consumption.","comparison":null,"temporal_role":"dated_report","as_of":null,"as_of_basis":"The source does not provide a publication or observation date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Retain 15 MW only as the dated 2013 facility capacity. Withhold current capacity and undated 10 MW IT. The Summer2026 Project Olympia article says the building can supply 2.5 MW, but tenant versus whole-building scope is unresolved. The parent review retained this distinction."],"sources":[{"url":"https://tig.csail.mit.edu/hardware/mghpcc/","title":"tig.csail.mit.edu","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:56:58.074613+00:00","sha256":"97dc3143a0c647011f7d2b38be16fb3c019005b4f14d0a26d4672b9008505a5d","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-mghpcc-olympia-actual","entity_name":"MIT Project Olympia at MGHPCC","operator_code":null,"reported_value":1.2,"reported_unit":"MW","kind":"reported_actual_demand","scope":"tenant_or_building_extent_unresolved","qualifier":"The Summer 2026 article reports about 1.2 MW of consumption. It discusses MIT resources at MGHPCC without clearly defining the electrical boundary.","comparison":"approximately","temporal_role":"reported_actual","as_of":"2026","as_of_basis":"Summer 2026 issue. A calendar day is not stated.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Retain 15 MW only as the dated 2013 facility capacity. Withhold current capacity and undated 10 MW IT. The Summer2026 Project Olympia article says the building can supply 2.5 MW, but tenant versus whole-building scope is unresolved. The parent review retained this distinction."],"sources":[{"url":"https://betterworld.mit.edu/spectrum/issues/summer-2026/more-power-to-every-researcher/","title":"betterworld.mit.edu","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T12:01:26.888426+00:00","sha256":"1e0fd025245265390df06b3a01eb3b71c4aab28201879fe64c90227a93ae6f45","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-mghpcc-olympia-capability","entity_name":"MIT Project Olympia at MGHPCC","operator_code":null,"reported_value":2.5,"reported_unit":"MW","kind":"scope_ambiguous_capability","scope":"tenant_or_building_extent_unresolved","qualifier":"The Summer 2026 article says the building can provide up to about 2.5 MW, while discussing MIT resources. Tenant and whole-building scope remain unresolved.","comparison":"up_to_approximately","temporal_role":"dated_report","as_of":"2026","as_of_basis":"Summer 2026 issue. A calendar day is not stated.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Retain 15 MW only as the dated 2013 facility capacity. Withhold current capacity and undated 10 MW IT. The Summer2026 Project Olympia article says the building can supply 2.5 MW, but tenant versus whole-building scope is unresolved. The parent review retained this distinction."],"sources":[{"url":"https://betterworld.mit.edu/spectrum/issues/summer-2026/more-power-to-every-researcher/","title":"betterworld.mit.edu","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T12:01:26.888426+00:00","sha256":"1e0fd025245265390df06b3a01eb3b71c4aab28201879fe64c90227a93ae6f45","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-800c353724c670d7fe22","entity_name":"Martin Data Center","operator_code":null,"reported_value":80.7,"reported_unit":"MW","kind":"facility_expected_demand","scope":"building","qualifier":"Source explicitly reports this quantity in the design/PUE paragraph; no calculated PUE or utilization adjustment. Average ambient conditions at design IT load.","temporal_role":"proposed","as_of":"2024-05-29","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=256587&DocumentContentId=92396","title":"Martin Backup Generating Facility Final Environmental Impact Report 520 page(s)","pdf_page":34,"published":"2024-05-29","retrieved_at":"2026-09-16T22:55:32.516032+00:00","sha256":"78dc2c7cde21180f71eece2b5d299f37109b50c8df0803e074b0d483b4b3c885","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-b182952c4da1e83956ae","entity_name":"Martin Data Center","operator_code":null,"reported_value":92.8,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Source explicitly reports this quantity in the design/PUE paragraph; no calculated PUE or utilization adjustment. ","temporal_role":"proposed","as_of":"2024-05-29","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=256587&DocumentContentId=92396","title":"Martin Backup Generating Facility Final Environmental Impact Report 520 page(s)","pdf_page":34,"published":"2024-05-29","retrieved_at":"2026-09-16T22:55:32.516032+00:00","sha256":"78dc2c7cde21180f71eece2b5d299f37109b50c8df0803e074b0d483b4b3c885","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-c8a16f4de082ce527ed7","entity_name":"Martin Data Center","operator_code":null,"reported_value":64,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Source explicitly reports this quantity in the design/PUE paragraph; no calculated PUE or utilization adjustment. ","temporal_role":"proposed","as_of":"2024-05-29","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=256587&DocumentContentId=92396","title":"Martin Backup Generating Facility Final Environmental Impact Report 520 page(s)","pdf_page":34,"published":"2024-05-29","retrieved_at":"2026-09-16T22:55:32.516032+00:00","sha256":"78dc2c7cde21180f71eece2b5d299f37109b50c8df0803e074b0d483b4b3c885","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1751","entity_name":"Massena Development LLC Power Allocation","operator_code":"1751","reported_value":200,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"03-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St; Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":61,"quantity_cell":"E61"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-b0e1b45c1241314199db","entity_name":"McLaren three-building campus","operator_code":null,"reported_value":98.67,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"CEC accepts applicant worst-case-day full-customer-load estimate. No per-building allocation.","temporal_role":"proposed","as_of":"2018-11-27","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=225970&DocumentContentId=56662","title":"efiling.energy.ca.gov","pdf_page":14,"published":"2018-11-27","retrieved_at":"2026-09-17T02:21:06.597093+00:00","sha256":"79eed06b8b4f6b79a0bcbc0ad46a7c3ba2428380af84077d5e92bc8c8b06a66f","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:05","entity_name":"Meta / Jeffersonville, Indiana","operator_code":null,"reported_value":200,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2026","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":1,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:07","entity_name":"Meta / Lebanon, IN","operator_code":null,"reported_value":1540,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"TBA","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:02","entity_name":"Meta / Richland Parish, LA","operator_code":null,"reported_value":2600,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"TBA","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":1,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:11","entity_name":"Meta / Rosemont, Minnesota","operator_code":null,"reported_value":308,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2026","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:19","entity_name":"Microsoft (Project Ginger East) / West Des Moines, IA","operator_code":null,"reported_value":444,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2025-2027","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:20","entity_name":"Microsoft (Project Ginger West) / West Des Moines, IA","operator_code":null,"reported_value":207,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"existing_and_expansion_boundary_unspecified","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"existing_and_expansion_boundary_unspecified","generator_id":null,"proposed_date_native":"Existing + Expansion Opening in 2026","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:18","entity_name":"Microsoft (Project Osmium) / West Des Moines, IA","operator_code":null,"reported_value":150,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2025","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:17","entity_name":"Microsoft (Project Ruthenium) / West Des Moines, IA","operator_code":null,"reported_value":113,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2026","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:21","entity_name":"Microsoft (Project Van Meter) / Van Meter, IA","operator_code":null,"reported_value":415,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"TBD","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:12","entity_name":"Microsoft / Becker, Minnesota","operator_code":null,"reported_value":325,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2026","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:15","entity_name":"Microsoft / Mount Pleasant, WI","operator_code":null,"reported_value":1480,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2026","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl01-it_mw","entity_name":"Microsoft LVL01, historical LVL - Prison table","operator_code":"LVL01","reported_value":41.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl01-utility_mw","entity_name":"Microsoft LVL01, historical LVL - Prison table","operator_code":"LVL01","reported_value":35.9,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl01-it_mw","entity_name":"Microsoft LVL01, historical LVL - Timber table","operator_code":"LVL01","reported_value":48.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl01-utility_mw","entity_name":"Microsoft LVL01, historical LVL - Timber table","operator_code":"LVL01","reported_value":60.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl02-it_mw","entity_name":"Microsoft LVL02, historical LVL - Prison table","operator_code":"LVL02","reported_value":41.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl02-utility_mw","entity_name":"Microsoft LVL02, historical LVL - Prison table","operator_code":"LVL02","reported_value":35.9,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl02-it_mw","entity_name":"Microsoft LVL02, historical LVL - Timber table","operator_code":"LVL02","reported_value":48.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl02-utility_mw","entity_name":"Microsoft LVL02, historical LVL - Timber table","operator_code":"LVL02","reported_value":60.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl03-it_mw","entity_name":"Microsoft LVL03, historical LVL - Prison table","operator_code":"LVL03","reported_value":41.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl03-utility_mw","entity_name":"Microsoft LVL03, historical LVL - Prison table","operator_code":"LVL03","reported_value":35.9,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl03-it_mw","entity_name":"Microsoft LVL03, historical LVL - Timber table","operator_code":"LVL03","reported_value":48.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl03-utility_mw","entity_name":"Microsoft LVL03, historical LVL - Timber table","operator_code":"LVL03","reported_value":60.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl04-it_mw","entity_name":"Microsoft LVL04, historical LVL - Prison table","operator_code":"LVL04","reported_value":41.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl04-utility_mw","entity_name":"Microsoft LVL04, historical LVL - Prison table","operator_code":"LVL04","reported_value":35.9,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl04-it_mw","entity_name":"Microsoft LVL04, historical LVL - Timber table","operator_code":"LVL04","reported_value":48.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl04-utility_mw","entity_name":"Microsoft LVL04, historical LVL - Timber table","operator_code":"LVL04","reported_value":60.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl05-it_mw","entity_name":"Microsoft LVL05, historical LVL - Prison table","operator_code":"LVL05","reported_value":41.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl05-utility_mw","entity_name":"Microsoft LVL05, historical LVL - Prison table","operator_code":"LVL05","reported_value":35.9,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl05-it_mw","entity_name":"Microsoft LVL05, historical LVL - Timber table","operator_code":"LVL05","reported_value":48.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl05-utility_mw","entity_name":"Microsoft LVL05, historical LVL - Timber table","operator_code":"LVL05","reported_value":60.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl06-it_mw","entity_name":"Microsoft LVL06, historical LVL - Prison table","operator_code":"LVL06","reported_value":41.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl06-utility_mw","entity_name":"Microsoft LVL06, historical LVL - Prison table","operator_code":"LVL06","reported_value":35.9,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl06-it_mw","entity_name":"Microsoft LVL06, historical LVL - Timber table","operator_code":"LVL06","reported_value":48.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl06-utility_mw","entity_name":"Microsoft LVL06, historical LVL - Timber table","operator_code":"LVL06","reported_value":60.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl07-it_mw","entity_name":"Microsoft LVL07, historical LVL - Prison table","operator_code":"LVL07","reported_value":41.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p39-lvl07-utility_mw","entity_name":"Microsoft LVL07, historical LVL - Prison table","operator_code":"LVL07","reported_value":35.9,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 70% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates.","The source notes above the first and third IT columns contain question marks. Their design inputs remain uncertain."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":39,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl07-it_mw","entity_name":"Microsoft LVL07, historical LVL - Timber table","operator_code":"LVL07","reported_value":48.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p42-lvl07-utility_mw","entity_name":"Microsoft LVL07, historical LVL - Timber table","operator_code":"LVL07","reported_value":60.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Page 42 repeats LVL1-LVL7 under a Timber title; page 36 associates both a tables with Cloud. DEQ locates LVL01-LVL07 at Prison and LVL08-LVL14 at Timber. Do not silently relabel or select 41 versus 48 IT. Utility inputs are modeled forecasts, not full design, contracts, or measured demand.","The source template uses 100% utilization and 1.25 PUE. Every column has explicit inputs These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":42,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p45-lvl08-it_mw","entity_name":"Microsoft LVL08, historical load table","operator_code":"LVL08","reported_value":48.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Utility load template explicitly reports the quantity with utilization/PUE assumptions. It is not maximum facility electrical design. Only the first IT cell is populated. The 2021 physical plan and later county code/address records require currentness reconciliation.","The source template uses 70% utilization and 1.25 PUE. Inputs are populated in the first building column only; blank inputs in later columns are not filled. These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":45,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p45-lvl08-utility_mw","entity_name":"Microsoft LVL08, historical load table","operator_code":"LVL08","reported_value":42.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Utility load template explicitly reports the quantity with utilization/PUE assumptions. It is not maximum facility electrical design. Only the first IT cell is populated. The 2021 physical plan and later county code/address records require currentness reconciliation.","The source template uses 70% utilization and 1.25 PUE. Inputs are populated in the first building column only; blank inputs in later columns are not filled. These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":45,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p45-lvl09-utility_mw","entity_name":"Microsoft LVL09, historical load table","operator_code":"LVL09","reported_value":42.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Utility load template explicitly reports the quantity with utilization/PUE assumptions. It is not maximum facility electrical design. Only the first IT cell is populated. The 2021 physical plan and later county code/address records require currentness reconciliation.","The source template uses 70% utilization and 1.25 PUE. Inputs are populated in the first building column only; blank inputs in later columns are not filled. These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":45,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p45-lvl10-utility_mw","entity_name":"Microsoft LVL10, historical load table","operator_code":"LVL10","reported_value":42.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Utility load template explicitly reports the quantity with utilization/PUE assumptions. It is not maximum facility electrical design. Only the first IT cell is populated. The 2021 physical plan and later county code/address records require currentness reconciliation.","The source template uses 70% utilization and 1.25 PUE. Inputs are populated in the first building column only; blank inputs in later columns are not filled. These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":45,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p45-lvl11-utility_mw","entity_name":"Microsoft LVL11, historical load table","operator_code":"LVL11","reported_value":42.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Utility load template explicitly reports the quantity with utilization/PUE assumptions. It is not maximum facility electrical design. Only the first IT cell is populated. The 2021 physical plan and later county code/address records require currentness reconciliation.","The source template uses 70% utilization and 1.25 PUE. Inputs are populated in the first building column only; blank inputs in later columns are not filled. These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":45,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p47-lvl12-it_mw","entity_name":"Microsoft LVL12, historical load table","operator_code":"LVL12","reported_value":48.0,"reported_unit":"MW","kind":"it_design_input","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Max Design IT MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Utility load template explicitly reports the quantity with utilization/PUE assumptions. It is not maximum facility electrical design. Only the first IT cell is populated. The 2021 physical plan and later county code/address records require currentness reconciliation.","The source template uses 70% utilization and 1.25 PUE. Inputs are populated in the first building column only; blank inputs in later columns are not filled. These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":47,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p47-lvl12-utility_mw","entity_name":"Microsoft LVL12, historical load table","operator_code":"LVL12","reported_value":42.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Utility load template explicitly reports the quantity with utilization/PUE assumptions. It is not maximum facility electrical design. Only the first IT cell is populated. The 2021 physical plan and later county code/address records require currentness reconciliation.","The source template uses 70% utilization and 1.25 PUE. Inputs are populated in the first building column only; blank inputs in later columns are not filled. These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":47,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p47-lvl13-utility_mw","entity_name":"Microsoft LVL13, historical load table","operator_code":"LVL13","reported_value":42.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Utility load template explicitly reports the quantity with utilization/PUE assumptions. It is not maximum facility electrical design. Only the first IT cell is populated. The 2021 physical plan and later county code/address records require currentness reconciliation.","The source template uses 70% utilization and 1.25 PUE. Inputs are populated in the first building column only; blank inputs in later columns are not filled. These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":47,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"va-hyp2-p47-lvl14-utility_mw","entity_name":"Microsoft LVL14, historical load table","operator_code":"LVL14","reported_value":42.0,"reported_unit":"MW","kind":"utility_load_forecast","scope":"named_building_code_in_historical_load_template","qualifier":"Printed Utility MW entry in a 2021 planning template. Current building assignment and delivery remain unverified.","comparison":null,"temporal_role":"historical_load_template","as_of":"2021-06-30","as_of_basis":"utility_application_filing_date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Utility load template explicitly reports the quantity with utilization/PUE assumptions. It is not maximum facility electrical design. Only the first IT cell is populated. The 2021 physical plan and later county code/address records require currentness reconciliation.","The source template uses 70% utilization and 1.25 PUE. Inputs are populated in the first building column only; blank inputs in later columns are not filled. These are source assumptions, not InfraMap estimates."],"sources":[{"url":"https://www.dominionenergy.com/-/media/content/about/power-line-projects/chase-city-to-cloud/pdfs/line-235-extension-application-volume-1-of-2.pdf","title":"www.dominionenergy.com","pdf_page":47,"published":null,"retrieved_at":"2026-09-17T11:14:05.351321+00:00","sha256":"f989a34eb811166c265e7cfeffb5d17f901ded963bb78c9a4741e22b43f351b1","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-fccca8e8279d96d2694a","entity_name":"Microsoft Malaga campus","operator_code":null,"reported_value":18,"reported_unit":"MW","kind":"contracted_service","scope":"campus","qualifier":"Up to 18 MW surplus hydroelectric power under five-month contract beginning August 2025. IRP is marked DRAFT. 2026-2040 supply explicitly undetermined; not building design or current service.","temporal_role":"historical","as_of":null,"as_of_basis":"Undated draft 2025 IRP; August 2025 contract start is explicit in body, not publication date.","period_start":"2025-08-01","period_end":"2025-12-31","measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.chelanpud.org/docs/default-source/default-document-library/irp-2025-book-web0addbfaf9dd5636da1c4ff0800ce4554.pdf","title":"www.chelanpud.org","pdf_page":58,"published":null,"retrieved_at":"2026-09-17T02:21:08.998665+00:00","sha256":"f31d6f3a6dfbc579624d6c3da97d59124a69035628e13c68a6a85078cd826d02","source_family":"municipal_utility","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-1e00267c43db2041da3e","entity_name":"Microsoft SJ04","operator_code":null,"reported_value":48.5,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Each building has an explicitly stated 48.5 MW maximum; separate storage-tank 0.8 MW is excluded.","temporal_role":"proposed","as_of":"2025-07-14","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264764&DocumentContentId=101543","title":"Microsoft Fourth Revised Project Description - SJ04 Project Description 49 page(s)","pdf_page":7,"published":"2025-07-14","retrieved_at":"2026-09-16T22:55:43.796516+00:00","sha256":"563f388083b5531f22c3bfcfdd182212e3452fae97a1888d3d8ce5467bbbc182","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-cb3afd9a3255aad040d9","entity_name":"Microsoft SJ04/SJ06 campus","operator_code":null,"reported_value":92.2,"reported_unit":"MW","kind":"facility_expected_demand","scope":"campus","qualifier":"Two-building combined total; 97.8 MW includes 0.8 MW storage-tank area. No IT allocation to individual buildings.","temporal_role":"proposed","as_of":"2025-07-14","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264764&DocumentContentId=101543","title":"Microsoft Fourth Revised Project Description - SJ04 Project Description 49 page(s)","pdf_page":10,"published":"2025-07-14","retrieved_at":"2026-09-16T22:55:43.796516+00:00","sha256":"563f388083b5531f22c3bfcfdd182212e3452fae97a1888d3d8ce5467bbbc182","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-d0f39ad7db15a6449c04","entity_name":"Microsoft SJ04/SJ06 campus","operator_code":null,"reported_value":97.8,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Two-building combined total; 97.8 MW includes 0.8 MW storage-tank area. No IT allocation to individual buildings.","temporal_role":"proposed","as_of":"2025-07-14","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264764&DocumentContentId=101543","title":"Microsoft Fourth Revised Project Description - SJ04 Project Description 49 page(s)","pdf_page":10,"published":"2025-07-14","retrieved_at":"2026-09-16T22:55:43.796516+00:00","sha256":"563f388083b5531f22c3bfcfdd182212e3452fae97a1888d3d8ce5467bbbc182","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-f48bbc2245ff49d69659","entity_name":"Microsoft SJ04/SJ06 campus","operator_code":null,"reported_value":76.8,"reported_unit":"MW","kind":"it_critical","scope":"campus","qualifier":"Two-building combined total; 97.8 MW includes 0.8 MW storage-tank area. No IT allocation to individual buildings.","temporal_role":"proposed","as_of":"2025-07-14","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264764&DocumentContentId=101543","title":"Microsoft Fourth Revised Project Description - SJ04 Project Description 49 page(s)","pdf_page":10,"published":"2025-07-14","retrieved_at":"2026-09-16T22:55:43.796516+00:00","sha256":"563f388083b5531f22c3bfcfdd182212e3452fae97a1888d3d8ce5467bbbc182","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-79365062ba7260d9c493","entity_name":"Microsoft SJ06","operator_code":null,"reported_value":48.5,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Each building has an explicitly stated 48.5 MW maximum; separate storage-tank 0.8 MW is excluded.","temporal_role":"proposed","as_of":"2025-07-14","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264764&DocumentContentId=101543","title":"Microsoft Fourth Revised Project Description - SJ04 Project Description 49 page(s)","pdf_page":7,"published":"2025-07-14","retrieved_at":"2026-09-16T22:55:43.796516+00:00","sha256":"563f388083b5531f22c3bfcfdd182212e3452fae97a1888d3d8ce5467bbbc182","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-017a40e9e19e19306dff","entity_name":"Microsoft San Jose Alviso campus","operator_code":null,"reported_value":77,"reported_unit":"MW","kind":"facility_expected_demand","scope":"campus","qualifier":"Regulator project description; proposal design quantity, not measured demand or current operating status","temporal_role":"proposed","as_of":null,"as_of_basis":"not established; retrieval is not publication","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/san-jose-data-center","title":"San Jose Data Center | California Energy Commission","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:42:09.615651+00:00","sha256":"4b7046d52608545a10c648451a3f664dc25d884f27e3949537999789a45400a6","source_family":"cec_project","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-59e0e5d6845923f0806e","entity_name":"Microsoft San Jose Alviso campus","operator_code":null,"reported_value":99,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Regulator project description; proposal design quantity, not measured demand or current operating status","temporal_role":"proposed","as_of":null,"as_of_basis":"not established; retrieval is not publication","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/san-jose-data-center","title":"San Jose Data Center | California Energy Commission","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:42:09.615651+00:00","sha256":"4b7046d52608545a10c648451a3f664dc25d884f27e3949537999789a45400a6","source_family":"cec_project","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-391ce977edf7dd7c6963","entity_name":"Microsoft San Jose SJDC04 campus","operator_code":null,"reported_value":97.8,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Regulator project description; proposal design quantity, not measured demand or current operating status","temporal_role":"proposed","as_of":null,"as_of_basis":"not established; retrieval is not publication","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/san-jose-data-center-04","title":"San José Data Center 04 | California Energy Commission","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:42:09.604934+00:00","sha256":"19d3d5c240755c95c74e24398ee3fb8fdc941e1454a693021dfb77492542f88a","source_family":"cec_project","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:09","entity_name":"Microsoft* / LaPorte, Indiana","operator_code":null,"reported_value":538,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"2032","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-5aa1f051ef1269dec249","entity_name":"Mission College two-building campus","operator_code":null,"reported_value":78.1,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Combined maximum electrical load of both buildings, including IT, cooling and general loads.","temporal_role":"proposed","as_of":"2020-08-21","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=234401&DocumentContentId=67270","title":"efiling.energy.ca.gov","pdf_page":10,"published":"2020-08-21","retrieved_at":"2026-09-17T02:20:33.664565+00:00","sha256":"5809c0ad5d425535632bd788e30fb2212acfe57bf4c28c9715b1f89136b61465","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0032:1","entity_name":"Mudd Tavern Caroline REC","operator_code":"DOM-2025-0032","reported_value":300,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"expected load","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested 2029-08-01. Physical PDF page 3.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-12---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":3,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:48.584148+00:00","sha256":"0a3e8e293f93818b642ef4587cd826eb7c1debcc432444a96a2b75a74e49c732","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-nasa-service","entity_name":"NASA NCCIPS","operator_code":null,"reported_value":32,"reported_unit":"MVA","kind":"utility_apparent_power_capacity","scope":"multi_tenant_complex","qualifier":"NASA reports 32 MVA of commercial power capacity for a complex with multiple tenants. No conversion to MW or allocation to buildings is made.","comparison":null,"temporal_role":"reported_capacity","as_of":null,"as_of_basis":"The source does not provide a publication or observation date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://www.nasa.gov/centers-and-facilities/nssc/nccips/","title":"www.nasa.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:58:51.659916+00:00","sha256":"816935e14140872aba83d35e5f66c5588fd2521d097b5d01143ce0c1dac95623","source_family":"public_registry","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-ncsa-feed","entity_name":"NCSA NPCF","operator_code":null,"reported_value":24,"reported_unit":"MW","kind":"initial_utility_feed_capacity","scope":"named_building_service","qualifier":"The presentation explicitly reports 24 MW of initial utility feeds, with backup listed separately. The 8 MW backup must not be added to the utility supply.","comparison":null,"temporal_role":"dated_report","as_of":null,"as_of_basis":"The source does not provide a publication or observation date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://wgropp.cs.illinois.edu/bib/talks/tdata/2010/scalableClusters.pdf","title":"wgropp.cs.illinois.edu","pdf_page":18,"published":null,"retrieved_at":"2026-09-17T11:56:06.070381+00:00","sha256":"0d8cd8219d8349b1671bd4923f54b788249b8d3c11b1a50966c98ad6952aeb3e","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-ncsa-25","entity_name":"NCSA NPCF","operator_code":null,"reported_value":25,"reported_unit":"MW","kind":"untyped_power_capacity","scope":"named_building_extent_hold","qualifier":"An undated presentation reports 25 MW without defining the electrical basis. A different presentation reports 24 MW of initial feeds.","comparison":null,"temporal_role":"dated_report","as_of":null,"as_of_basis":"The source does not provide a publication or observation date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://ml4i.llnl.gov/file-download/download/public/191","title":"ml4i.llnl.gov","pdf_page":11,"published":null,"retrieved_at":"2026-09-17T12:01:26.897159+00:00","sha256":"ae13ed3ee4caea864a6dde8364d9b6d54daa660f78d603e6aa293d08896e1423","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-1b80720d958c30464d78","entity_name":"NIPSCO Alphabet subsidiary contract","operator_code":null,"reported_value":300,"reported_unit":"MW","kind":"contracted_service","scope":"portfolio","qualifier":"Capacity commitment commencing 2030; contract pending IURC approval in source","temporal_role":"proposed","as_of":null,"as_of_basis":"not established","period_start":"2030-01-01","period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1111711/000111171126000045/nix-20260331.htm","title":"nix-20260331","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:44:00.668709+00:00","sha256":"94289b409aa2ac73f47568c2ab61dac1f2c6a342c3ea124b6c7284b7c587dcf2","source_family":"sec_utility","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-5b53616d5c13f21f2660","entity_name":"NIPSCO Amazon Data Services contract","operator_code":null,"reported_value":2400,"reported_unit":"MW","kind":"contracted_service","scope":"portfolio","qualifier":"Original maximum; March 2026 ramp acceleration did not raise maximum. Later amendment proposes 2800.","temporal_role":"historical","as_of":null,"as_of_basis":"not established","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1111711/000111171126000045/nix-20260331.htm","title":"nix-20260331","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:44:00.668709+00:00","sha256":"94289b409aa2ac73f47568c2ab61dac1f2c6a342c3ea124b6c7284b7c587dcf2","source_family":"sec_utility","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-7379a233b7e3e244b991","entity_name":"NIPSCO Amazon Data Services contract","operator_code":null,"reported_value":2800,"reported_unit":"MW","kind":"contracted_service","scope":"portfolio","qualifier":"March and May 2026 amendments; pending IURC and FERC approval in source. Maximum by end 2032.","temporal_role":"proposed","as_of":null,"as_of_basis":"not established","period_start":"2032-12-31","period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1111711/000111171126000045/nix-20260331.htm","title":"nix-20260331","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:44:00.668709+00:00","sha256":"94289b409aa2ac73f47568c2ab61dac1f2c6a342c3ea124b6c7284b7c587dcf2","source_family":"sec_utility","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-nrel-actual","entity_name":"NREL ESIF HPC data center","operator_code":null,"reported_value":1,"reported_unit":"MW","kind":"reported_actual_demand_upper_bound","scope":"hpc_portion_of_mixed_lab_building","qualifier":"The January 2018 report says the HPC data center needs strictly less than 1 MW to operate. This is an operating-demand bound, not installed capacity.","comparison":"strictly_less_than","temporal_role":"reported_actual","as_of":"2018-01","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://www.nlr.gov/docs/fy18osti/70567.pdf","title":"www.nlr.gov","pdf_page":34,"published":null,"retrieved_at":"2026-09-17T12:00:36.901594+00:00","sha256":"895205e35e356f57d6a4d9b8b654a3c2e3a607c53a94d2b5ac400800c56c82ba","source_family":"public_registry","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::ntt-va6","entity_name":"NTT Ashburn VA6 Data Center","operator_code":null,"reported_value":24,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Whole-building critical IT design capacity reported by the construction contractor. The same release says remaining capacity build-out continued through mid-2024; 24 MW is not claimed to be energized in August 2023. No opening date or status is imported.","comparison":null,"as_of":"2023-08-28","as_of_basis":"Explicit primary project contractor disclosure date","period_start":null,"period_end":null,"temporal_role":"dated_source_power_observation","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://www.clarkconstruction.com/news/clark-delivers-latest-ntt-data-center-ashburn","title":"www.clarkconstruction.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:42:01.531387+00:00","sha256":"44a871250b93ee24b1582ab4b0ac3a646885614a51037f4ccbbf7aa40b09a8cf","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://www.deq.virginia.gov/home/showpublisheddocument/25835/638880859260730000","title":"www.deq.virginia.gov","pdf_page":3,"published":null,"retrieved_at":"2026-09-16T22:42:02.634153+00:00","sha256":"2842833c51dfe81fef6ef1ac286ea31445826cb9be5285a5621fd8c99fee727a","source_family":"operator_or_project_contractor","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::ntt-house-backup-unit","entity_name":"NTT Hillsboro source 34-0235","operator_code":null,"reported_value":1500,"reported_unit":"kWe","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":1,"qualifier":"One proposed Kohler KD1500 unit. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Air report concerns the 47-acre property and a retained SunPower manufacturing tenancy. It lists 44 main units and one smaller unit. This does not establish the electrical boundary of the accepted HI1 building. No sum or IT estimate."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0235-ST-01_RR_2020.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-16T22:29:43.577759+00:00","sha256":"b0a94af387c4efecc900ce506b4cde09de72b2e90bd92c895024c007ec9dcb9b","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::ntt-main-backup-unit","entity_name":"NTT Hillsboro source 34-0235","operator_code":null,"reported_value":3250,"reported_unit":"kWe","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":44,"qualifier":"Forty-four proposed Kohler KD3250 units. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Air report concerns the 47-acre property and a retained SunPower manufacturing tenancy. It lists 44 main units and one smaller unit. This does not establish the electrical boundary of the accepted HI1 building. No sum or IT estimate."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0235-ST-01_RR_2020.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-16T22:29:43.577759+00:00","sha256":"b0a94af387c4efecc900ce506b4cde09de72b2e90bd92c895024c007ec9dcb9b","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1761","entity_name":"NYISO Load Interconnection Process - Data Center Inquiry","operator_code":"1761","reported_value":150,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Scoping Meeting Pending","generator_id":null,"proposed_date_native":"01-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Horseheads","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche.","source county field contains locality name"],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":71,"quantity_cell":"E71"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power02::nfpr02-dcr-lafayette-2021","subject_id":"dc-c800652d2639b20f","entity_name":"National facility power observation nfpr02-dcr-lafayette-2021","operator_code":null,"reported_value":6000,"reported_unit":"kW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Historical whole-building critical IT load. Parent review links the frozen source record to this existing building only. No current ownership, operator, developer, status, opening, name, address, alias, roof, or geometry conclusion follows from this historical observation.","temporal_role":"historical_design","as_of":"2021-08-24","as_of_basis":"DCR prospectus appraisal date for 3011 Lafayette Street.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_identity_resolved_historical_observation","scalar_eligible":true,"selected_field":"capacity.it_mw","unresolved_conflicts":[],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://links.sgx.com/FileOpen/Digital_Core_REIT_Prospectus_(29_Nov_2021).ashx?App=IPO&FileID=6328","title":"dcr-ipo","pdf_page":475,"published":null,"retrieved_at":"2026-09-17T23:53:36.065797+00:00","sha256":"0bd9f2b1c1114238b680250b47590b6a8cfa736fc75905144e3191b9c7ba69f0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"source_qualifier":"Exact historical building statement. Parent must reconcile the current record name and operator association before any field import.","record_link":{"record_id":"dc-c800652d2639b20f","identity_action":"reuse_existing_exact_building_identity","roof_geometry_sha256":"644d1d0c4261e7de8bdda9842b13ab2fc634d5ec29be74dabb6faf61ffd20ef0","new_canonical_identity_decisions":0,"new_map_hosts":0,"new_roofs":0},"selected_field_meaning":{"field":"capacity.it_mw","normalized_value":6.0,"normalized_unit":"MW","basis":"reported_critical_it_capacity","scope":"building","as_of":"2021-08-24","source_page":475,"related_selected_area_field":{"field":"building_sqft","value":90780,"unit":"sqft","basis":"reported_gross_floor_area","scope":"building","as_of":"2021-08-24","source_page":475}},"parent_review_holds":["2025Lafayette5.4MWownershipweightedquantity remainsheld; noownershipdivision.","No currentownership/operator/developer/status/openingdate inferred.","No geometry,address,name,alias orstableIDchanges.","Openingcannotbeinferredfromconstructionorrenovation. Lafayette2000/2007 vs2001/2008 sourceconflictretained.","Nativecountyparcelrecords carryunknown effective dates. Servicemodifieddate notparceldate."]},{"id":"national-power02::nfpr02-dcr-lafayette-2025-ownership","subject_id":"dc-c800652d2639b20f","entity_name":"National facility power observation nfpr02-dcr-lafayette-2025-ownership","operator_code":null,"reported_value":5400,"reported_unit":"kW","kind":"customer_it_load_ownership_weighted","scope":"ownership_interest","electrical_extent":"customer_load_based_on_ownership_interest","comparison":"exact","upper_value":null,"qualifier":"Ownership-weighted customer IT load. Do not divide by 90 percent or promote it to whole-building capacity.","temporal_role":"reported_capacity","as_of":"2025-12-31","as_of_basis":"DCR Annual Report 2025 table explicitly reports the ownership basis as at 31 December 2025.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_catalog_hold","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Ownership-weighted customer IT load. Do not divide by 90 percent or promote it to whole-building capacity."],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","title":"dcr-2025","pdf_page":46,"published":null,"retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power02::nfpr02-dcr-spacepark-2021","subject_id":"dc-87f7bed56998f892","entity_name":"National facility power observation nfpr02-dcr-spacepark-2021","operator_code":null,"reported_value":4900,"reported_unit":"kW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Historical Critical IT Load. It does not establish current demand, energization, or current operator identity.","temporal_role":"historical_design","as_of":"2021-09-08","as_of_basis":"DCR prospectus table inspection date and 1500 Space Park appraisal date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"accepted_observation_preview","scalar_eligible":true,"selected_field":null,"unresolved_conflicts":["The saved parent review selected this sole historical IT observation."],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://links.sgx.com/FileOpen/Digital_Core_REIT_Prospectus_(29_Nov_2021).ashx?App=IPO&FileID=6328","title":"dcr-ipo","pdf_page":462,"published":null,"retrieved_at":"2026-09-17T23:53:36.065797+00:00","sha256":"0bd9f2b1c1114238b680250b47590b6a8cfa736fc75905144e3191b9c7ba69f0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power02::nfpr02-dcr-walsh-2401-2021","subject_id":"dc-c6cb3ec097761c5e","entity_name":"National facility power observation nfpr02-dcr-walsh-2401-2021","operator_code":null,"reported_value":4000,"reported_unit":"kW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Historical whole-building critical IT load. Parent review links the frozen source record to this existing building only. No current ownership, operator, developer, status, opening, name, address, alias, roof, or geometry conclusion follows from this historical observation.","temporal_role":"historical_design","as_of":"2021-09-09","as_of_basis":"DCR prospectus table inspection date and 2401 Walsh appraisal date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_identity_resolved_historical_observation","scalar_eligible":true,"selected_field":"capacity.it_mw","unresolved_conflicts":[],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://links.sgx.com/FileOpen/Digital_Core_REIT_Prospectus_(29_Nov_2021).ashx?App=IPO&FileID=6328","title":"dcr-ipo","pdf_page":462,"published":null,"retrieved_at":"2026-09-17T23:53:36.065797+00:00","sha256":"0bd9f2b1c1114238b680250b47590b6a8cfa736fc75905144e3191b9c7ba69f0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"source_qualifier":"Historical Critical IT Load. The certificate isolates parcel 216-28-127 and excludes adjacent parcel 216-28-126.","record_link":{"record_id":"dc-c6cb3ec097761c5e","identity_action":"reuse_existing_exact_building_identity","roof_geometry_sha256":"67312f0b055a41cfdedc6984afd32fb89a3a49bfdedd74bf3e98bbd84aa56d62","new_canonical_identity_decisions":0,"new_map_hosts":0,"new_roofs":0},"selected_field_meaning":{"field":"capacity.it_mw","normalized_value":4.0,"normalized_unit":"MW","basis":"reported_critical_it_capacity","scope":"building","as_of":"2021-09-09","source_page":462,"related_selected_area_field":{"field":"building_sqft","value":167932,"unit":"sqft","basis":"reported_gross_floor_area","scope":"building","as_of":"2021-09-09","source_page":471}},"parent_review_holds":["2025Lafayette5.4MWownershipweightedquantity remainsheld; noownershipdivision.","No currentownership/operator/developer/status/openingdate inferred.","No geometry,address,name,alias orstableIDchanges.","Openingcannotbeinferredfromconstructionorrenovation. Lafayette2000/2007 vs2001/2008 sourceconflictretained.","Nativecountyparcelrecords carryunknown effective dates. Servicemodifieddate notparceldate."]},{"id":"national-power02::nfpr02-dcr-walsh-2403-2021","subject_id":"dc-40797105576228b1","entity_name":"National facility power observation nfpr02-dcr-walsh-2403-2021","operator_code":null,"reported_value":4000,"reported_unit":"kW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Historical whole-building critical IT load. Parent review links the frozen source record to this existing building only. No current ownership, operator, developer, status, opening, name, address, alias, roof, or geometry conclusion follows from this historical observation.","temporal_role":"historical_design","as_of":"2021-09-09","as_of_basis":"DCR prospectus table inspection date and 2403 Walsh appraisal date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_identity_resolved_historical_observation","scalar_eligible":true,"selected_field":"capacity.it_mw","unresolved_conflicts":[],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://links.sgx.com/FileOpen/Digital_Core_REIT_Prospectus_(29_Nov_2021).ashx?App=IPO&FileID=6328","title":"dcr-ipo","pdf_page":462,"published":null,"retrieved_at":"2026-09-17T23:53:36.065797+00:00","sha256":"0bd9f2b1c1114238b680250b47590b6a8cfa736fc75905144e3191b9c7ba69f0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"source_qualifier":"Historical Critical IT Load. The certificate isolates parcel 216-28-126 and excludes adjacent parcel 216-28-127.","record_link":{"record_id":"dc-40797105576228b1","identity_action":"reuse_existing_exact_building_identity","roof_geometry_sha256":"c963c8d1645a391bb7c760ce2b14bb0bc3e92224f6385728982e409ffef9bdc8","new_canonical_identity_decisions":0,"new_map_hosts":0,"new_roofs":0},"selected_field_meaning":{"field":"capacity.it_mw","normalized_value":4.0,"normalized_unit":"MW","basis":"reported_critical_it_capacity","scope":"building","as_of":"2021-09-09","source_page":462,"related_selected_area_field":{"field":"building_sqft","value":103940,"unit":"sqft","basis":"reported_gross_floor_area","scope":"building","as_of":"2021-09-09","source_page":473}},"parent_review_holds":["2025Lafayette5.4MWownershipweightedquantity remainsheld; noownershipdivision.","No currentownership/operator/developer/status/openingdate inferred.","No geometry,address,name,alias orstableIDchanges.","Openingcannotbeinferredfromconstructionorrenovation. Lafayette2000/2007 vs2001/2008 sourceconflictretained.","Nativecountyparcelrecords carryunknown effective dates. Servicemodifieddate notparceldate."]},{"id":"national-power02::nfpr02-element-chicago-one-utility","subject_id":null,"entity_name":"National facility power observation nfpr02-element-chicago-one-utility","operator_code":null,"reported_value":7,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"facility_unresolved","electrical_extent":"utility_service","comparison":"exact","upper_value":null,"qualifier":"Service context, not IT or whole-building design capacity.","temporal_role":"reported_capacity","as_of":null,"as_of_basis":"Operator page has no publication or effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_catalog_hold","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Service context, not IT or whole-building design capacity."],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://elementcritical.com/data-centers/chicago-data-center/","title":"element-chicago","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T23:53:36.065638+00:00","sha256":"58cc5d7d9390d79e07519f059de1fbfee8967e6f0a1f46f932aecb3ce805a6a0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power02::nfpr02-element-chicago-two-utility","subject_id":null,"entity_name":"National facility power observation nfpr02-element-chicago-two-utility","operator_code":null,"reported_value":5,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"facility_unresolved","electrical_extent":"utility_service","comparison":"exact","upper_value":null,"qualifier":"Service context, not IT or whole-building design capacity.","temporal_role":"reported_capacity","as_of":null,"as_of_basis":"Operator page has no publication or effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_catalog_hold","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Service context, not IT or whole-building design capacity."],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://elementcritical.com/data-centers/chicago-data-center/","title":"element-chicago","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T23:53:36.065638+00:00","sha256":"58cc5d7d9390d79e07519f059de1fbfee8967e6f0a1f46f932aecb3ce805a6a0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power02::nfpr02-serverfarm-atl1","subject_id":null,"entity_name":"National facility power observation nfpr02-serverfarm-atl1","operator_code":null,"reported_value":12,"reported_unit":"MW","kind":"it_critical_design","scope":"facility_unresolved","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Explicit IT value but no exact match to a current individual host was established. It remains catalog-only.","temporal_role":"reported_capacity","as_of":"2024-01-01","as_of_basis":"Copyright 2024 shown on Serverfarm one-page data sheet; no narrower effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_catalog_hold","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Explicit IT value but no exact match to a current individual host was established. It remains catalog-only."],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://www.serverfarmllc.com/wp-content/uploads/2024/02/SF-ATL1-Summary-Data-Sheet.pdf","title":"serverfarm-atl1-pdf","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T23:49:54.409003+00:00","sha256":"9583bf03cc3caf9c05c6d925d0fe21713a8d57a3cbb432c535d4b50257a3e622","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power02::nfpr02-serverfarm-ch1-abs","subject_id":"dc-10f402100f97c912","entity_name":"National facility power observation nfpr02-serverfarm-ch1-abs","operator_code":null,"reported_value":21.3,"reported_unit":"MW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Dated ABS summary. Held alongside the undated 21.5 MW page because no source establishes supersession.","temporal_role":"reported_capacity","as_of":"2026-02-04","as_of_basis":"Dated Serverfarm ABS announcement.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_catalog_hold","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["nfpr02-serverfarm-ch1-site","Dated ABS summary. Held alongside the undated 21.5 MW page because no source establishes supersession."],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://www.serverfarmllc.com/press-releases/manulife-im-backed-serverfarm-closes-589-million-abs-offering/","title":"serverfarm-abs","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T23:49:52.927926+00:00","sha256":"587622b75e6cf306c2bbdf0eafc4e5a292b107de03d8d301bf2847fca6e6206c","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power02::nfpr02-serverfarm-ch1-site","subject_id":"dc-10f402100f97c912","entity_name":"National facility power observation nfpr02-serverfarm-ch1-site","operator_code":null,"reported_value":21.5,"reported_unit":"MW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Undated operator capacity. Held because the same operator supplied a conflicting 21.3 MW ABS statement.","temporal_role":"reported_capacity","as_of":null,"as_of_basis":"Operator page has no publication or effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_catalog_hold","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["nfpr02-serverfarm-ch1-abs","Undated operator capacity. Held because the same operator supplied a conflicting 21.3 MW ABS statement."],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://www.serverfarmllc.com/chicago-data-center/","title":"serverfarm-ch1","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T23:49:52.927539+00:00","sha256":"626fed6c2ab0b3c4ad4ea29a61f316735ca113c09df705d69ed2b777bf86b272","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power02::nfpr02-serverfarm-lax1-abs","subject_id":"dc-5adbe3a976fff723","entity_name":"National facility power observation nfpr02-serverfarm-lax1-abs","operator_code":null,"reported_value":17.5,"reported_unit":"MW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Dated ABS summary. Held alongside the undated 17.3 MW page because no source establishes supersession.","temporal_role":"reported_capacity","as_of":"2026-02-04","as_of_basis":"Dated Serverfarm ABS announcement.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_catalog_hold","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["nfpr02-serverfarm-lax1-site","Dated ABS summary. Held alongside the undated 17.3 MW page because no source establishes supersession."],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://www.serverfarmllc.com/press-releases/manulife-im-backed-serverfarm-closes-589-million-abs-offering/","title":"serverfarm-abs","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T23:49:52.927926+00:00","sha256":"587622b75e6cf306c2bbdf0eafc4e5a292b107de03d8d301bf2847fca6e6206c","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power02::nfpr02-serverfarm-lax1-site","subject_id":"dc-5adbe3a976fff723","entity_name":"National facility power observation nfpr02-serverfarm-lax1-site","operator_code":null,"reported_value":17.3,"reported_unit":"MW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Undated operator capacity. Held because the same operator supplied a conflicting 17.5 MW ABS statement.","temporal_role":"reported_capacity","as_of":null,"as_of_basis":"Operator page has no publication or effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_catalog_hold","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["nfpr02-serverfarm-lax1-abs","Undated operator capacity. Held because the same operator supplied a conflicting 17.5 MW ABS statement."],"catalog_holds":[{"id":"edged-chicago-critical-capacity","values":[24],"unit":"MW","reason":"Bare critical capacity does not establish IT load. Do not reclassify or import it.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"edged-phoenix-critical-capacity","values":[36],"unit":"MW","reason":"No explicit IT boundary or individual-building electrical extent was established.","evidence":[{"url":"https://edged.us/news/introducing-four-sustainable-data-centers-across-the-u-s-3ecc7","retrieved_at":"2026-09-17T23:49:54.999700+00:00","sha256":"9998694bcf6ea0ce467de2d0878447243c925f253588e1149016f038fe68e3df","bytes":80611,"text_sha256":"d46b34a0dca860a746ee1c597fac2ef9950a44a99d1162d5ecc44ca44b27dac9","source_type":"operator_document","source_license":"company-public","document_id":"edged-launch","page":null,"locator":"HTML first-phase totals"}]},{"id":"dcr-spacepark-2025-blank-customer-it-load","values":[],"unit":"kW","reason":"The DCR 2025 table displays a dash. Preserve the blank and do not impute it from 2021.","evidence":[{"url":"https://s28.q4cdn.com/669718746/files/doc_downloads/2026/03/Digital-Core-REIT-Annual-Report-2025.pdf","retrieved_at":"2026-09-17T23:55:03.974136+00:00","sha256":"a466e46491f4be4f5ae7271b831b08c159f1b46742d27c9596d957b0c0f093d1","bytes":8966681,"text_sha256":"b5ad8f0b8403c64664e80276533ca3c90761f1a37483a5502cf136ac3d325731","source_type":"operator_document","source_license":"company-public","document_id":"dcr-2025","page":47,"locator":"PDF page 47, printed page 45"}]},{"id":"syracuse-power-and-cooling-ambiguity","values":[450],"unit":"kW","reason":"\"450 kilowatts of power and cooling\" does not identify an electrical boundary.","evidence":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","retrieved_at":"2026-09-17T23:53:36.065850+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","bytes":62512,"text_sha256":"ac4e1c3e93b82ec5036cb552867d3bee7a81d56be442de1a793704f940dd706b","source_type":"academic_document","source_license":"public-source-facts","document_id":"syracuse-resources","page":null,"locator":"HTML Syracuse University Data Center paragraph"}]},{"id":"empty-publications-acquisition","values":[],"unit":null,"reason":"DCR publications returned an empty HTTP response and cannot supply evidence.","document_id":"dcr-publications"},{"id":"databank-catalog-unreviewed","values":[],"unit":null,"reason":"All 76 cached DataBank entries remain identity-and-claim-review-required. No raw POI or duplicate catalog value was promoted."}],"sources":[{"url":"https://www.serverfarmllc.com/los-angeles-data-center/","title":"serverfarm-lax1","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T23:49:52.927842+00:00","sha256":"5dc4b5798078ec258f29307a1811b86bd09ad059ac8b31c08136dd319b0f1ad5","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-6c8c0b01a33f5f55f92b","entity_name":"Nebius Independence Missouri campus","operator_code":null,"reported_value":400,"reported_unit":"MW","kind":"dedicated_generation","scope":"campus","qualifier":"Planned onsite supply. Same page says onsite solution is being evaluated; preserve uncertainty","temporal_role":"proposed","as_of":null,"as_of_basis":"not established","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://nebius.com/independencemo","title":"Nebius x Independence, Missouri","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:44:01.929666+00:00","sha256":"cff9763c9e7b8142e9b24ddd0b33aadfdcb8e8cbdfad070da4cd8a9b4aac70d1","source_family":"operator","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-c0e71e9cbcb00140e5ec","entity_name":"Nebius Independence Missouri campus","operator_code":null,"reported_value":1.2,"reported_unit":"GW","kind":"untyped_power","scope":"campus","qualifier":"Four-building campus total capacity; IT versus facility design demand not defined","temporal_role":"proposed","as_of":null,"as_of_basis":"not established","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://nebius.com/independencemo","title":"Nebius x Independence, Missouri","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:44:01.929666+00:00","sha256":"cff9763c9e7b8142e9b24ddd0b33aadfdcb8e8cbdfad070da4cd8a9b4aac70d1","source_family":"operator","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-0817f491064ae6994f1c","entity_name":"Nebius Independence Missouri campus","operator_code":null,"reported_value":800,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"campus","qualifier":"Planned IPL supply; new IPP generation feeds SPP grid. Not metered demand or a dedicated-wire claim","temporal_role":"proposed","as_of":null,"as_of_basis":"not established","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://nebius.com/independencemo","title":"Nebius x Independence, Missouri","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:44:01.929666+00:00","sha256":"cff9763c9e7b8142e9b24ddd0b33aadfdcb8e8cbdfad070da4cd8a9b4aac70d1","source_family":"operator","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0054:1","entity_name":"Nebula Mecklenburg","operator_code":"DOM-2024-0054","reported_value":0,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"summer","reported_period":"initial","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old DOM-2024-0052 struck through, replaced by 0054. Old 2028-12-01 replaced by 2028-11-01.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":11,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0054:2","entity_name":"Nebula Mecklenburg","operator_code":"DOM-2024-0054","reported_value":12,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"winter","reported_period":"initial","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old DOM-2024-0052 struck through, replaced by 0054. Old 2028-12-01 replaced by 2028-11-01.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":11,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0054:3","entity_name":"Nebula Mecklenburg","operator_code":"DOM-2024-0054","reported_value":12,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"summer","reported_period":"2029","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old DOM-2024-0052 struck through, replaced by 0054. Old 2028-12-01 replaced by 2028-11-01.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":11,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0054:4","entity_name":"Nebula Mecklenburg","operator_code":"DOM-2024-0054","reported_value":26,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"winter","reported_period":"2029","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: old DOM-2024-0052 struck through, replaced by 0054. Old 2028-12-01 replaced by 2028-11-01.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":11,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1719","entity_name":"New York State Artificial Intelligence Data Center","operator_code":"1719","reported_value":300,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Withdrawn","generator_id":null,"proposed_date_native":"06-2028","classification":"unclassified_data_center_name","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St. Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":33,"quantity_cell":"E33"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1731","entity_name":"New York State Artificial Intelligence Data Center","operator_code":"1731","reported_value":300,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"12-2029","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St. Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":42,"quantity_cell":"E42"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1731:summer","entity_name":"New York State Artificial Intelligence Data Center","operator_code":"1731","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1731:winter","entity_name":"New York State Artificial Intelligence Data Center","operator_code":"1731","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1681","entity_name":"Niagara Digital Campus","operator_code":"1681","reported_value":140,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"FS in Progress","generator_id":null,"proposed_date_native":"01-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Niagara","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":25,"quantity_cell":"E25"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1681:summer","entity_name":"Niagara Digital Campus","operator_code":"1681","reported_value":140,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1681:winter","entity_name":"Niagara Digital Campus","operator_code":"1681","reported_value":140,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:979:note4:existing_load","entity_name":"North Country Data Center","operator_code":"979","reported_value":259,"reported_unit":"MW","kind":"reported_existing_load_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"existing_load","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"existing_as_reported","generator_id":null,"proposed_date_native":null,"classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:979:note4:resulting_total_load","entity_name":"North Country Data Center","operator_code":"979","reported_value":435,"reported_unit":"MW","kind":"reported_resulting_total_load_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"resulting_total_load","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_uprate_as_reported","generator_id":null,"proposed_date_native":null,"classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:979:note4:uprate_increment","entity_name":"North Country Data Center","operator_code":"979","reported_value":176,"reported_unit":"MW","kind":"reported_uprate_increment_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"uprate_increment","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_uprate_as_reported","generator_id":null,"proposed_date_native":null,"classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:979","entity_name":"North Country Data Center","operator_code":"0979","reported_value":435,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Under Construction","generator_id":null,"proposed_date_native":"01-2026","classification":"crypto_mining","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St. Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":14,"quantity_cell":"E14"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:979:summer","entity_name":"North Country Data Center","operator_code":"979","reported_value":176,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"uprate_increment","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-24","classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:979:winter","entity_name":"North Country Data Center","operator_code":"979","reported_value":176,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"uprate_increment","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-24","classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1741","entity_name":"North East Data LLC Data Center","operator_code":"1741","reported_value":500,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"12-2029","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Niagara","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":51,"quantity_cell":"E51"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1741:summer","entity_name":"North East Data LLC Data Center","operator_code":"1741","reported_value":500,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"May-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1741:winter","entity_name":"North East Data LLC Data Center","operator_code":"1741","reported_value":485,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"May-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-a51f0c813736d69f2564","entity_name":"NorthTown dc-north","operator_code":null,"reported_value":36,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Explicit reported design value, not measured operation.","temporal_role":"proposed","as_of":"2025-06-30","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Main description explicitly gives each building 36 MW IT; conflicting legacy campus footnotes remain unresolved."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264500&DocumentContentId=101360","title":"NorthTown Backup Generating Facility SPPE Application - Main Application 327 page(s)","pdf_page":25,"published":"2025-06-30","retrieved_at":"2026-09-16T22:56:00.918094+00:00","sha256":"905593eea077a897382a5a430bfac9396897bde056ec7774065b4f30c65e1148","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-ae181e148c64758c9ef5","entity_name":"NorthTown dc-west","operator_code":null,"reported_value":36,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Explicit reported design value, not measured operation.","temporal_role":"proposed","as_of":"2025-06-30","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Main description explicitly gives each building 36 MW IT; conflicting legacy campus footnotes remain unresolved."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264500&DocumentContentId=101360","title":"NorthTown Backup Generating Facility SPPE Application - Main Application 327 page(s)","pdf_page":25,"published":"2025-06-30","retrieved_at":"2026-09-16T22:56:00.918094+00:00","sha256":"905593eea077a897382a5a430bfac9396897bde056ec7774065b4f30c65e1148","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-86a4841585d070901278","entity_name":"NorthTown two-building campus","operator_code":null,"reported_value":97.3,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Explicit reported design value, not measured operation.","temporal_role":"proposed","as_of":"2025-06-30","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Application footnotes contain inconsistent 99 MW/64 MW legacy quantities; main narrative reports 97.3 MW/72 MW. Await applicant correction."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264500&DocumentContentId=101360","title":"NorthTown Backup Generating Facility SPPE Application - Main Application 327 page(s)","pdf_page":18,"published":"2025-06-30","retrieved_at":"2026-09-16T22:56:00.918094+00:00","sha256":"905593eea077a897382a5a430bfac9396897bde056ec7774065b4f30c65e1148","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-d8929bda78c4d66ca27c","entity_name":"NorthTown two-building campus","operator_code":null,"reported_value":72,"reported_unit":"MW","kind":"it_critical","scope":"campus","qualifier":"Explicit reported design value, not measured operation.","temporal_role":"proposed","as_of":"2025-06-30","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["Application footnotes contain inconsistent 99 MW/64 MW legacy quantities; main narrative reports 97.3 MW/72 MW. Await applicant correction."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264500&DocumentContentId=101360","title":"NorthTown Backup Generating Facility SPPE Application - Main Application 327 page(s)","pdf_page":18,"published":"2025-06-30","retrieved_at":"2026-09-16T22:56:00.918094+00:00","sha256":"905593eea077a897382a5a430bfac9396897bde056ec7774065b4f30c65e1148","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-ornl-peak","entity_name":"ORNL Building 5600","operator_code":null,"reported_value":36.5,"reported_unit":"MW","kind":"measured_peak_technical_load","scope":"technical_load_in_building_5600","qualifier":"The report describes a concurrent peak technical load of 36.5 MW during fiscal year 2022. This does not establish total facility capacity.","comparison":null,"temporal_role":"reported_actual","as_of":"2022","as_of_basis":"Fiscal year 2022 reporting period, as described in the FY2023 report.","period_start":null,"period_end":null,"measured":true,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://info.ornl.gov/sites/publications/Files/Pub188057.pdf","title":"info.ornl.gov","pdf_page":87,"published":null,"retrieved_at":"2026-09-17T11:56:58.074982+00:00","sha256":"9c8b0c8b929e961dc545ee4de3eabbf025e2bcaa7c87d35e2c2aefa54b0fb00f","source_family":"public_registry","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1723","entity_name":"Olean Digital Data Center","operator_code":"1723","reported_value":300,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Withdrawn","generator_id":null,"proposed_date_native":"12-2028","classification":"unclassified_data_center_name","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Cattaraugus","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":35,"quantity_cell":"E35"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1716:note8:existing_load","entity_name":"Orangeburg Expansion Phase 2","operator_code":"1716","reported_value":30,"reported_unit":"MW","kind":"reported_existing_load_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"existing_load","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"existing_as_reported","generator_id":null,"proposed_date_native":null,"classification":"unclassified_data_center_name","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","DataBank Orangeburg name aligns. Expansion Phase 2 is withdrawn in captured queue; source county Orange conflicts with mapped Rockland. No building assignment."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1716:note8:resulting_total_load","entity_name":"Orangeburg Expansion Phase 2","operator_code":"1716","reported_value":60,"reported_unit":"MW","kind":"reported_resulting_total_load_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"resulting_total_load","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_uprate_as_reported","generator_id":null,"proposed_date_native":null,"classification":"unclassified_data_center_name","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","DataBank Orangeburg name aligns. Expansion Phase 2 is withdrawn in captured queue; source county Orange conflicts with mapped Rockland. No building assignment."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1716:note8:uprate_increment","entity_name":"Orangeburg Expansion Phase 2","operator_code":"1716","reported_value":30,"reported_unit":"MW","kind":"reported_uprate_increment_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"uprate_increment","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_uprate_as_reported","generator_id":null,"proposed_date_native":null,"classification":"unclassified_data_center_name","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","DataBank Orangeburg name aligns. Expansion Phase 2 is withdrawn in captured queue; source county Orange conflicts with mapped Rockland. No building assignment."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1716","entity_name":"Orangeburg Expansion Phase 2","operator_code":"1716","reported_value":30,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Withdrawn","generator_id":null,"proposed_date_native":"03-2027","classification":"unclassified_data_center_name","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Orange","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","DataBank Orangeburg name aligns. Expansion Phase 2 is withdrawn in captured queue; source county Orange conflicts with mapped Rockland. No building assignment."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":31,"quantity_cell":"E31"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1716:summer","entity_name":"Orangeburg Expansion Phase 2","operator_code":"1716","reported_value":30,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"uprate_increment","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-27","classification":"unclassified_data_center_name","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","DataBank Orangeburg name aligns. Expansion Phase 2 is withdrawn in captured queue; source county Orange conflicts with mapped Rockland. No building assignment."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1716:winter","entity_name":"Orangeburg Expansion Phase 2","operator_code":"1716","reported_value":30,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"uprate_increment","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-27","classification":"unclassified_data_center_name","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","DataBank Orangeburg name aligns. Expansion Phase 2 is withdrawn in captured queue; source county Orange conflicts with mapped Rockland. No building assignment."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1763","entity_name":"Patriot Forge","operator_code":"1763","reported_value":350,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"02-2029","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Tioga","state":"PA","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":73,"quantity_cell":"E73"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1745","entity_name":"Pontoon Bridge Road Data Center","operator_code":"1745","reported_value":250,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"06-2028","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":55,"quantity_cell":"E55"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1745:summer","entity_name":"Pontoon Bridge Road Data Center","operator_code":"1745","reported_value":250,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1745:winter","entity_name":"Pontoon Bridge Road Data Center","operator_code":"1745","reported_value":250,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Oct-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-38bbffced9837b867cf7","entity_name":"Project Meadows","operator_code":null,"reported_value":500,"reported_unit":"MW","kind":"requested_service","scope":"campus","qualifier":"Project Meadows engineering service agreement requests study of up to 500 MW; no operator identity inferred.","temporal_role":"historical","as_of":"2019-05-31","as_of_basis":"May 31 2019 utility sworn filing; quantities are historical, not current contracts.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://cdx-tst.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/recent-regulatory-filings/north/grc/electric/SPPC-Elec-2019-GRC-Vol-05.pdf","title":"cdx-tst.nvenergy.com","pdf_page":131,"published":null,"retrieved_at":"2026-09-17T02:21:47.674226+00:00","sha256":"07f01ce1303a19422ff576b962a865d40032c23dbf15a4a872342b0a48ee6aa1","source_family":"utility_filing","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-4e2a50d9df2789fa96a5","entity_name":"Project Meadows","operator_code":null,"reported_value":150,"reported_unit":"MW","kind":"requested_service","scope":"phase","qualifier":"Initial phase in Project Meadows engineering study, not a whole-building load.","temporal_role":"historical","as_of":"2019-05-31","as_of_basis":"May 31 2019 utility sworn filing; quantities are historical, not current contracts.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://cdx-tst.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/recent-regulatory-filings/north/grc/electric/SPPC-Elec-2019-GRC-Vol-05.pdf","title":"cdx-tst.nvenergy.com","pdf_page":131,"published":null,"retrieved_at":"2026-09-17T02:21:47.674226+00:00","sha256":"07f01ce1303a19422ff576b962a865d40032c23dbf15a4a872342b0a48ee6aa1","source_family":"utility_filing","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1713:note6:existing_load","entity_name":"Project Sycamore Orangeburg","operator_code":"1713","reported_value":9.2,"reported_unit":"MW","kind":"reported_existing_load_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"existing_load","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"existing_as_reported","generator_id":null,"proposed_date_native":null,"classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1713:note6:resulting_total_load","entity_name":"Project Sycamore Orangeburg","operator_code":"1713","reported_value":31.5,"reported_unit":"MW","kind":"reported_resulting_total_load_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"resulting_total_load","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_uprate_as_reported","generator_id":null,"proposed_date_native":null,"classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1713:note6:uprate_increment","entity_name":"Project Sycamore Orangeburg","operator_code":"1713","reported_value":22.3,"reported_unit":"MW","kind":"reported_uprate_increment_mw","scope":"load_facility_not_resolved_to_building","qualifier":"Explicitly stated in Table IV-7 footnote; no arithmetic, PUE or allocation.","quantity_role":"uprate_increment","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_uprate_as_reported","generator_id":null,"proposed_date_native":null,"classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Resulting total is conditional on the requested uprate. It is not verified metered peak or IT load.","A native load facility can span multiple buildings. Exact building identity remains unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":137,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1713","entity_name":"Project Sycamore Orangeburg","operator_code":"1713","reported_value":22.3,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Accepted Cost Allocation/IA in Progress","generator_id":null,"proposed_date_native":"10-2029","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Rockland","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":28,"quantity_cell":"E28"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1713:summer","entity_name":"Project Sycamore Orangeburg","operator_code":"1713","reported_value":22.3,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"uprate_increment","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1713:winter","entity_name":"Project Sycamore Orangeburg","operator_code":"1713","reported_value":22.3,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"uprate_increment","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1717","entity_name":"Proposed Datacenters at 450 Broadway, Buchanan, NY, 10511","operator_code":"1717","reported_value":200,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Approved","generator_id":null,"proposed_date_native":"03-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":"450 Broadway, Buchanan, NY, 10511","city":null,"county":"Westchester","state":"NY","location_precision":"reported_project_street_address_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":32,"quantity_cell":"E32"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1717:summer","entity_name":"Proposed Datacenters at 450 Broadway, Buchanan, NY, 10511","operator_code":"1717","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Sep-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1717:winter","entity_name":"Proposed Datacenters at 450 Broadway, Buchanan, NY, 10511","operator_code":"1717","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Sep-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-initial-generator","entity_name":"QTS 2020 Phase 1, Building 1","operator_code":null,"reported_value":2250,"reported_unit":"kWe","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":4,"qualifier":"Four initial GN01-GN04 standby generator sets. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":"2019-11-08","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical public filing or filed application. Later amendments and present installed/energized capacity are not established by this fact.","Prior national handoff already supplies approximately 30 MW gross. The 2019 air application uses 4950 while later agreement and operator page use 4951. The dated 2019 plan marks four initial generators beside one building, not a full-campus power design. PGE later acknowledges both parties executed the opt-out contract."],"prior_observation_id":null,"sources":[{"url":"https://www.oregon.gov/deq/aq/cao/Documents/QTSStandardACDPAppl.pdf","title":"www.oregon.gov","pdf_page":6,"published":null,"retrieved_at":"2026-09-17T05:03:30.794856+00:00","sha256":"e1b9c5be41338f13820180f94bbc98045d8e3ef0737415d38367b61a9464b34e","source_family":"utility_or_environmental_filing","reuse_note":"Public filed facts with attribution. Manufacturer appendix has explicit reuse restrictions. Do not redistribute document or appendix imagery without rights review."},{"url":"https://www.oregon.gov/deq/aq/cao/Documents/QTSStandardACDPAppl.pdf","title":"www.oregon.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T05:03:30.794856+00:00","sha256":"e1b9c5be41338f13820180f94bbc98045d8e3ef0737415d38367b61a9464b34e","source_family":"utility_or_environmental_filing","reuse_note":"Public filed facts with attribution. Manufacturer appendix has explicit reuse restrictions. Do not redistribute document or appendix imagery without rights review."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-phase1-utility-ack","entity_name":"QTS 2020 Phase 1, Building 1","operator_code":null,"reported_value":30,"reported_unit":"MW","kind":"direct_access_allocation","scope":"building","dimension":"real_power","unit_count":null,"qualifier":"2020 Building 1 separate service point. NLDA opt-out allocation, not facility design or measured demand. Supplements prior national contract evidence.","comparison":null,"as_of":"2020-10-05","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Utility statement dated October 5, 2020. Contract effective date remains null.","Prior national handoff already supplies approximately 30 MW gross. The 2019 air application uses 4950 while later agreement and operator page use 4951. The dated 2019 plan marks four initial generators beside one building, not a full-campus power design. PGE later acknowledges both parties executed the opt-out contract."],"prior_observation_id":"pbn::qts-phase1-optout","sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAC/um2117hac105150.pdf","title":"edocs.puc.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T04:31:14.381741+00:00","sha256":"a43372838fd3d04577c3134e137bf7ff0c30eb2fd0b67108e2bcb8d37bacbd76","source_family":"utility_or_environmental_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://edocs.puc.state.or.us/efdocs/HAC/um2117hac105150.pdf","title":"edocs.puc.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T04:31:14.381741+00:00","sha256":"a43372838fd3d04577c3134e137bf7ff0c30eb2fd0b67108e2bcb8d37bacbd76","source_family":"utility_or_environmental_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"pbn::qts-phase1-optout","name":"QTS Hillsboro 1 DC1","note":"PGE acknowledged the historical NLDA contracts. This corroborates the allocation, without establishing current delivery. These observations must not be added.","source_url":"https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf","source_page":20}]},{"id":"pbo::qts-engine-mechanical","entity_name":"QTS 2020 Phase 1, Building 1","operator_code":null,"reported_value":2500,"reported_unit":"kWm","kind":"engine_mechanical_per_unit","scope":"engine","dimension":"mechanical_power","unit_count":null,"qualifier":"MTU 16V4000G84S mechanical maximum, not DS2250 electrical output. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":"2019-11-08","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical public filing or filed application. Later amendments and present installed/energized capacity are not established by this fact.","Prior national handoff already supplies approximately 30 MW gross. The 2019 air application uses 4950 while later agreement and operator page use 4951. The dated 2019 plan marks four initial generators beside one building, not a full-campus power design. PGE later acknowledges both parties executed the opt-out contract."],"prior_observation_id":null,"sources":[{"url":"https://www.oregon.gov/deq/aq/cao/Documents/QTSStandardACDPAppl.pdf","title":"www.oregon.gov","pdf_page":37,"published":null,"retrieved_at":"2026-09-17T05:03:30.794856+00:00","sha256":"e1b9c5be41338f13820180f94bbc98045d8e3ef0737415d38367b61a9464b34e","source_family":"utility_or_environmental_filing","reuse_note":"Public filed facts with attribution. Manufacturer appendix has explicit reuse restrictions. Do not redistribute document or appendix imagery without rights review."},{"url":"https://www.oregon.gov/deq/aq/cao/Documents/QTSStandardACDPAppl.pdf","title":"www.oregon.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T05:03:30.794856+00:00","sha256":"e1b9c5be41338f13820180f94bbc98045d8e3ef0737415d38367b61a9464b34e","source_family":"utility_or_environmental_filing","reuse_note":"Public filed facts with attribution. Manufacturer appendix has explicit reuse restrictions. Do not redistribute document or appendix imagery without rights review."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-phase2-utility-ack","entity_name":"QTS 2020 Phase 2 and Building 2 design revision","operator_code":null,"reported_value":60,"reported_unit":"MW","kind":"direct_access_allocation","scope":"phase","dimension":"real_power","unit_count":null,"qualifier":"2020 second NLDA service point. Contracted opt-out allocation stays separate from facility and IT fields. Physical building mapping held.","comparison":null,"as_of":"2020-10-05","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical public filing or filed application. Later amendments and present installed/energized capacity are not established by this fact.","The sworn description says additional data centers and at least another 60 MW. The same filing describes a Building 2 change to two stories. PGE identifies two buildings with separate service points. The historical phase is not yet matched to the current 4755 address and physical building through a contemporaneous plan."],"prior_observation_id":"pbn::qts-phase2-optout","sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAC/um2117hac105150.pdf","title":"edocs.puc.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T04:31:14.381741+00:00","sha256":"a43372838fd3d04577c3134e137bf7ff0c30eb2fd0b67108e2bcb8d37bacbd76","source_family":"utility_or_environmental_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://edocs.puc.state.or.us/efdocs/HAC/um2117hac105150.pdf","title":"edocs.puc.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T04:31:14.381741+00:00","sha256":"a43372838fd3d04577c3134e137bf7ff0c30eb2fd0b67108e2bcb8d37bacbd76","source_family":"utility_or_environmental_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"pbn::qts-phase2-optout","name":"QTS Hillsboro Phase 2","note":"PGE acknowledged the historical NLDA contracts. This corroborates the allocation, without establishing current delivery. These observations must not be added.","source_url":"https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf","source_page":20}]},{"id":"pbn::qts-hil1-critical-lowerbound","entity_name":"QTS Hillsboro 1 DC1","operator_code":null,"reported_value":20,"reported_unit":"MW","kind":"critical_power_unspecified","scope":"operator_facility","qualifier":"Current operator lower-bound critical power statement does not explicitly define IT; retain plus sign and do not turn it into an exact total or overwrite dated gross power.","comparison":"greater_than_or_equal","as_of":null,"as_of_basis":"Fact date not stated; retrieval timestamp is not a fact date","period_start":null,"period_end":null,"temporal_role":"undated_operator_specification","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://q.com/data-centers/hillsboro-1/","title":"q.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:31:14.937451+00:00","sha256":"bf4fc872b7de9e93b6016c3fa8cc28f5031562ead27b933d561a5a5762eebf2d","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::qts-hil1-gross","entity_name":"QTS Hillsboro 1 DC1","operator_code":null,"reported_value":30,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Approximately 30 MW gross capacity reported in sworn affidavit filed September 18, 2020. Historical reported requirement for one building, not current measured demand. The later waiver withdrawal resolved a contract timing dispute, not a project cancellation.","comparison":"approximately","as_of":"2020-09-18","as_of_basis":"Explicit document reporting date","period_start":null,"period_end":null,"temporal_role":"dated_source_power_observation","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf","title":"edocs.puc.state.or.us","pdf_page":19,"published":null,"retrieved_at":"2026-09-17T04:28:20.504845+00:00","sha256":"e9ab8ef9c27d5224fe999721f1614afae5822e5e8d15259bc886faee2abb1097","source_family":"state_utility_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf","title":"edocs.puc.state.or.us","pdf_page":69,"published":null,"retrieved_at":"2026-09-17T04:28:20.504845+00:00","sha256":"e9ab8ef9c27d5224fe999721f1614afae5822e5e8d15259bc886faee2abb1097","source_family":"state_utility_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://edocs.puc.state.or.us/efdocs/HAH/um2117hah154613.pdf","title":"edocs.puc.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T04:31:50.745052+00:00","sha256":"4187c708f6f0656621e21e6e5c432c7759b0900156e4c9d3376c97ba721e93ad","source_family":"state_utility_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://q.com/data-centers/hillsboro-1/","title":"q.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:31:14.937451+00:00","sha256":"bf4fc872b7de9e93b6016c3fa8cc28f5031562ead27b933d561a5a5762eebf2d","source_family":"operator_or_project_contractor","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::qts-phase1-optout","entity_name":"QTS Hillsboro 1 DC1","operator_code":null,"reported_value":30,"reported_unit":"MW","kind":"nlda_optout_agreement_capacity","scope":"building","qualifier":"Reported May 13, 2020 opt-out election. Customer signature is visible; utility signature line is blank in this filed copy. No independently verified present contracted or energized MW.","comparison":null,"as_of":"2020-09-18","as_of_basis":"Explicit document reporting date","period_start":null,"period_end":null,"temporal_role":"dated_source_power_observation","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf","title":"edocs.puc.state.or.us","pdf_page":20,"published":null,"retrieved_at":"2026-09-17T04:28:20.504845+00:00","sha256":"e9ab8ef9c27d5224fe999721f1614afae5822e5e8d15259bc886faee2abb1097","source_family":"state_utility_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."},{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf","title":"edocs.puc.state.or.us","pdf_page":69,"published":null,"retrieved_at":"2026-09-17T04:28:20.504845+00:00","sha256":"e9ab8ef9c27d5224fe999721f1614afae5822e5e8d15259bc886faee2abb1097","source_family":"state_utility_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"pbo::qts-phase1-utility-ack","name":"QTS 2020 Phase 1, Building 1","note":"PGE acknowledged the historical NLDA contracts. This corroborates the allocation, without establishing current delivery. These observations must not be added.","source_url":"https://edocs.puc.state.or.us/efdocs/HAC/um2117hac105150.pdf","source_page":3}]},{"id":"pbn::qts-phase2-gross","entity_name":"QTS Hillsboro Phase 2","operator_code":null,"reported_value":60,"reported_unit":"MW","kind":"gross_power_requirement","scope":"multi_building_phase","qualifier":"At least 60 MW for multiple Phase 2 buildings, not a per-building scalar.","comparison":"at_least","as_of":"2020-09-18","as_of_basis":"Explicit document reporting date","period_start":null,"period_end":null,"temporal_role":"dated_source_power_observation","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf","title":"edocs.puc.state.or.us","pdf_page":19,"published":null,"retrieved_at":"2026-09-17T04:28:20.504845+00:00","sha256":"e9ab8ef9c27d5224fe999721f1614afae5822e5e8d15259bc886faee2abb1097","source_family":"state_utility_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbn::qts-phase2-optout","entity_name":"QTS Hillsboro Phase 2","operator_code":null,"reported_value":60,"reported_unit":"MW","kind":"nlda_optout_agreement_capacity","scope":"phase","qualifier":"Historical Phase 2 agreement; no assignment to one of the later separately addressed buildings. Later settlement terms were not disclosed in the withdrawal.","comparison":null,"as_of":"2020-09-18","as_of_basis":"Explicit document reporting date","period_start":null,"period_end":null,"temporal_role":"dated_source_power_observation","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf","title":"edocs.puc.state.or.us","pdf_page":20,"published":null,"retrieved_at":"2026-09-17T04:28:20.504845+00:00","sha256":"e9ab8ef9c27d5224fe999721f1614afae5822e5e8d15259bc886faee2abb1097","source_family":"state_utility_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"pbo::qts-phase2-utility-ack","name":"QTS 2020 Phase 2 and Building 2 design revision","note":"PGE acknowledged the historical NLDA contracts. This corroborates the allocation, without establishing current delivery. These observations must not be added.","source_url":"https://edocs.puc.state.or.us/efdocs/HAC/um2117hac105150.pdf","source_page":3}]},{"id":"pbn::qts-campus-request","entity_name":"QTS Hillsboro campus","operator_code":null,"reported_value":150,"reported_unit":"MW","kind":"requested_load","scope":"campus","qualifier":"Original campus enrollment request. Not facility load, served demand or committed service.","comparison":"up_to","as_of":"2019-04-15","as_of_basis":"Original enrollment request date described in the September 18, 2020 affidavit","period_start":null,"period_end":null,"temporal_role":"dated_source_power_observation","measured":false,"unresolved_conflicts":[],"contract_effective_date":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa145130.pdf","title":"edocs.puc.state.or.us","pdf_page":20,"published":null,"retrieved_at":"2026-09-17T04:28:20.504845+00:00","sha256":"e9ab8ef9c27d5224fe999721f1614afae5822e5e8d15259bc886faee2abb1097","source_family":"state_utility_filing","reuse_note":"Attributed public facts; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-combined-average","entity_name":"QTS Hillsboro campus, NLDA and renewable supply","operator_code":null,"reported_value":150,"reported_unit":"aMW","kind":"average_load_forecast","scope":"campus","dimension":"average_power","unit_count":null,"qualifier":"Combined NLDA and cost-of-service load within four years. Average and campus forecast. No per-building or peak conversion.","comparison":"approximately","as_of":"2021-09-16","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Four-year forecast in September 2021 petition, not measured 2025/2026 consumption.","2020 testimony uses 270 MW master plan and 90 MW NLDA across two contracts. The 2022 comments explicitly use average MW and call the first two buildings Phase 1. The 2021 150 aMW is a four-year forecast, not the 270 aMW ultimate plan. Renewable 250 MW and 120 MW figures describe supply resources, not gross data-center demand. No allocation among five current map records."],"prior_observation_id":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa13128.pdf","title":"edocs.puc.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T04:54:35.861428+00:00","sha256":"2d31abb03c4c8b6bb227acc7c8bcb80edc708e3d37f95cc8f9d4e2c833d037e5","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."},{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa13128.pdf","title":"edocs.puc.state.or.us","pdf_page":12,"published":null,"retrieved_at":"2026-09-17T04:54:35.861428+00:00","sha256":"2d31abb03c4c8b6bb227acc7c8bcb80edc708e3d37f95cc8f9d4e2c833d037e5","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-cos-growth-average","entity_name":"QTS Hillsboro campus, NLDA and renewable supply","operator_code":null,"reported_value":60,"reported_unit":"aMW","kind":"average_load_forecast","scope":"campus_increment","dimension":"average_power","unit_count":null,"qualifier":"Additional buildings on cost-of-service supply. Average load forecast cannot become peak facility MW.","comparison":"approximately","as_of":"2021-09-16","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Underlying joint petition signed September 16, 2021, refiled November 3, 2021; future forecast.","2020 testimony uses 270 MW master plan and 90 MW NLDA across two contracts. The 2022 comments explicitly use average MW and call the first two buildings Phase 1. The 2021 150 aMW is a four-year forecast, not the 270 aMW ultimate plan. Renewable 250 MW and 120 MW figures describe supply resources, not gross data-center demand. No allocation among five current map records."],"prior_observation_id":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa13128.pdf","title":"edocs.puc.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T04:54:35.861428+00:00","sha256":"2d31abb03c4c8b6bb227acc7c8bcb80edc708e3d37f95cc8f9d4e2c833d037e5","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."},{"url":"https://edocs.puc.state.or.us/efdocs/HAA/haa13128.pdf","title":"edocs.puc.state.or.us","pdf_page":12,"published":null,"retrieved_at":"2026-09-17T04:54:35.861428+00:00","sha256":"2d31abb03c4c8b6bb227acc7c8bcb80edc708e3d37f95cc8f9d4e2c833d037e5","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-campus-average-2022","entity_name":"QTS Hillsboro campus, NLDA and renewable supply","operator_code":null,"reported_value":270,"reported_unit":"average Megawatts","kind":"average_load_forecast","scope":"campus","dimension":"average_power","unit_count":null,"qualifier":"Five buildings at full campus completion. Average planned service requirement, not building peak or measured load.","comparison":"up_to","as_of":"2022-09-15","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical public filing or filed application. Later amendments and present installed/energized capacity are not established by this fact.","2020 testimony uses 270 MW master plan and 90 MW NLDA across two contracts. The 2022 comments explicitly use average MW and call the first two buildings Phase 1. The 2021 150 aMW is a four-year forecast, not the 270 aMW ultimate plan. Renewable 250 MW and 120 MW figures describe supply resources, not gross data-center demand. No allocation among five current map records."],"prior_observation_id":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAC/ar651hac153657.pdf","title":"edocs.puc.state.or.us","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T05:03:30.794423+00:00","sha256":"178e6db1cc0d35a233435bad242bd220893569982e00a5a6bd6df099bf7c0315","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-first-two-average-2022","entity_name":"QTS Hillsboro campus, NLDA and renewable supply","operator_code":null,"reported_value":90,"reported_unit":"aMW","kind":"average_load_forecast","scope":"two_buildings","dimension":"average_power","unit_count":null,"qualifier":"First two buildings, called Phase 1 in 2022 comments. Different phase vocabulary from 2020; no scalar assignment to 2020 Phase 1 building.","comparison":null,"as_of":"2022-09-15","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical public filing or filed application. Later amendments and present installed/energized capacity are not established by this fact.","2020 testimony uses 270 MW master plan and 90 MW NLDA across two contracts. The 2022 comments explicitly use average MW and call the first two buildings Phase 1. The 2021 150 aMW is a four-year forecast, not the 270 aMW ultimate plan. Renewable 250 MW and 120 MW figures describe supply resources, not gross data-center demand. No allocation among five current map records."],"prior_observation_id":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAC/ar651hac153657.pdf","title":"edocs.puc.state.or.us","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T05:03:30.794423+00:00","sha256":"178e6db1cc0d35a233435bad242bd220893569982e00a5a6bd6df099bf7c0315","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-nlda-total-2020","entity_name":"QTS Hillsboro campus, NLDA and renewable supply","operator_code":null,"reported_value":90,"reported_unit":"MW","kind":"direct_access_allocation","scope":"campus","dimension":"real_power","unit_count":null,"qualifier":"Two 2020 NLDA contracts. Reported enrollment, not measured or per-building peak demand.","comparison":null,"as_of":"2020-10-16","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical public filing or filed application. Later amendments and present installed/energized capacity are not established by this fact.","2020 testimony uses 270 MW master plan and 90 MW NLDA across two contracts. The 2022 comments explicitly use average MW and call the first two buildings Phase 1. The 2021 150 aMW is a four-year forecast, not the 270 aMW ultimate plan. Renewable 250 MW and 120 MW figures describe supply resources, not gross data-center demand. No allocation among five current map records."],"prior_observation_id":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAC/um2117hac163915.pdf","title":"edocs.puc.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T04:57:08.916702+00:00","sha256":"e9fb7edbc3273dfaaae0ac1b55bcb1e5ac09bb154c4c856c606ace0d38945f3e","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."},{"url":"https://edocs.puc.state.or.us/efdocs/HAC/um2117hac163915.pdf","title":"edocs.puc.state.or.us","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:57:08.916702+00:00","sha256":"e9fb7edbc3273dfaaae0ac1b55bcb1e5ac09bb154c4c856c606ace0d38945f3e","source_family":"utility_or_environmental_filing","reuse_note":"Public facts with attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-renewable-nameplate","entity_name":"QTS Hillsboro campus, NLDA and renewable supply","operator_code":null,"reported_value":250,"reported_unit":"MW","kind":"renewable_procurement_nameplate","scope":"renewable_supply_portfolio","dimension":"real_power","unit_count":null,"qualifier":"QTS additional renewable CSO resource allocation. Renewable generator supply nameplate, not onsite generation or facility demand.","comparison":null,"as_of":"2023-08-18","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical public filing or filed application. Later amendments and present installed/energized capacity are not established by this fact.","2020 testimony uses 270 MW master plan and 90 MW NLDA across two contracts. The 2022 comments explicitly use average MW and call the first two buildings Phase 1. The 2021 150 aMW is a four-year forecast, not the 270 aMW ultimate plan. Renewable 250 MW and 120 MW figures describe supply resources, not gross data-center demand. No allocation among five current map records."],"prior_observation_id":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAD/um1953had165552.pdf","title":"edocs.puc.state.or.us","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:54:35.862098+00:00","sha256":"73d8364f0326eb598a0b91192dd767db2691ea1064ddcce2831a87784c00cb5b","source_family":"utility_or_environmental_filing","reuse_note":"Only public cover facts. Do not extract, render, publish or redistribute referenced confidential workpapers or customer agreements."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::qts-renewable-workpaper-part","entity_name":"QTS Hillsboro campus, NLDA and renewable supply","operator_code":null,"reported_value":120,"reported_unit":"MW","kind":"renewable_procurement_nameplate","scope":"renewable_supply_portfolio","dimension":"real_power","unit_count":null,"qualifier":"Part of 250 MW allocation addressed by public cover. Only public cover used. Resource supply capacity cannot become data-center consumption.","comparison":null,"as_of":"2023-08-18","as_of_basis":"Source document date, not energization or measurement date","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical public filing or filed application. Later amendments and present installed/energized capacity are not established by this fact.","2020 testimony uses 270 MW master plan and 90 MW NLDA across two contracts. The 2022 comments explicitly use average MW and call the first two buildings Phase 1. The 2021 150 aMW is a four-year forecast, not the 270 aMW ultimate plan. Renewable 250 MW and 120 MW figures describe supply resources, not gross data-center demand. No allocation among five current map records."],"prior_observation_id":null,"sources":[{"url":"https://edocs.puc.state.or.us/efdocs/HAD/um1953had165552.pdf","title":"edocs.puc.state.or.us","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:54:35.862098+00:00","sha256":"73d8364f0326eb598a0b91192dd767db2691ea1064ddcce2831a87784c00cb5b","source_family":"utility_or_environmental_filing","reuse_note":"Only public cover facts. Do not extract, render, publish or redistribute referenced confidential workpapers or customer agreements."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-qts-annex","subject_id":null,"entity_name":"QTS Piscataway additional two-story expansion","operator_code":null,"reported_value":15,"reported_unit":"MW","kind":"untyped_power","scope":"expansion","electrical_extent":"extent_unresolved","comparison":"exact","upper_value":null,"qualifier":"Current operator describes an additional two-story expansion. Original 36.4 and current 65+ differ in date and physical scope; unresolved extent prevents selecting a canonical IT value.","temporal_role":"advertised_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["qts_original_vs_expanded_electrical_extent","Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://qtsdatacenters.com/data-centers/piscataway/?type=Whitepaper","title":"qts_piscataway","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:02:51.006476+00:00","sha256":"af916d5fe9423bbe67ac778fa8f5f396cb83f533407ff9a12f0c8fef1eea800c","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-qts-current","subject_id":null,"entity_name":"QTS Piscataway advertised expanded site","operator_code":null,"reported_value":65,"reported_unit":"MW","kind":"it_critical_design","scope":"campus_or_expanded_building","electrical_extent":"extent_unresolved","comparison":"at_least","upper_value":null,"qualifier":"Current operator describes an additional two-story expansion. Original 36.4 and current 65+ differ in date and physical scope; unresolved extent prevents selecting a canonical IT value.","temporal_role":"advertised_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["qts_original_vs_expanded_electrical_extent","Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://qtsdatacenters.com/data-centers/piscataway/?type=Whitepaper","title":"qts_piscataway","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:02:51.006476+00:00","sha256":"af916d5fe9423bbe67ac778fa8f5f396cb83f533407ff9a12f0c8fef1eea800c","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-3d4cf7f06313210a652e","entity_name":"RB Inyokern SCE MOS174 service","operator_code":null,"reported_value":99,"reported_unit":"MW","kind":"contracted_service","scope":"project","qualifier":"Applicant reports secured permanent service via MOS174 from 2029 onward. Executed SCE agreement not independently obtained.","temporal_role":"proposed","as_of":"2026-05-08","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":"2029-01-01","period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=269893&DocumentContentId=107049","title":"RB Inyokern Data Center - SPPE Application 1037 page(s)","pdf_page":313,"published":"2026-05-08","retrieved_at":"2026-09-16T22:56:09.213005+00:00","sha256":"e964cc475edd9680966865221634a1c46189a36ec00b2e307d6efbf96fc69131","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-9c31ca2a6382f33a6ece","entity_name":"RB Inyokern full buildout","operator_code":null,"reported_value":99,"reported_unit":"MW","kind":"facility_total_design","scope":"project","qualifier":"June 2026 revised design states phase-3 full-buildout total 99 MW and IT 70 MW. Project includes ancillary infrastructure; no building allocation.","temporal_role":"proposed","as_of":"2026-06-29","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["May application also calls 99 MW IT load. June revision repeats 70 MW IT and revises phase totals. No accepted physical building match."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=271058&DocumentContentId=108645","title":"Appendix B Supplement - Section B1 Revision 1 Appendix Supplement â Data Response Set 1 40 page(s)","pdf_page":10,"published":"2026-06-29","retrieved_at":"2026-09-16T22:55:53.581549+00:00","sha256":"d7d8655f1624fd06ec8a0b3de0d436786f6ed9d66801e546636b19c7c0a893fc","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-6bd72d2d5526e2372aa5","entity_name":"RB Inyokern full buildout","operator_code":null,"reported_value":70,"reported_unit":"MW","kind":"it_critical","scope":"project","qualifier":"June 2026 revised design states phase-3 full-buildout total 99 MW and IT 70 MW. Project includes ancillary infrastructure; no building allocation.","temporal_role":"proposed","as_of":"2026-06-29","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["May application also calls 99 MW IT load. June revision repeats 70 MW IT and revises phase totals. No accepted physical building match."],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=271058&DocumentContentId=108645","title":"Appendix B Supplement - Section B1 Revision 1 Appendix Supplement â Data Response Set 1 40 page(s)","pdf_page":10,"published":"2026-06-29","retrieved_at":"2026-09-16T22:55:53.581549+00:00","sha256":"d7d8655f1624fd06ec8a0b3de0d436786f6ed9d66801e546636b19c7c0a893fc","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-b9feee7e07bd8518af3b","entity_name":"RB Inyokern temporary commissioning service","operator_code":null,"reported_value":20,"reported_unit":"MW","kind":"requested_service","scope":"project","qualifier":"SCE evaluating feasibility of up to 20 MW temporary service by mid-2028. No approved contract inferred.","temporal_role":"proposed","as_of":"2026-05-08","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=269893&DocumentContentId=107049","title":"RB Inyokern Data Center - SPPE Application 1037 page(s)","pdf_page":313,"published":"2026-05-08","retrieved_at":"2026-09-16T22:56:09.213005+00:00","sha256":"e964cc475edd9680966865221634a1c46189a36ec00b2e307d6efbf96fc69131","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1736","entity_name":"Ranalli SuperDC","operator_code":"1736","reported_value":270,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"06-2027","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Onondaga","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":46,"quantity_cell":"E46"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1736:summer","entity_name":"Ranalli SuperDC","operator_code":"1736","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"May-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1736:winter","entity_name":"Ranalli SuperDC","operator_code":"1736","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"May-28","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1735","entity_name":"Remington Factory Redevelopment","operator_code":"1735","reported_value":100,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"02-2029","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Herkimer","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":45,"quantity_cell":"E45"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1735:summer","entity_name":"Remington Factory Redevelopment","operator_code":"1735","reported_value":100,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jul-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1735:winter","entity_name":"Remington Factory Redevelopment","operator_code":"1735","reported_value":100,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jul-27","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power03::nfpr03-riot-rockdale-option","subject_id":null,"entity_name":"Riot Rockdale AMD expansion option","operator_code":null,"reported_value":75,"reported_unit":"MW","kind":"critical_it_expansion_option","scope":"campus","electrical_extent":"optional_future_expansion","comparison":"exact","upper_value":null,"qualifier":"Additional 75 MW option only. Exercise and actual delivery are not established; do not add to current IT capacity.","temporal_role":"unexercised_expansion_option","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm","title":"riot-rockdale-2026","pdf_page":null,"published":"2026-01-16","retrieved_at":"2026-09-18T03:53:56.094025+00:00","sha256":"157ab81c18d939cbbdc3f5f81533734d9f9f77bc42fd0ef7416a27c680eb9516","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"AMD lease, options and anticipated phased delivery","text_lines_1_based":[31,32],"text_character_span":[4679,5594],"normalized_text_character_span":[4679,5594]}],"text_sha256":"117e3b77beb9b98d4249ed0dcd10ec342565e8a0100b93393a97c67983af7728","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-01-16","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-01-16","sec_filing_date":"2026-01-16","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"riot-rockdale-grid-lease-options","identity_state":"unresolved_no_record_association","correction_ids":["C08-riot-future-lease-options-not-current-it"],"source_observation_id":"nfpr03-riot-rockdale-option","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-riot-rockdale-amd-it","subject_id":null,"entity_name":"Riot Rockdale AMD initial deployment","operator_code":null,"reported_value":25,"reported_unit":"MW","kind":"leased_critical_it_future_delivery","scope":"building_unresolved","electrical_extent":"one_existing_building","comparison":"exact","upper_value":null,"qualifier":"25 MW leased critical IT capacity to be delivered in phases January through May 2026. Existing building retrofit is not linked to a record here. Expected delivery does not prove current IT load.","temporal_role":"contracted_future_delivery","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm","title":"riot-rockdale-2026","pdf_page":null,"published":"2026-01-16","retrieved_at":"2026-09-18T03:53:56.094025+00:00","sha256":"157ab81c18d939cbbdc3f5f81533734d9f9f77bc42fd0ef7416a27c680eb9516","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"AMD lease, options and anticipated phased delivery","text_lines_1_based":[31,32],"text_character_span":[4679,5594],"normalized_text_character_span":[4679,5594]}],"text_sha256":"117e3b77beb9b98d4249ed0dcd10ec342565e8a0100b93393a97c67983af7728","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-01-16","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-01-16","sec_filing_date":"2026-01-16","document_period_end":null,"event_dates":[],"forecast_target_period":{"start":"2026-01","end":"2026-05","precision":"month","role":"expected_delivery_window_not_actual"},"non_additive_group":"riot-rockdale-grid-lease-options","identity_state":"unresolved_no_record_association","correction_ids":["C08-riot-future-lease-options-not-current-it"],"source_observation_id":"nfpr03-riot-rockdale-amd-it","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-riot-rockdale-rofr","subject_id":null,"entity_name":"Riot Rockdale AMD right of first refusal","operator_code":null,"reported_value":100,"reported_unit":"MW","kind":"critical_it_right_of_first_refusal","scope":"campus","electrical_extent":"optional_future_expansion","comparison":"exact","upper_value":null,"qualifier":"Another 100 MW right of first refusal only. Not a current or committed delivery value and not additive to current IT.","temporal_role":"right_of_first_refusal","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm","title":"riot-rockdale-2026","pdf_page":null,"published":"2026-01-16","retrieved_at":"2026-09-18T03:53:56.094025+00:00","sha256":"157ab81c18d939cbbdc3f5f81533734d9f9f77bc42fd0ef7416a27c680eb9516","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"AMD lease, options and anticipated phased delivery","text_lines_1_based":[31,32],"text_character_span":[4679,5594],"normalized_text_character_span":[4679,5594]}],"text_sha256":"117e3b77beb9b98d4249ed0dcd10ec342565e8a0100b93393a97c67983af7728","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-01-16","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-01-16","sec_filing_date":"2026-01-16","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"riot-rockdale-grid-lease-options","identity_state":"unresolved_no_record_association","correction_ids":["C08-riot-future-lease-options-not-current-it"],"source_observation_id":"nfpr03-riot-rockdale-rofr","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-riot-rockdale-grid","subject_id":null,"entity_name":"Riot Rockdale Site","operator_code":null,"reported_value":700,"reported_unit":"MW","kind":"grid_interconnection_gross_power","scope":"campus","electrical_extent":"site_interconnection","comparison":"exact","upper_value":null,"qualifier":"700 MW site grid interconnection and gross power context; proposed conversion to data-center tenants does not establish 700 MW IT capacity or operating data-center load.","temporal_role":"gross_interconnection_reported_in_dated_release","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm","title":"riot-rockdale-2026","pdf_page":null,"published":"2026-01-16","retrieved_at":"2026-09-18T03:53:56.094025+00:00","sha256":"157ab81c18d939cbbdc3f5f81533734d9f9f77bc42fd0ef7416a27c680eb9516","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Acquisition of the Rockdale Site","text_lines_1_based":[27,27],"text_character_span":[3710,4134],"normalized_text_character_span":[3710,4134]}],"text_sha256":"117e3b77beb9b98d4249ed0dcd10ec342565e8a0100b93393a97c67983af7728","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-01-16","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-01-16","sec_filing_date":"2026-01-16","document_period_end":null,"event_dates":[],"forecast_target_period":null,"non_additive_group":"riot-rockdale-grid-lease-options","identity_state":"unresolved_no_record_association","correction_ids":["C08-riot-future-lease-options-not-current-it"],"source_observation_id":"nfpr03-riot-rockdale-grid","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"eia860-2025:59074:14B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"14B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16985,"quantity_cell":"P16985"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:17A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"17A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16986,"quantity_cell":"P16986"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:17B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"17B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16987,"quantity_cell":"P16987"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:18A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"18A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16988,"quantity_cell":"P16988"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:18B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"18B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16989,"quantity_cell":"P16989"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:19A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"19A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16990,"quantity_cell":"P16990"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:19B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"19B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16991,"quantity_cell":"P16991"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:20A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"20A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16992,"quantity_cell":"P16992"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:20B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"20B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16993,"quantity_cell":"P16993"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:21A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"21A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16994,"quantity_cell":"P16994"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:21B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"21B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16995,"quantity_cell":"P16995"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:22A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"22A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16996,"quantity_cell":"P16996"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:22B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"22B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16997,"quantity_cell":"P16997"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG10A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG10A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16998,"quantity_cell":"P16998"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG10B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG10B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":16999,"quantity_cell":"P16999"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG11A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG11A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17000,"quantity_cell":"P17000"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG11B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG11B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17001,"quantity_cell":"P17001"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG12A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG12A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17002,"quantity_cell":"P17002"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG12B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG12B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17003,"quantity_cell":"P17003"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG13A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG13A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17004,"quantity_cell":"P17004"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG13B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG13B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17005,"quantity_cell":"P17005"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG14A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG14A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17006,"quantity_cell":"P17006"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG15A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG15A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17007,"quantity_cell":"P17007"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG15B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG15B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17008,"quantity_cell":"P17008"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG16A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG16A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17009,"quantity_cell":"P17009"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG16B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG16B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17010,"quantity_cell":"P17010"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG1A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG1A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17011,"quantity_cell":"P17011"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG1B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG1B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17012,"quantity_cell":"P17012"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG2A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG2A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17013,"quantity_cell":"P17013"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG2B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG2B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17014,"quantity_cell":"P17014"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG3A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG3A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17015,"quantity_cell":"P17015"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG3B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG3B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17016,"quantity_cell":"P17016"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG4A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG4A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17017,"quantity_cell":"P17017"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG4B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG4B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17018,"quantity_cell":"P17018"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG5A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG5A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17019,"quantity_cell":"P17019"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG5B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG5B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17020,"quantity_cell":"P17020"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG6A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG6A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17021,"quantity_cell":"P17021"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG6B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG6B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17022,"quantity_cell":"P17022"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG7A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG7A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17023,"quantity_cell":"P17023"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG7B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG7B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17024,"quantity_cell":"P17024"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG8A:retired-and-canceled","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"EG8A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":5206,"quantity_cell":"P5206"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG8B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG8B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17025,"quantity_cell":"P17025"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG9A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG9A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17026,"quantity_cell":"P17026"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:EG9B:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.3,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"EG9B","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17027,"quantity_cell":"P17027"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:59074:GEN8A:operable","entity_name":"SC 1 Data Center, Phase 2","operator_code":"59074","reported_value":2.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"GEN8A","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"555 Reed Street","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":17028,"quantity_cell":"P17028"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1315","entity_name":"SDC St. Lawrence","operator_code":"1315","reported_value":120,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Rejected Cost Allocation/Next FS Pending","generator_id":null,"proposed_date_native":"11-2026","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St. Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":16,"quantity_cell":"E16"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1315:summer","entity_name":"SDC St. Lawrence","operator_code":"1315","reported_value":120,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Aug-25","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1315:winter","entity_name":"SDC St. Lawrence","operator_code":"1315","reported_value":120,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Aug-25","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:2022 (on Effective Date)","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":1.0,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2022 (on Effective Date)","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:2023 (on Effective Date)","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":4.5,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2023 (on Effective Date)","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:December 31, 2028","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":55.0,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"December 31, 2028","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:July 1, 2024","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":5.0,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"July 1, 2024","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:July 1, 2025","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":18.0,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"July 1, 2025","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:July 1, 2026","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":31.0,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"July 1, 2026","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:July 1, 2027","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":45.0,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"July 1, 2027","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:July 1, 2029","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":65.0,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"July 1, 2029","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:July 1, 2030","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":72.0,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"July 1, 2030","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_available_service_mva:memorex:July 1, 2031","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":77.0,"reported_unit":"MVA","kind":"amended_available_service_mva","scope":"customer_service_property","qualifier":"Amended Table E1 total available capacity at 1200 Memorex.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"July 1, 2031","temporal_role":"load_evidence","as_of":"2026-04-21","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Phase 6 requires KRS battery and PG&E Series Compensation projects. Phases 7-10 require listed transmission upgrades.","2025 blank template date on Exhibit E is not the approval date. The council action is April 21, 2026."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=3E88A01C-4852-44FD-A4D9-ABE0908F2E40&ID=15400269&M=F","title":"santaclara.legistar.com","pdf_page":10,"published":null,"retrieved_at":"2026-09-17T03:20:39.927283+00:00","sha256":"05ed38ed30fa5c85a682adc1317bcef804bdcf023e839bb009c686bee3b794d5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:original_available_service_mva:memorex:2022","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":1.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2022","temporal_role":"load_evidence","as_of":"2022-05-05","as_of_basis":"City signature May 5, 2022 on page 15; public upload date unknown; attached to April 21, 2026 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Original 2022 schedule. Council authorized a replacement schedule April 21, 2026; do not add the two schedules."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","title":"santaclara.legistar.com","pdf_page":25,"published":null,"retrieved_at":"2026-09-17T03:20:43.248776+00:00","sha256":"8090220524e40400c72257bee75f8d442c9ef95f77ff354b1904df170c4c7b1b","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"stack:svy02a:customer_reported_agreement_service_mva:2022","name":"STACK SVY02A","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","source_page":15}]},{"id":"named-service:original_available_service_mva:memorex:2023","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":4.5,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2023","temporal_role":"load_evidence","as_of":"2022-05-05","as_of_basis":"City signature May 5, 2022 on page 15; public upload date unknown; attached to April 21, 2026 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Original 2022 schedule. Council authorized a replacement schedule April 21, 2026; do not add the two schedules."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","title":"santaclara.legistar.com","pdf_page":25,"published":null,"retrieved_at":"2026-09-17T03:20:43.248776+00:00","sha256":"8090220524e40400c72257bee75f8d442c9ef95f77ff354b1904df170c4c7b1b","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"stack:svy02a:customer_reported_agreement_service_mva:2023","name":"STACK SVY02A","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","source_page":15}]},{"id":"named-service:original_available_service_mva:memorex:2024","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":5.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2024","temporal_role":"load_evidence","as_of":"2022-05-05","as_of_basis":"City signature May 5, 2022 on page 15; public upload date unknown; attached to April 21, 2026 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Original 2022 schedule. Council authorized a replacement schedule April 21, 2026; do not add the two schedules."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","title":"santaclara.legistar.com","pdf_page":25,"published":null,"retrieved_at":"2026-09-17T03:20:43.248776+00:00","sha256":"8090220524e40400c72257bee75f8d442c9ef95f77ff354b1904df170c4c7b1b","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"stack:svy02a:customer_reported_agreement_service_mva:2024","name":"STACK SVY02A","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","source_page":15}]},{"id":"named-service:original_available_service_mva:memorex:2025","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":18.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2025","temporal_role":"load_evidence","as_of":"2022-05-05","as_of_basis":"City signature May 5, 2022 on page 15; public upload date unknown; attached to April 21, 2026 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Original 2022 schedule. Council authorized a replacement schedule April 21, 2026; do not add the two schedules."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","title":"santaclara.legistar.com","pdf_page":25,"published":null,"retrieved_at":"2026-09-17T03:20:43.248776+00:00","sha256":"8090220524e40400c72257bee75f8d442c9ef95f77ff354b1904df170c4c7b1b","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"stack:svy02a:customer_reported_agreement_service_mva:2025","name":"STACK SVY02A","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","source_page":15}]},{"id":"named-service:original_available_service_mva:memorex:2026","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":28.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2026","temporal_role":"load_evidence","as_of":"2022-05-05","as_of_basis":"City signature May 5, 2022 on page 15; public upload date unknown; attached to April 21, 2026 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Original 2022 schedule. Council authorized a replacement schedule April 21, 2026; do not add the two schedules."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","title":"santaclara.legistar.com","pdf_page":25,"published":null,"retrieved_at":"2026-09-17T03:20:43.248776+00:00","sha256":"8090220524e40400c72257bee75f8d442c9ef95f77ff354b1904df170c4c7b1b","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"stack:svy02a:customer_reported_agreement_service_mva:2026","name":"STACK SVY02A","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","source_page":15}]},{"id":"named-service:original_available_service_mva:memorex:2027 through 2031","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":31.0,"reported_unit":"MVA","kind":"original_available_service_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"conditional_total_service_capacity","comparison":null,"season":null,"reported_period":"2027 through 2031","temporal_role":"load_evidence","as_of":"2022-05-05","as_of_basis":"City signature May 5, 2022 on page 15; public upload date unknown; attached to April 21, 2026 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"signed_original_historical_schedule; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Original 2022 schedule. Council authorized a replacement schedule April 21, 2026; do not add the two schedules."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","title":"santaclara.legistar.com","pdf_page":25,"published":null,"retrieved_at":"2026-09-17T03:20:43.248776+00:00","sha256":"8090220524e40400c72257bee75f8d442c9ef95f77ff354b1904df170c4c7b1b","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"stack:svy02a:customer_reported_agreement_service_mva:2027-31","name":"STACK SVY02A","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","source_page":15}]},{"id":"named-service:original_customer_request_mva:memorex:2022-05-05","entity_name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","operator_code":null,"reported_value":90,"reported_unit":"MVA","kind":"original_customer_request_mva","scope":"customer_service_property","qualifier":"Requested total capacity explicitly stated in the executed original. Distinct from staged available capacity.","quantity_role":"requested_total","comparison":null,"season":null,"reported_period":"2022-05-05","temporal_role":"load_evidence","as_of":"2022-05-05","as_of_basis":"City signature May 5, 2022 on page 15; public upload date unknown; attached to April 21, 2026 council item; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"historical_customer_request_in_signed_original; both_parties_signed_copy_reviewed","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Previous customer claim describes a 2018 90 MW / 100 MVA request. This later contract request is 90 MVA. Do not silently replace the historical request."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","title":"santaclara.legistar.com","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T03:20:43.248776+00:00","sha256":"8090220524e40400c72257bee75f8d442c9ef95f77ff354b1904df170c4c7b1b","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::stack-por02-lighting","entity_name":"STACK POR02, historical Infomart report","operator_code":null,"reported_value":500,"reported_unit":"kW","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":1,"qualifier":"Emergency lighting generator. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Historical report names Infomart at 21515 NW Evergreen. Legacy index currently names SI POR02 at 8135 NE Evergreen. No direct readdressing instrument was reviewed, so association to the current point remains a lead. Generator electrical kW differs from stated engine horsepower."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0183-SI-01_RR_2018.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-16T22:29:39.365340+00:00","sha256":"a0f898b4459d44f95da73ac90d7274d3ceb94da225ea24cdf25cffde1e29b8f7","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::stack-por02-main2000","entity_name":"STACK POR02, historical Infomart report","operator_code":null,"reported_value":2000,"reported_unit":"kW","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":2,"qualifier":"Two 2011 MTU emergency generators. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Historical report names Infomart at 21515 NW Evergreen. Legacy index currently names SI POR02 at 8135 NE Evergreen. No direct readdressing instrument was reviewed, so association to the current point remains a lead. Generator electrical kW differs from stated engine horsepower."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0183-SI-01_RR_2018.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-16T22:29:39.365340+00:00","sha256":"a0f898b4459d44f95da73ac90d7274d3ceb94da225ea24cdf25cffde1e29b8f7","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::stack-por02-main2250","entity_name":"STACK POR02, historical Infomart report","operator_code":null,"reported_value":2250,"reported_unit":"kW","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":5,"qualifier":"Five 2011 MTU emergency generators. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Historical report names Infomart at 21515 NW Evergreen. Legacy index currently names SI POR02 at 8135 NE Evergreen. No direct readdressing instrument was reviewed, so association to the current point remains a lead. Generator electrical kW differs from stated engine horsepower."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0183-SI-01_RR_2018.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-16T22:29:39.365340+00:00","sha256":"a0f898b4459d44f95da73ac90d7274d3ceb94da225ea24cdf25cffde1e29b8f7","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::stack-por03-backup-total","entity_name":"STACK POR03 source 34-0245","operator_code":null,"reported_value":147,"reported_unit":"MW","kind":"backup_generation_total","scope":"permit_source","dimension":"real_power","unit_count":null,"qualifier":"All emergency generators in historical POR03 air source. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Image-only report visually identifies SI POR03 at 4735 NE Starr. Page 3 states 49 emergency generators totaling 147 MW. Page 4 says six previously approved plus forty-three additional generators beside buildings. No division among POR03A/B/C or current points."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0245-ST-01_RR_2021.PDF","title":"deqonline.deq.state.or.us","pdf_page":3,"published":null,"retrieved_at":"2026-09-16T22:29:41.439287+00:00","sha256":"597b927fcd7c6572afa57b11463263d82e1688c6ef2bc3bebe77d0f9aa115bb0","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::stack-por01-life-safety","entity_name":"STACK PORL01 emergency power schedule","operator_code":null,"reported_value":0.25,"reported_unit":"MWe","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":1,"qualifier":"Gen LS existing life-safety unit. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Table separates five existing main units and one life-safety unit from eleven future main units and two future life-safety units. No total assumes future units are installed."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0157-ST-01_RR_2022.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-16T22:29:38.662499+00:00","sha256":"92c20bebbff9abd1d113d0f86f6345831cfc9152835a7e62c1b5f2ac41f557eb","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pbo::stack-por01-main-unit","entity_name":"STACK PORL01 emergency power schedule","operator_code":null,"reported_value":2.5,"reported_unit":"MWe","kind":"backup_generator_per_unit","scope":"generator","dimension":"real_power","unit_count":null,"qualifier":"Gen 1 representative existing main unit; table also lists Gen2/3/R1/S1. Backup generation only. No conversion to facility input or IT demand. No equipment total is derived.","comparison":null,"as_of":null,"as_of_basis":"Exact source date unknown; no day inferred from URL year, retrieval date or expiry","period_start":null,"period_end":null,"temporal_role":"historical_filed_power_observation","measured":false,"unresolved_conflicts":["Historical DEQ review report from the legacy portal. That portal covers documents before November 20, 2024. This review does not establish current permit validity, installed equipment, measured demand or operating status.","Table separates five existing main units and one life-safety unit from eleven future main units and two future life-safety units. No total assumes future units are installed."],"prior_observation_id":null,"sources":[{"url":"https://deqonline.deq.state.or.us/AQPermitsonline/34-0157-ST-01_RR_2022.PDF","title":"deqonline.deq.state.or.us","pdf_page":4,"published":null,"retrieved_at":"2026-09-16T22:29:38.662499+00:00","sha256":"92c20bebbff9abd1d113d0f86f6345831cfc9152835a7e62c1b5f2ac41f557eb","source_family":"utility_or_environmental_filing","reuse_note":"Public regulatory facts with attribution; full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"stack:svy02a:customer_reported_2018_load_request_mva:2023","entity_name":"STACK SVY02A","operator_code":null,"reported_value":100,"reported_unit":"MVA","kind":"customer_reported_2018_load_request_mva","scope":"individual_building","qualifier":"Customer reports original developer request in2018, targeted by2023; both units explicitly stated, no conversion.","quantity_role":"historical_requested_building_load","comparison":null,"season":null,"reported_period":"2023","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex.","A later research batch checked the signed original and a council-authorized amendment with blank signature fields. These documents do not prove current delivery."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"stack:svy02a:customer_reported_2018_load_request_mw:2023","entity_name":"STACK SVY02A","operator_code":null,"reported_value":90,"reported_unit":"MW","kind":"customer_reported_2018_load_request_mw","scope":"individual_building","qualifier":"Customer reports original developer request in2018, targeted by2023; both units explicitly stated, no conversion.","quantity_role":"historical_requested_building_load","comparison":null,"season":null,"reported_period":"2023","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex.","A later research batch checked the signed original and a council-authorized amendment with blank signature fields. These documents do not prove current delivery."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"stack:svy02a:customer_reported_agreement_service_mva:2022","entity_name":"STACK SVY02A","operator_code":null,"reported_value":1,"reported_unit":"MVA","kind":"customer_reported_agreement_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Customer transcription of substation agreement ramp; contract itself not verified.","quantity_role":"reported_2022_agreement_ramp","comparison":null,"season":null,"reported_period":"2022","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"named-service:original_available_service_mva:memorex:2022","name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","source_page":25}]},{"id":"stack:svy02a:customer_reported_agreement_service_mva:2023","entity_name":"STACK SVY02A","operator_code":null,"reported_value":4.5,"reported_unit":"MVA","kind":"customer_reported_agreement_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Customer transcription of substation agreement ramp; contract itself not verified.","quantity_role":"reported_2022_agreement_ramp","comparison":null,"season":null,"reported_period":"2023","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"named-service:original_available_service_mva:memorex:2023","name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","source_page":25}]},{"id":"stack:svy02a:customer_reported_agreement_service_mva:2024","entity_name":"STACK SVY02A","operator_code":null,"reported_value":5,"reported_unit":"MVA","kind":"customer_reported_agreement_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Customer transcription of substation agreement ramp; contract itself not verified.","quantity_role":"reported_2022_agreement_ramp","comparison":null,"season":null,"reported_period":"2024","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"named-service:original_available_service_mva:memorex:2024","name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","source_page":25}]},{"id":"stack:svy02a:customer_reported_agreement_service_mva:2025","entity_name":"STACK SVY02A","operator_code":null,"reported_value":18,"reported_unit":"MVA","kind":"customer_reported_agreement_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Customer transcription of substation agreement ramp; contract itself not verified.","quantity_role":"reported_2022_agreement_ramp","comparison":null,"season":null,"reported_period":"2025","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"named-service:original_available_service_mva:memorex:2025","name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","source_page":25}]},{"id":"stack:svy02a:customer_reported_agreement_service_mva:2026","entity_name":"STACK SVY02A","operator_code":null,"reported_value":28,"reported_unit":"MVA","kind":"customer_reported_agreement_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Customer transcription of substation agreement ramp; contract itself not verified.","quantity_role":"reported_2022_agreement_ramp","comparison":null,"season":null,"reported_period":"2026","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"named-service:original_available_service_mva:memorex:2026","name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","source_page":25}]},{"id":"stack:svy02a:customer_reported_agreement_service_mva:2027-31","entity_name":"STACK SVY02A","operator_code":null,"reported_value":31,"reported_unit":"MVA","kind":"customer_reported_agreement_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Customer transcription of substation agreement ramp; contract itself not verified.","quantity_role":"reported_2022_agreement_ramp","comparison":null,"season":null,"reported_period":"2027-31","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"related_observations":[{"id":"named-service:original_available_service_mva:memorex:2027 through 2031","name":"STACK / 1220 Santa Clara Propco at 1200 Memorex","note":"The signed original corroborates this historical schedule. These observations describe the same capacity and must not be added.","source_url":"https://santaclara.legistar.com/View.ashx?GUID=F1031C8D-2F48-4049-A74D-0A597AC14DB0&ID=15400268&M=F","source_page":25}]},{"id":"stack:svy02a:customer_reported_available_service_mva:2024-06-24","entity_name":"STACK SVY02A","operator_code":null,"reported_value":4.5,"reported_unit":"MVA","kind":"customer_reported_available_service_mva","scope":"individual_building","qualifier":"Customer assertion of service availability or cap, not measured demand.","quantity_role":"reported_service_availability","comparison":null,"season":null,"reported_period":"2024-06-24","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex.","A later research batch checked the signed original and a council-authorized amendment with blank signature fields. These documents do not prove current delivery."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":16,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"stack:svy02a:customer_reported_service_cap_mva:2025-until-at-least-2028","entity_name":"STACK SVY02A","operator_code":null,"reported_value":18,"reported_unit":"MVA","kind":"customer_reported_service_cap_mva","scope":"individual_building","qualifier":"Customer assertion of service availability or cap, not measured demand.","quantity_role":"reported_service_availability","comparison":null,"season":null,"reported_period":"2025-until-at-least-2028","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex.","A later research batch checked the signed original and a council-authorized amendment with blank signature fields. These documents do not prove current delivery."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":16,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"stack:svy02a:customer_requested_service_mva:2022","entity_name":"STACK SVY02A","operator_code":null,"reported_value":18,"reported_unit":"MVA","kind":"customer_requested_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Requested load ramp dated summer2021.","quantity_role":"2021_requested_load_ramp","comparison":null,"season":null,"reported_period":"2022","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex.","A later research batch checked the signed original and a council-authorized amendment with blank signature fields. These documents do not prove current delivery."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"stack:svy02a:customer_requested_service_mva:2023","entity_name":"STACK SVY02A","operator_code":null,"reported_value":35,"reported_unit":"MVA","kind":"customer_requested_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Requested load ramp dated summer2021.","quantity_role":"2021_requested_load_ramp","comparison":null,"season":null,"reported_period":"2023","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex.","A later research batch checked the signed original and a council-authorized amendment with blank signature fields. These documents do not prove current delivery."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"stack:svy02a:customer_requested_service_mva:2024","entity_name":"STACK SVY02A","operator_code":null,"reported_value":53,"reported_unit":"MVA","kind":"customer_requested_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Requested load ramp dated summer2021.","quantity_role":"2021_requested_load_ramp","comparison":null,"season":null,"reported_period":"2024","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex.","A later research batch checked the signed original and a council-authorized amendment with blank signature fields. These documents do not prove current delivery."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"stack:svy02a:customer_requested_service_mva:2025","entity_name":"STACK SVY02A","operator_code":null,"reported_value":70,"reported_unit":"MVA","kind":"customer_requested_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Requested load ramp dated summer2021.","quantity_role":"2021_requested_load_ramp","comparison":null,"season":null,"reported_period":"2025","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex.","A later research batch checked the signed original and a council-authorized amendment with blank signature fields. These documents do not prove current delivery."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"stack:svy02a:customer_requested_service_mva:2026-31","entity_name":"STACK SVY02A","operator_code":null,"reported_value":86,"reported_unit":"MVA","kind":"customer_requested_service_mva","scope":"individual_building","qualifier":"Customer claim table in apparent-power MVA. Requested load ramp dated summer2021.","quantity_role":"2021_requested_load_ramp","comparison":null,"season":null,"reported_period":"2026-31","temporal_role":"load_evidence","as_of":"2024-06-24","as_of_basis":"Printed document or plan revision date. STACK excerpt has its own claim date2024-06-24 inside2026-04-07 council packet.","period_start":null,"period_end":null,"measured":false,"source_status_note":"customer claim filed with city; contested capacity and representations, not adjudicated findings","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"1200 Memorex Drive","city":"Santa Clara","county":null,"state":"CA","location_precision":"primary_customer_building_address_no_coordinate_confirmation","planning_area":null,"point_of_interconnection":null,"grid_region":"CAISO"},"unresolved_conflicts":["Claims are attributed to STACK, not city findings or a utility-certified meter record.","The 2026 council packet reproduces a June24 2024 claim. Do not treat it as current2026 availability.","Claim p3 footnote uses MW for18/28/31 while the ramp table and narrative use MVA. Unit conflict remains unresolved.","1100Memorex is the claimant mailing address; the prose identifies the subject building at1200Memorex.","A later research batch checked the signed original and a council-authorized amendment with blank signature fields. These documents do not prove current delivery."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?GUID=41D90CA3-8232-4978-9508-DB1418113E87&ID=1349150&M=E2","title":"santaclara.legistar.com","pdf_page":15,"published":"2026-04-07","retrieved_at":"2026-09-17T02:43:31.856436+00:00","sha256":"ccc92aea483b84f9afe0436e2fb9d515cf2fe99a05e19a1f270a0c4fd53a6deb","source_family":"customer_claim_in_municipal_council_packet","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-acef4abe096c956005a6","entity_name":"STACK SVY03A project including security building","operator_code":null,"reported_value":67.2,"reported_unit":"MW","kind":"facility_total_design","scope":"project","qualifier":"Revised project total includes separate security building. No whole-building scalar; earlier 76.6 MW proposal is superseded.","temporal_role":"proposed","as_of":"2025-04-25","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=262794&DocumentContentId=99407","title":"STACK SVY03A Data Center Campus Final Initial Study Mitigated Negative Declaration 490 page(s)","pdf_page":25,"published":"2025-04-25","retrieved_at":"2026-09-16T22:59:32.288809+00:00","sha256":"993ed8b9c45f868ca38d492d6556a9592deb2b3d689f83720d3074cff6612d3a","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-90d984ef24c97ba0dc94","entity_name":"STACK Trade Zone Park two-building campus","operator_code":null,"reported_value":78,"reported_unit":"MW","kind":"facility_expected_demand","scope":"campus","qualifier":"Combined two-building design. Generic singular building in PUE paragraph does not change the campus scope. No per-building allocation.","temporal_role":"proposed","as_of":"2022-09-19","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=246142&DocumentContentId=80307","title":"STACK Trade Zone Park Revised Project Description 55 page(s)","pdf_page":11,"published":"2022-09-19","retrieved_at":"2026-09-16T22:55:09.872946+00:00","sha256":"00f1f8e461f453185758ce3c3a63476abc2dd502197b3fb22dcf0018712df5ed","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-e701ab627aa9cbbc348e","entity_name":"STACK Trade Zone Park two-building campus","operator_code":null,"reported_value":90,"reported_unit":"MW","kind":"facility_total_design","scope":"campus","qualifier":"Combined two-building design. Generic singular building in PUE paragraph does not change the campus scope. No per-building allocation.","temporal_role":"proposed","as_of":"2022-09-19","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=246142&DocumentContentId=80307","title":"STACK Trade Zone Park Revised Project Description 55 page(s)","pdf_page":11,"published":"2022-09-19","retrieved_at":"2026-09-16T22:55:09.872946+00:00","sha256":"00f1f8e461f453185758ce3c3a63476abc2dd502197b3fb22dcf0018712df5ed","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-44d0e4f7fa10f3699650","entity_name":"STACK Trade Zone Park two-building campus","operator_code":null,"reported_value":60,"reported_unit":"MW","kind":"it_critical","scope":"campus","qualifier":"Combined two-building design. Generic singular building in PUE paragraph does not change the campus scope. No per-building allocation.","temporal_role":"proposed","as_of":"2022-09-19","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=246142&DocumentContentId=80307","title":"STACK Trade Zone Park Revised Project Description 55 page(s)","pdf_page":11,"published":"2022-09-19","retrieved_at":"2026-09-16T22:55:09.872946+00:00","sha256":"00f1f8e461f453185758ce3c3a63476abc2dd502197b3fb22dcf0018712df5ed","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"washington-power03::waip02-sabey-campus-123","subject_id":null,"entity_name":"Sabey Quincy campus","operator_code":null,"reported_value":123,"reported_unit":"MW","kind":"critical_power_unspecified","scope":"campus","electrical_extent":"campus_critical_capacity_definition_unspecified","comparison":"exact","upper_value":null,"qualifier":"Critical capacity across built, in-construction and planned campus. Conflicts with130MW badge page2; no individual A/B/D/E allocation.","temporal_role":"undated_operator_marketing","as_of":null,"as_of_basis":"Undated source, retrieval timestamp is not an as-of date","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["sabey-campus-critical-conflict","Parent selected this attributed project or campus quantity for catalog publication only. No building field is authorized."],"catalog_holds":{"additional_holds":["Sabey130/123MW figures conflict within one document. Preserve both and do not sum.","Sabey pages say critical capacity without an explicit IT definition. Retain source extraction it_critical as extraction metadata only, with public kind critical_power_unspecified.","No observed facility demand, per-building allocation, power conversion, status, opening, GFA or currentness inferred.","No scalar field promotion. Catalog rows and project/campus quantities do not count as buildings."],"held_groups":[{"package":"washington_bulk_power_round01","reason":"Awaiting separate parent source review; earlier identity import is not power selection.","selection":"all36catalog_observations"}]},"sources":[{"url":"https://info.sabeydatacenters.com/hubfs/SDC%20Downloadables/SDC%20Cutsheets/SDC%20Quincy%2009242024.pdf","title":"sabey_cutsheet_2024","pdf_page":3,"published":null,"retrieved_at":"2026-09-17T14:04:14.679213+00:00","sha256":"fcbafc406f3e0bd189c151268b585e82c9636ef48a5c6ab9936b6ea35d7d99f5","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"source_extraction_kind":"it_critical"},{"id":"washington-power03::waip02-sabey-campus-130","subject_id":null,"entity_name":"Sabey Quincy campus","operator_code":null,"reported_value":130,"reported_unit":"MW","kind":"critical_power_unspecified","scope":"campus","electrical_extent":"campus_critical_capacity_definition_unspecified","comparison":"exact","upper_value":null,"qualifier":"Critical Capacity badge; same PDF page3 says123MW. Undated document, URL date is not a publication date.","temporal_role":"undated_operator_marketing","as_of":null,"as_of_basis":"Undated source, retrieval timestamp is not an as-of date","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["sabey-campus-critical-conflict","Parent selected this attributed project or campus quantity for catalog publication only. No building field is authorized."],"catalog_holds":{"additional_holds":["Sabey130/123MW figures conflict within one document. Preserve both and do not sum.","Sabey pages say critical capacity without an explicit IT definition. Retain source extraction it_critical as extraction metadata only, with public kind critical_power_unspecified.","No observed facility demand, per-building allocation, power conversion, status, opening, GFA or currentness inferred.","No scalar field promotion. Catalog rows and project/campus quantities do not count as buildings."],"held_groups":[{"package":"washington_bulk_power_round01","reason":"Awaiting separate parent source review; earlier identity import is not power selection.","selection":"all36catalog_observations"}]},"sources":[{"url":"https://info.sabeydatacenters.com/hubfs/SDC%20Downloadables/SDC%20Cutsheets/SDC%20Quincy%2009242024.pdf","title":"sabey_cutsheet_2024","pdf_page":2,"published":null,"retrieved_at":"2026-09-17T14:04:14.679213+00:00","sha256":"fcbafc406f3e0bd189c151268b585e82c9636ef48a5c6ab9936b6ea35d7d99f5","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"source_extraction_kind":"it_critical"},{"id":"power2-6306b420569804a94761","entity_name":"Sequoia Data Center","operator_code":null,"reported_value":58,"reported_unit":"MW","kind":"facility_expected_demand","scope":"building","qualifier":"Source explicitly reports total 58 MW at average conditions. No PUE calculation by this pipeline.","temporal_role":"proposed","as_of":"2021-01-25","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=236429&DocumentContentId=69431","title":"SBGF Revised Project Description and AQ Emissions - Tier 4 Air Quality, Hazardous Materials, Project Description 31 page(s)","pdf_page":6,"published":"2021-01-25","retrieved_at":"2026-09-16T22:54:56.614746+00:00","sha256":"cf0cd31dab5a5be6fdb3173ac2693f41e532130dc57b9b1074b4ea048ddf4559","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-b89692ebf4230ae23625","entity_name":"Sequoia Data Center","operator_code":null,"reported_value":96.5,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Final CEC decision explicitly distinguishes 67.5 MW IT and 96.5 MW maximum building demand.","temporal_role":"proposed","as_of":"2021-07-06","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=238706&DocumentContentId=72105","title":"efiling.energy.ca.gov","pdf_page":10,"published":"2021-07-06","retrieved_at":"2026-09-17T02:20:58.838229+00:00","sha256":"1fc6a2812862938f01331fc614f80183bf332184dd5b6dd4b7291f9803c6b405","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-bd641080b7d926380c75","entity_name":"Sequoia Data Center","operator_code":null,"reported_value":47,"reported_unit":"MW","kind":"forecast_load","scope":"building","qualifier":"Expected average IT load, not critical IT design capacity.","temporal_role":"forecast","as_of":"2021-01-25","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=236429&DocumentContentId=69431","title":"SBGF Revised Project Description and AQ Emissions - Tier 4 Air Quality, Hazardous Materials, Project Description 31 page(s)","pdf_page":6,"published":"2021-01-25","retrieved_at":"2026-09-16T22:54:56.614746+00:00","sha256":"cf0cd31dab5a5be6fdb3173ac2693f41e532130dc57b9b1074b4ea048ddf4559","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-7e273914854fe0bdd81d","entity_name":"Sequoia Data Center","operator_code":null,"reported_value":67.5,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Final CEC decision explicitly distinguishes 67.5 MW IT and 96.5 MW maximum building demand.","temporal_role":"proposed","as_of":"2021-07-06","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=238706&DocumentContentId=72105","title":"efiling.energy.ca.gov","pdf_page":10,"published":"2021-07-06","retrieved_at":"2026-09-17T02:20:58.838229+00:00","sha256":"1fc6a2812862938f01331fc614f80183bf332184dd5b6dd4b7291f9803c6b405","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-6b7ddbe579bab6047c25","entity_name":"Sequoia Data Center","operator_code":null,"reported_value":99,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"building","qualifier":"Applicant reports SVP will-serve letter for up to 99 MW. Contract was still being negotiated; this is not an executed service agreement.","temporal_role":"proposed","as_of":"2021-01-25","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=236429&DocumentContentId=69431","title":"SBGF Revised Project Description and AQ Emissions - Tier 4 Air Quality, Hazardous Materials, Project Description 31 page(s)","pdf_page":6,"published":"2021-01-25","retrieved_at":"2026-09-16T22:54:56.614746+00:00","sha256":"cf0cd31dab5a5be6fdb3173ac2693f41e532130dc57b9b1074b4ea048ddf4559","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:serial-dc1:ultimate_requested_load_mw:ultimate_requested_project_load","entity_name":"Serial Data Center 1","operator_code":null,"reported_value":250,"reported_unit":"MW","kind":"ultimate_requested_load_mw","scope":"load_interconnection_project","qualifier":"Ultimate load level MW in PG&E serial data-center request table.","quantity_role":"ultimate_requested_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"2028","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"San Jose","point_of_interconnection":"New Midpoint on Newark-NRS 230 kV line","grid_region":"CAISO"},"unresolved_conflicts":["Anonymous request. POI and power size cannot identify a customer or building.","Do not join Serial DC3 to a nearby NTT/Nortech campus by the Los Esteros POI alone."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":68,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:serial-dc2:ultimate_requested_load_mw:ultimate_requested_project_load","entity_name":"Serial Data Center 2","operator_code":null,"reported_value":200,"reported_unit":"MW","kind":"ultimate_requested_load_mw","scope":"load_interconnection_project","qualifier":"Ultimate load level MW in PG&E serial data-center request table.","quantity_role":"ultimate_requested_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"2028","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"San Jose","point_of_interconnection":"New San Jose C on San Jose A-B 115 kV line","grid_region":"CAISO"},"unresolved_conflicts":["Anonymous request. POI and power size cannot identify a customer or building.","Do not join Serial DC3 to a nearby NTT/Nortech campus by the Los Esteros POI alone."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":68,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pge:serial-dc3:ultimate_requested_load_mw:ultimate_requested_project_load","entity_name":"Serial Data Center 3","operator_code":null,"reported_value":250,"reported_unit":"MW","kind":"ultimate_requested_load_mw","scope":"load_interconnection_project","qualifier":"Ultimate load level MW in PG&E serial data-center request table.","quantity_role":"ultimate_requested_project_load","comparison":null,"season":null,"reported_period":null,"temporal_role":"load_evidence","as_of":"2025-09-25","as_of_basis":"Printed meeting/filing date if supplied; otherwise unknown, inspect captured source.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_or_planning_source_only","proposed_date_native":"2028","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":null,"county":null,"state":"CA","location_precision":"electrical_delivery_point_not_building","planning_area":"San Jose","point_of_interconnection":"Los Esteros dual 230 kV service","grid_region":"CAISO"},"unresolved_conflicts":["Anonymous request. POI and power size cannot identify a customer or building.","Do not join Serial DC3 to a nearby NTT/Nortech campus by the Los Esteros POI alone."],"sources":[{"url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf","title":"stakeholdercenter.caiso.com","pdf_page":68,"published":"2025-09-25","retrieved_at":"2026-09-17T02:42:38.638978+00:00","sha256":"a1c9483d48249a3daed33225b8755f469d48d08c0f9127f32ec6047fdf8f51f7","source_family":"caiso-pge-sep2025","reuse_note":"Public primary source; factual extraction with attribution. No license to republish raw documents or images assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0070:1","entity_name":"Shaw Culpeper REC","operator_code":"DOM-2025-0070","reported_value":300,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"expected load","temporal_role":"dated_load_record","as_of":"2026-01-06","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested 2028-05-01.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260106/20260106-item-07---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":14,"published":"2026-01-06","retrieved_at":"2026-09-17T01:44:51.852353+00:00","sha256":"2f238764129e7df2ba1fbc7af464705ef0354973d8fcb1ba49a4350e86f31060","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2026-0015:1","entity_name":"Simms NNEC","operator_code":"DOM-2026-0015","reported_value":296,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"ultimate","temporal_role":"dated_load_record","as_of":"2026-04-07","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested 2029-12-01; source spells Kings Geroge County.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260407/20260407-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2026-04-07","retrieved_at":"2026-09-17T01:44:08.334712+00:00","sha256":"bd83050e6d2f294d432e871a3bcedfd3574ff6489ea54094d073b6e1118076b0","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-6d776aeba736d37df68c","entity_name":"Soluna DV Services LLC MDC Farm","operator_code":null,"reported_value":25,"reported_unit":"MW","kind":"forecast_load","scope":"phase","qualifier":"Initial peak is lesser of about 25 MW or ERCOT-approved demand","temporal_role":"forecast","as_of":"2023-02-24","as_of_basis":"Agreement effective date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/64463/000149315223010333/ex10-68.htm","title":"www.sec.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:44:01.124545+00:00","sha256":"cfb223fb4297b70cc6c676bb0956bfde4ebe12df888ce778c23c7ff0178b6c33","source_family":"cooperative_service","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-b245d032f43e41193523","entity_name":"Soluna DV Services LLC MDC Farm","operator_code":null,"reported_value":150,"reported_unit":"MW","kind":"forecast_load","scope":"campus","qualifier":"Estimated peak demand up to 150 MW for MDC farm; not the separate 150 MW wind generator","temporal_role":"forecast","as_of":"2023-02-24","as_of_basis":"Agreement effective date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/64463/000149315223010333/ex10-68.htm","title":"www.sec.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:44:01.124545+00:00","sha256":"cfb223fb4297b70cc6c676bb0956bfde4ebe12df888ce778c23c7ff0178b6c33","source_family":"cooperative_service","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1213","entity_name":"St Lawrence Data and Agricultural Center","operator_code":"1213","reported_value":200,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Accepted Cost Allocation/IA in Progress","generator_id":null,"proposed_date_native":"08-2025","classification":"crypto_mining","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St. Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":15,"quantity_cell":"E15"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1213:summer","entity_name":"St Lawrence Data and Agricultural Center","operator_code":"1213","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-26","classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1213:winter","entity_name":"St Lawrence Data and Agricultural Center","operator_code":"1213","reported_value":200,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jan-26","classification":"crypto_mining","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1742","entity_name":"St. Lawrence Infrastructure 1","operator_code":"1742","reported_value":860,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"01-2030","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St. Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":52,"quantity_cell":"E52"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1742:summer","entity_name":"St. Lawrence Infrastructure 1","operator_code":"1742","reported_value":860,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-29","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1742:winter","entity_name":"St. Lawrence Infrastructure 1","operator_code":"1742","reported_value":860,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Dec-29","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1743","entity_name":"St. Lawrence Infrastructure 2","operator_code":"1743","reported_value":1935,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS Pending","generator_id":null,"proposed_date_native":"12-2028","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"St. Lawrence","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":53,"quantity_cell":"E53"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1743:summer","entity_name":"St. Lawrence Infrastructure 2","operator_code":"1743","reported_value":1935,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jul-30","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1743:winter","entity_name":"St. Lawrence Infrastructure 2","operator_code":"1743","reported_value":1935,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jul-30","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2026-001:1","entity_name":"Stuart Adams County AES Ohio","operator_code":"Dayton-2026-001","reported_value":100,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2028-11","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Total requested new load at each date; do not sum ramp points.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2026-001:2","entity_name":"Stuart Adams County AES Ohio","operator_code":"Dayton-2026-001","reported_value":400,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2029-07","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Total requested new load at each date; do not sum ramp points.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2026-001:3","entity_name":"Stuart Adams County AES Ohio","operator_code":"Dayton-2026-001","reported_value":700,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2030-10","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Total requested new load at each date; do not sum ramp points.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2026-001:4","entity_name":"Stuart Adams County AES Ohio","operator_code":"Dayton-2026-001","reported_value":1100,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2031-10","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Total requested new load at each date; do not sum ramp points.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:Dayton-2026-001:5","entity_name":"Stuart Adams County AES Ohio","operator_code":"Dayton-2026-001","reported_value":1300,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"2032-03","temporal_role":"dated_load_record","as_of":"2026-02-03","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Total requested new load at each date; do not sum ramp points.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260203/20260203-item-06---dayton-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2026-02-03","retrieved_at":"2026-09-17T01:44:46.944285+00:00","sha256":"100c95702a59a431fbee8b187d8c6b07976e0471384fd720584a82c1d4188bc9","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1633","entity_name":"Suffern Quarry Data Center","operator_code":"1633","reported_value":200,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Withdrawn","generator_id":null,"proposed_date_native":"10-2026","classification":"unclassified_data_center_name","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Rockland","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":22,"quantity_cell":"E22"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"ferc-susquehanna:conditional-960","entity_name":"Susquehanna co-located data-center load","operator_code":"ER24-2172-000/001; PJM Service Agreement 1442","reported_value":960,"reported_unit":"MW","kind":"co_located_load_authorization_or_request_mw","scope":"co_located_load_aggregate","qualifier":"Interconnection agreement load allowance or requested transfer, not metered demand, IT load or generation nameplate.","quantity_role":"conditional_physical_transfer_proposal_in_rejected_amendment","comparison":"stated_boundary","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2024-11-01","as_of_basis":"Issued date printed on PDF page 1.","period_start":null,"period_end":null,"measured":false,"source_status_note":"conditional_physical_transfer_proposal_in_rejected_amendment","generator_id":null,"proposed_date_native":null,"classification":"data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_generator_interconnection_not_building"},"unresolved_conflicts":["Historical November 2024 order only. Subsequent contracts, orders and operating demand are not established here.","FERC rejected the 480 MW amendment. 960 MW was conditional on resolving generation deliverability violations.","150 MW is per generating unit, not per data-center building. No allocation among roofs.","Existing Amazon Berwick record is a campus association candidate. The cited order paragraphs identify Susquehanna co-located load, not this street address or building."],"sources":[{"url":"https://www.ferc.gov/sites/default/files/2024-11/20241101-3061_ER24-2172-000.pdf","title":"www.ferc.gov","pdf_page":6,"published":"2024-11-01","retrieved_at":"2026-09-17T02:00:21.532756+00:00","sha256":"69b04b60cfc5f0150af8cb2f96eabca1c6af9ff74f8bbdbd41a2929b0bf69934","source_family":"federal_interconnection_order","reuse_note":"Federal order or public filing catalog. U.S. government work where authored by FERC; third-party filings may have separate rights.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"ferc-susquehanna:existing-300","entity_name":"Susquehanna co-located data-center load","operator_code":"ER24-2172-000/001; PJM Service Agreement 1442","reported_value":300,"reported_unit":"MW","kind":"co_located_load_authorization_or_request_mw","scope":"co_located_load_aggregate","qualifier":"Interconnection agreement load allowance or requested transfer, not metered demand, IT load or generation nameplate.","quantity_role":"historical_existing_ISA_boundary","comparison":"stated_boundary","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2024-11-01","as_of_basis":"Issued date printed on PDF page 1.","period_start":null,"period_end":null,"measured":false,"source_status_note":"historical_existing_ISA_boundary","generator_id":null,"proposed_date_native":null,"classification":"data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_generator_interconnection_not_building"},"unresolved_conflicts":["Historical November 2024 order only. Subsequent contracts, orders and operating demand are not established here.","FERC rejected the 480 MW amendment. 960 MW was conditional on resolving generation deliverability violations.","150 MW is per generating unit, not per data-center building. No allocation among roofs.","Existing Amazon Berwick record is a campus association candidate. The cited order paragraphs identify Susquehanna co-located load, not this street address or building."],"sources":[{"url":"https://www.ferc.gov/sites/default/files/2024-11/20241101-3061_ER24-2172-000.pdf","title":"www.ferc.gov","pdf_page":1,"published":"2024-11-01","retrieved_at":"2026-09-17T02:00:21.532756+00:00","sha256":"69b04b60cfc5f0150af8cb2f96eabca1c6af9ff74f8bbdbd41a2929b0bf69934","source_family":"federal_interconnection_order","reuse_note":"Federal order or public filing catalog. U.S. government work where authored by FERC; third-party filings may have separate rights.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"ferc-susquehanna:per-unit-150","entity_name":"Susquehanna co-located data-center load","operator_code":"ER24-2172-000/001; PJM Service Agreement 1442","reported_value":150,"reported_unit":"MW","kind":"co_located_load_authorization_or_request_mw","scope":"co_located_load_behind_each_generating_unit","qualifier":"Interconnection agreement load allowance or requested transfer, not metered demand, IT load or generation nameplate.","quantity_role":"historical_conditional_authorization","comparison":"at_most","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2024-11-01","as_of_basis":"Issued date printed on PDF page 1.","period_start":null,"period_end":null,"measured":false,"source_status_note":"historical_conditional_authorization","generator_id":null,"proposed_date_native":null,"classification":"data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_generator_interconnection_not_building"},"unresolved_conflicts":["Historical November 2024 order only. Subsequent contracts, orders and operating demand are not established here.","FERC rejected the 480 MW amendment. 960 MW was conditional on resolving generation deliverability violations.","150 MW is per generating unit, not per data-center building. No allocation among roofs.","Existing Amazon Berwick record is a campus association candidate. The cited order paragraphs identify Susquehanna co-located load, not this street address or building."],"sources":[{"url":"https://www.ferc.gov/sites/default/files/2024-11/20241101-3061_ER24-2172-000.pdf","title":"www.ferc.gov","pdf_page":5,"published":"2024-11-01","retrieved_at":"2026-09-17T02:00:21.532756+00:00","sha256":"69b04b60cfc5f0150af8cb2f96eabca1c6af9ff74f8bbdbd41a2929b0bf69934","source_family":"federal_interconnection_order","reuse_note":"Federal order or public filing catalog. U.S. government work where authored by FERC; third-party filings may have separate rights.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"ferc-susquehanna:rejected-480","entity_name":"Susquehanna co-located data-center load","operator_code":"ER24-2172-000/001; PJM Service Agreement 1442","reported_value":480,"reported_unit":"MW","kind":"co_located_load_authorization_or_request_mw","scope":"co_located_load_aggregate","qualifier":"Interconnection agreement load allowance or requested transfer, not metered demand, IT load or generation nameplate.","quantity_role":"rejected_amendment","comparison":"at_most","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2024-11-01","as_of_basis":"Issued date printed on PDF page 1.","period_start":null,"period_end":null,"measured":false,"source_status_note":"rejected_amendment","generator_id":null,"proposed_date_native":null,"classification":"data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_generator_interconnection_not_building"},"unresolved_conflicts":["Historical November 2024 order only. Subsequent contracts, orders and operating demand are not established here.","FERC rejected the 480 MW amendment. 960 MW was conditional on resolving generation deliverability violations.","150 MW is per generating unit, not per data-center building. No allocation among roofs.","Existing Amazon Berwick record is a campus association candidate. The cited order paragraphs identify Susquehanna co-located load, not this street address or building."],"sources":[{"url":"https://www.ferc.gov/sites/default/files/2024-11/20241101-3061_ER24-2172-000.pdf","title":"www.ferc.gov","pdf_page":1,"published":"2024-11-01","retrieved_at":"2026-09-17T02:00:21.532756+00:00","sha256":"69b04b60cfc5f0150af8cb2f96eabca1c6af9ff74f8bbdbd41a2929b0bf69934","source_family":"federal_interconnection_order","reuse_note":"Federal order or public filing catalog. U.S. government work where authored by FERC; third-party filings may have separate rights.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-8d2dbd878d470954a129","entity_name":"Switch SuperNAP Reno campus","operator_code":null,"reported_value":145.8,"reported_unit":"MW","kind":"requested_service","scope":"campus","qualifier":"Amended/restated Rule 9 agreement 16-00042 section 1.3 reports 145.8 MW potential load at assumed 95% power factor. Section 1.1 does not reserve electrical capacity; recital O excludes power supply. Native reported MW, no MVA conversion. Applicant signed May 30 2017; utility signature/date are blank in the filed copy.","temporal_role":"historical","as_of":"2019-05-31","as_of_basis":"Utility sworn filing dated May 31 2019; applicant signature date visually read on PDF page 178.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://cdx-tst.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/recent-regulatory-filings/north/grc/electric/SPPC-Elec-2019-GRC-Vol-05.pdf","title":"cdx-tst.nvenergy.com","pdf_page":152,"published":null,"retrieved_at":"2026-09-17T02:21:47.674226+00:00","sha256":"07f01ce1303a19422ff576b962a865d40032c23dbf15a4a872342b0a48ee6aa1","source_family":"utility_filing","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"},{"url":"https://cdx-tst.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/recent-regulatory-filings/north/grc/electric/SPPC-Elec-2019-GRC-Vol-05.pdf","title":"cdx-tst.nvenergy.com","pdf_page":152,"published":null,"retrieved_at":"2026-09-17T02:21:47.674226+00:00","sha256":"07f01ce1303a19422ff576b962a865d40032c23dbf15a4a872342b0a48ee6aa1","source_family":"utility_filing","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"},{"url":"https://cdx-tst.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/recent-regulatory-filings/north/grc/electric/SPPC-Elec-2019-GRC-Vol-05.pdf","title":"cdx-tst.nvenergy.com","pdf_page":152,"published":null,"retrieved_at":"2026-09-17T02:21:47.674226+00:00","sha256":"07f01ce1303a19422ff576b962a865d40032c23dbf15a4a872342b0a48ee6aa1","source_family":"utility_filing","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-c9b181c0853e260f05f3","entity_name":"Switch SuperNAP Reno campus","operator_code":null,"reported_value":153,"reported_unit":"MW","kind":"requested_service","scope":"campus","qualifier":"Earlier transmission study for up to 153 MW at Switch. This is not the 145.8 MW amended contract.","temporal_role":"historical","as_of":"2019-05-31","as_of_basis":"May 31 2019 utility sworn filing; quantities are historical, not current contracts.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://cdx-tst.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/recent-regulatory-filings/north/grc/electric/SPPC-Elec-2019-GRC-Vol-05.pdf","title":"cdx-tst.nvenergy.com","pdf_page":129,"published":null,"retrieved_at":"2026-09-17T02:21:47.674226+00:00","sha256":"07f01ce1303a19422ff576b962a865d40032c23dbf15a4a872342b0a48ee6aa1","source_family":"utility_filing","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-syracuse","subject_id":null,"entity_name":"Syracuse University Green Data Center","operator_code":null,"reported_value":450,"reported_unit":"kW","kind":"untyped_power_and_cooling","scope":"facility_unresolved","electrical_extent":"electrical_extent_unresolved","comparison":"exact","upper_value":null,"qualifier":"University wording does not resolve IT, cooling capacity or whole-building electrical input. Separate power center also serves neighboring Building621. Leave power fields null.","temporal_role":"historical_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://researchcomputing.syr.edu/contact/partnerships-and-grants/acknowledgements/","title":"syracuse_operator","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:02:51.789920+00:00","sha256":"bd3b6d4800d37b3f2cef5ad88f236c348aeef5ed85d238b88b581dad5fd71241","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-tacc-max","entity_name":"TACC J.J. Pickle site","operator_code":null,"reported_value":9,"reported_unit":"MW","kind":"maximum_capacity_scope_unresolved","scope":"center_building_extent_unresolved","qualifier":"The August 21, 2024 article reports 9 MW maximum capacity for the center. Individual buildings and central plants have not been resolved.","comparison":null,"temporal_role":"dated_report","as_of":"2024-08-21","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://news.utexas.edu/2024/08/21/the-state-of-the-supercomputers/","title":"news.utexas.edu","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:56:07.164078+00:00","sha256":"00a800b20044a78ce4c1d429a0d281c49c9e9771a05adbb5423c7f47e7a5c64e","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-tacc-actual","entity_name":"TACC J.J. Pickle site","operator_code":null,"reported_value":6,"reported_unit":"MW","kind":"reported_actual_typical_demand","scope":"center_building_extent_unresolved","qualifier":"The August 21, 2024 article reports typical consumption of about 6 MW. The center may span multiple buildings.","comparison":"approximately","temporal_role":"reported_actual","as_of":"2024-08-21","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://news.utexas.edu/2024/08/21/the-state-of-the-supercomputers/","title":"news.utexas.edu","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:56:07.164078+00:00","sha256":"00a800b20044a78ce4c1d429a0d281c49c9e9771a05adbb5423c7f47e7a5c64e","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-tacc-engineer","entity_name":"TACC Stampede expansion","operator_code":null,"reported_value":6.4,"reported_unit":"MW","kind":"data_center_electrical_design","scope":"data_center_expansion_excludes_separate_central_plant","qualifier":"The engineer reports 6.4 MW for the data-center expansion and separately identifies 2.8 MW for a central plant. No combined building capacity is assigned.","comparison":null,"temporal_role":"dated_report","as_of":null,"as_of_basis":"The source does not provide a publication or observation date.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://www.hmg-associates.com/projects-data-centers-technology.php","title":"www.hmg-associates.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:58:52.657385+00:00","sha256":"fc113420bd3f25b314a38fbcf3e184b95c5159c87cb581561725c91d0c70cf3b","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-tacc-future","entity_name":"TACC new data center","operator_code":null,"reported_value":15,"reported_unit":"MW","kind":"future_power_addition","scope":"new_data_center_location_and_input_scope_unresolved","qualifier":"The August 21, 2024 article reports another 15 MW for a future data center. Its building location and inclusive electrical boundary remain unresolved.","comparison":null,"temporal_role":"forecast","as_of":"2024-08-21","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://news.utexas.edu/2024/08/21/the-state-of-the-supercomputers/","title":"news.utexas.edu","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:56:07.164078+00:00","sha256":"00a800b20044a78ce4c1d429a0d281c49c9e9771a05adbb5423c7f47e7a5c64e","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"miso-announced-20241206:22","entity_name":"TBD (Shell Corp: SNA LLC) / Cedar Rapids, IA","operator_code":null,"reported_value":616,"reported_unit":"MW","kind":"announced_load_mw","scope":"announced_project_or_campus_unspecified","qualifier":"MISO informational compilation of public announcements. The table does not identify underlying primary facility documents.","quantity_role":"announced_load_location","comparison":"equal","season":null,"reported_period":null,"temporal_role":"informational_announcement","as_of":"2024-12-06","as_of_basis":"Printed updated December 6, 2024; HTTP modification date is not the fact date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"announced_load_location","generator_id":null,"proposed_date_native":"TBD","classification":"source_labels_data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"informational_only","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_locality_or_county_not_building"},"unresolved_conflicts":["MISO explicitly says this is not its forecast and is not intended for reliance or planning.","Full-load timing is TBD. Opening labels do not date attainment of load. Building scope is not established.","Informational lead only. Requires an underlying primary facility or utility filing before canonical power acceptance.","Informational compilation excluded from canonical quantity proposals even if an operator/locality matches."],"sources":[{"url":"https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf","title":"cdn.misoenergy.org","pdf_page":2,"published":"2024-12-06","retrieved_at":"2026-09-17T01:57:34.720498+00:00","sha256":"e313b8d0199e6046e8a9aa93e55d4cdfefc3e427a44fa0564d4d77c65d7d66f0","source_family":"iso_public_announcement_compilation","reuse_note":"Public ISO document. No open license identified; factual extraction with citation. Do not assume permission to republish the raw document.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-trg-hou1","subject_id":null,"entity_name":"TRG HOU1, 2626 Spring Cypress Road","operator_code":null,"reported_value":6,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"building","electrical_extent":"utility_supply","comparison":"exact","upper_value":null,"qualifier":"Native utility power label. Not facility input design or IT. HOU2/3 shared quantity is not allocated. Q4 2026 first-phase date is a forecast.","temporal_role":"advertised_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://www.trgdatacenters.com/infrastructure/houston-data-center/","title":"trg_houston","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:02:51.457232+00:00","sha256":"4d7c990b6784baf4d8538bc422fb5a70a0604abb3aa4201551f85859ec79bb21","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-trg-hou23","subject_id":null,"entity_name":"TRG HOU2 & 3, 2626 Spring Cypress Road","operator_code":null,"reported_value":24,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"building_group","electrical_extent":"utility_supply","comparison":"exact","upper_value":null,"qualifier":"Native utility power label. Not facility input design or IT. HOU2/3 shared quantity is not allocated. Q4 2026 first-phase date is a forecast.","temporal_role":"advertised_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://www.trgdatacenters.com/infrastructure/houston-data-center/","title":"trg_houston","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:02:51.457232+00:00","sha256":"4d7c990b6784baf4d8538bc422fb5a70a0604abb3aa4201551f85859ec79bb21","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-trg-campus","subject_id":null,"entity_name":"TRG Houston campus","operator_code":null,"reported_value":30,"reported_unit":"MW","kind":"utility_supply_capacity","scope":"campus","electrical_extent":"utility_supply","comparison":"exact","upper_value":null,"qualifier":"Native utility power label. Not facility input design or IT. HOU2/3 shared quantity is not allocated. Q4 2026 first-phase date is a forecast.","temporal_role":"advertised_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://www.trgdatacenters.com/infrastructure/houston-data-center/","title":"trg_houston","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T15:02:51.457232+00:00","sha256":"4d7c990b6784baf4d8538bc422fb5a70a0604abb3aa4201551f85859ec79bb21","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:57207:1:operable","entity_name":"Thomson Reuters Data Center Bldg ES101","operator_code":"57207","reported_value":1.2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"1","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Drive","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":14595,"quantity_cell":"P14595"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:57208:1:retired-and-canceled","entity_name":"Thomson Reuters Data Center Bldg H","operator_code":"57208","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"1","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Drive","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":4711,"quantity_cell":"P4711"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:57208:2:retired-and-canceled","entity_name":"Thomson Reuters Data Center Bldg H","operator_code":"57208","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"2","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Drive","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":4712,"quantity_cell":"P4712"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:57208:3:retired-and-canceled","entity_name":"Thomson Reuters Data Center Bldg H","operator_code":"57208","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"3","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Drive","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":4713,"quantity_cell":"P4713"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:57208:4:retired-and-canceled","entity_name":"Thomson Reuters Data Center Bldg H","operator_code":"57208","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"4","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Drive","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":4714,"quantity_cell":"P4714"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-primary04::dc-285d2a1c0ff71e18:utility_service_rating_kw","subject_id":"dc-285d2a1c0ff71e18","entity_name":"TierPoint BEL host","operator_code":null,"reported_value":9000,"reported_unit":"kW","kind":"utility_supply_capacity","scope":"operator_facility","electrical_extent":"native_redundant_utility_service_rating_per_feed_vs_aggregate_unspecified","comparison":"equal","upper_value":null,"qualifier":"Preserve the printed service rating and redundant diverse-substation context. The document does not specify whether this is per feed or aggregate; do not sum or divide. No IT or facility demand scalar. Whole-building exclusive occupancy unknown. Copyright and edition codes are not effective dates.","temporal_role":"undated_operator_technical_specification","as_of":null,"as_of_basis":"No explicit fact-effective or publication date. Retrieval, copyright and edition dates are not substituted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"source_reviewed_pending_registration","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Whole physical-host electrical boundary remains unknown. No whole-host scalar is selected.","Typed operator/suite IT or utility context only. Never included in physical-building totals."],"catalog_holds":{},"sources":[{"url":"https://web.tierpoint.com/hubfs/data-center/ne-omaha-bellevue-data-center-spec-sheet.pdf","title":"TierPoint BEL host native technical specification","pdf_page":2,"published":null,"retrieved_at":"2026-09-18T11:11:31.472133+00:00","sha256":"e234edd4b88f4b1eebd471fc2e22c18deb01264b9ca8834a24f269fff619f574","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"native_address":"1001 North Fort Crook Road","unit_count":null,"aggregate_value":null,"whole_building_exclusive_occupancy":null,"nonadditive_group":"power-primary04::dc-285d2a1c0ff71e18:utility_service_rating_kw","source_scope_review":{"review_id":"power-primary04-parent-source-review","sha256":"1cafb6097eb29597b005ca93201c400e77f21b215c9aa1ba418eb9ef0d032463","reviewed_at":"2026-09-18T11:38:16.975129+00:00","reviewer":null,"independent_audit":false}},{"id":"power-primary04::dc-e5821ecaf20b1853:utility_service_rating_kw","subject_id":"dc-e5821ecaf20b1853","entity_name":"TierPoint Omaha-Midlands Data Center","operator_code":null,"reported_value":6500,"reported_unit":"kW","kind":"utility_supply_capacity","scope":"operator_facility","electrical_extent":"native_redundant_utility_service_rating_per_feed_vs_aggregate_unspecified","comparison":"equal","upper_value":null,"qualifier":"Preserve the printed service rating and redundant diverse-substation context. The document does not specify whether this is per feed or aggregate; do not sum or divide. No IT or facility demand scalar. Whole-building exclusive occupancy unknown. Copyright and edition codes are not effective dates.","temporal_role":"undated_operator_technical_specification","as_of":null,"as_of_basis":"No explicit fact-effective or publication date. Retrieval, copyright and edition dates are not substituted.","period_start":null,"period_end":null,"measured":false,"catalog_action":"source_reviewed_pending_registration","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Whole physical-host electrical boundary remains unknown. No whole-host scalar is selected.","Typed operator/suite IT or utility context only. Never included in physical-building totals."],"catalog_holds":{},"sources":[{"url":"https://web.tierpoint.com/hubfs/data-center/ne-omaha-midlands-data-center-spec-sheet.pdf","title":"TierPoint Omaha-Midlands Data Center native technical specification","pdf_page":2,"published":null,"retrieved_at":"2026-09-18","sha256":"bcac0bdb789aca3d50ab2ada0977cb1827555ca3e70534a738ff7db665e063c5","source_family":"operator_document","reuse_note":"Factual attribution only. No right to republish source HTML, PDF bodies or images is inferred.","license":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"native_address":"11425 South 84th Street","unit_count":null,"aggregate_value":null,"whole_building_exclusive_occupancy":null,"nonadditive_group":"power-primary04::dc-e5821ecaf20b1853:utility_service_rating_kw","source_scope_review":{"review_id":"power-primary04-parent-source-review","sha256":"1cafb6097eb29597b005ca93201c400e77f21b215c9aa1ba418eb9ef0d032463","reviewed_at":"2026-09-18T11:38:16.975129+00:00","reviewer":null,"independent_audit":false}},{"id":"pjm:DOM-2024-0044:1","entity_name":"Trigon Chesterfield","operator_code":"DOM-2024-0044","reported_value":0,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"summer","reported_period":"initial","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested in service 2030-12-01. Zero initial summer is explicit, not missing data.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0044:2","entity_name":"Trigon Chesterfield","operator_code":"DOM-2024-0044","reported_value":10,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"winter","reported_period":"initial","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested in service 2030-12-01. Zero initial summer is explicit, not missing data.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0044:3","entity_name":"Trigon Chesterfield","operator_code":"DOM-2024-0044","reported_value":90,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"summer","reported_period":"2030","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested in service 2030-12-01. Zero initial summer is explicit, not missing data.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2024-0044:4","entity_name":"Trigon Chesterfield","operator_code":"DOM-2024-0044","reported_value":110,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"winter","reported_period":"2030","temporal_role":"dated_load_record","as_of":"2025-05-06","as_of_basis":"document meeting/order date","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Requested in service 2030-12-01. Zero initial summer is explicit, not missing data.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20250506/20250506-item-09---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":4,"published":"2025-05-06","retrieved_at":"2026-09-17T01:44:04.856085+00:00","sha256":"16e3104330338f4a655a2e77bfb739354edf58c85f4bf30ff42312a8a2844649","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-tacc-stampede-cup","subject_id":null,"entity_name":"UT J.J. Pickle HPC Stampede central plant","operator_code":null,"reported_value":2.8,"reported_unit":"MW","kind":"electrical_design_load","scope":"central_plant","electrical_extent":"separate_cooling_plant","comparison":"exact","upper_value":null,"qualifier":"Engineer explicitly separates data-center and central-plant electrical load. Whole existing building boundary is not established. No summing, whole-building scalar or PUE inference.","temporal_role":"historical_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://www.hmg-associates.com/projects-data-centers-technology.php","title":"hmg_engineering","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:55:52.364991+00:00","sha256":"fc113420bd3f25b314a38fbcf3e184b95c5159c87cb581561725c91d0c70cf3b","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-tacc-stampede","subject_id":null,"entity_name":"UT J.J. Pickle HPC Stampede expansion","operator_code":null,"reported_value":6.4,"reported_unit":"MW","kind":"electrical_design_load","scope":"building_component","electrical_extent":"data_center_expansion","comparison":"exact","upper_value":null,"qualifier":"Engineer explicitly separates data-center and central-plant electrical load. Whole existing building boundary is not established. No summing, whole-building scalar or PUE inference.","temporal_role":"historical_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://www.hmg-associates.com/projects-data-centers-technology.php","title":"hmg_engineering","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:55:52.364991+00:00","sha256":"fc113420bd3f25b314a38fbcf3e184b95c5159c87cb581561725c91d0c70cf3b","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-tacc-roc-cup","subject_id":null,"entity_name":"UT J.J. Pickle ROC/TACC central plant","operator_code":null,"reported_value":1.8,"reported_unit":"MW","kind":"electrical_design_load","scope":"central_plant","electrical_extent":"separate_cooling_plant","comparison":"exact","upper_value":null,"qualifier":"Engineer explicitly separates data-center and central-plant electrical load. Whole existing building boundary is not established. No summing, whole-building scalar or PUE inference.","temporal_role":"historical_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://www.hmg-associates.com/projects-data-centers-technology.php","title":"hmg_engineering","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:55:52.364991+00:00","sha256":"fc113420bd3f25b314a38fbcf3e184b95c5159c87cb581561725c91d0c70cf3b","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-tacc-roc","subject_id":null,"entity_name":"UT J.J. Pickle ROC/TACC data center portion","operator_code":null,"reported_value":2.1,"reported_unit":"MW","kind":"electrical_design_load","scope":"building_component","electrical_extent":"data_center_portion_of_office_host","comparison":"exact","upper_value":null,"qualifier":"Engineer explicitly separates data-center and central-plant electrical load. Whole existing building boundary is not established. No summing, whole-building scalar or PUE inference.","temporal_role":"historical_undated","as_of":null,"as_of_basis":"Source undated. Retrieval date is not an effective date.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://www.hmg-associates.com/projects-data-centers-technology.php","title":"hmg_engineering","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T14:55:52.364991+00:00","sha256":"fc113420bd3f25b314a38fbcf3e184b95c5159c87cb581561725c91d0c70cf3b","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-iowa-day1","subject_id":"dc-0a477bbbff914b2b","entity_name":"University of Iowa Information Technology Facility 0290","operator_code":null,"reported_value":800,"reported_unit":"kW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Day 1/2/3 are design growth stages, not dated commissioning events. Initial host has two data halls; 3.6 MW requires a future building expansion. Campus central plant cooling is external. No facility MW derived.","temporal_role":"design_stage","as_of":"2012-05","as_of_basis":"Explicit project study/design period ends 05/2012 on PDF2. This dates the historical design basis, not publication or stage energization.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://illinoisashrae.org/downloads/Tech_Award_Reports_2012/award_univ_iowa.pdf","title":"iowa_ashrae","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T15:02:51.005990+00:00","sha256":"89494e29539c9adfed0b140a6311c87c30495cf3c5e3678c50e34204d867e1f0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-iowa-day2","subject_id":"dc-0a477bbbff914b2b","entity_name":"University of Iowa Information Technology Facility 0290","operator_code":null,"reported_value":1.3,"reported_unit":"MW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Day 1/2/3 are design growth stages, not dated commissioning events. Initial host has two data halls; 3.6 MW requires a future building expansion. Campus central plant cooling is external. No facility MW derived.","temporal_role":"design_stage","as_of":"2012-05","as_of_basis":"Explicit project study/design period ends 05/2012 on PDF2. This dates the historical design basis, not publication or stage energization.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://illinoisashrae.org/downloads/Tech_Award_Reports_2012/award_univ_iowa.pdf","title":"iowa_ashrae","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T15:02:51.005990+00:00","sha256":"89494e29539c9adfed0b140a6311c87c30495cf3c5e3678c50e34204d867e1f0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-iowa-day3","subject_id":"dc-0a477bbbff914b2b","entity_name":"University of Iowa Information Technology Facility 0290","operator_code":null,"reported_value":1.7,"reported_unit":"MW","kind":"it_critical_design","scope":"building","electrical_extent":"whole_named_building","comparison":"exact","upper_value":null,"qualifier":"Day 1/2/3 are design growth stages, not dated commissioning events. Initial host has two data halls; 3.6 MW requires a future building expansion. Campus central plant cooling is external. No facility MW derived.","temporal_role":"historical_design","as_of":"2012-05","as_of_basis":"Explicit project study/design period ends 05/2012 on PDF2. This dates the historical design basis, not publication or stage energization.","period_start":null,"period_end":null,"measured":false,"catalog_action":"register_selected_field_observation","scalar_eligible":true,"selected_field":"capacity.it_mw","unresolved_conflicts":["Selected by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://illinoisashrae.org/downloads/Tech_Award_Reports_2012/award_univ_iowa.pdf","title":"iowa_ashrae","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T15:02:51.005990+00:00","sha256":"89494e29539c9adfed0b140a6311c87c30495cf3c5e3678c50e34204d867e1f0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"national-power01::nfpr01-iowa-future","subject_id":"dc-0a477bbbff914b2b","entity_name":"University of Iowa Information Technology Facility 0290","operator_code":null,"reported_value":3.6,"reported_unit":"MW","kind":"it_critical_design","scope":"future_building_expansion","electrical_extent":"expanded_physical_extent","comparison":"exact","upper_value":null,"qualifier":"Day 1/2/3 are design growth stages, not dated commissioning events. Initial host has two data halls; 3.6 MW requires a future building expansion. Campus central plant cooling is external. No facility MW derived.","temporal_role":"future_expansion","as_of":"2012-05","as_of_basis":"Explicit project study/design period ends 05/2012 on PDF2. This dates the historical design basis, not publication or stage energization.","period_start":null,"period_end":null,"measured":false,"catalog_action":"retain_typed_context_only","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Not selected for a pipeline scalar by immutable parent review."],"catalog_holds":[{"observation_id":"nfpr01-edged-ord01-1","field":"capacity.it_mw","reason":"Bare critical capacity not explicitly defined as ITload. Retain24MW as native typed context only."}],"sources":[{"url":"https://illinoisashrae.org/downloads/Tech_Award_Reports_2012/award_univ_iowa.pdf","title":"iowa_ashrae","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T15:02:51.005990+00:00","sha256":"89494e29539c9adfed0b140a6311c87c30495cf3c5e3678c50e34204d867e1f0","source_family":"operator_document","reuse_note":"company-public"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-utah-actual","entity_name":"University of Utah Downtown Data Center","operator_code":null,"reported_value":1,"reported_unit":"MW","kind":"reported_actual_demand","scope":"named_building_location_unresolved","qualifier":"The October 24, 2018 presentation reports 1 MW of current use. This historical consumption figure is not capacity.","comparison":null,"temporal_role":"reported_actual","as_of":"2018-10-24","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://it.utah.edu/node4/posts/2018/october/downtown-data-center.php","title":"it.utah.edu","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:58:52.065462+00:00","sha256":"16d8831dc82fd6384ef01895fef5904033199d407bbebfd190441a2be3424b4b","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-utah-expand","entity_name":"University of Utah Downtown Data Center","operator_code":null,"reported_value":10,"reported_unit":"MW","kind":"scalable_future_capacity","scope":"named_building_location_unresolved","qualifier":"The October 24, 2018 presentation describes a scalable ceiling of 10 MW. It does not establish installed or contracted capacity.","comparison":null,"temporal_role":"future_expandability","as_of":"2018-10-24","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://it.utah.edu/node4/posts/2018/october/downtown-data-center.php","title":"it.utah.edu","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T11:58:52.065462+00:00","sha256":"16d8831dc82fd6384ef01895fef5904033199d407bbebfd190441a2be3424b4b","source_family":"operator_document","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pnfr07::context-vmware22","entity_name":"VMware Intergate Columbia / Sabey Building B","operator_code":null,"reported_value":22000,"reported_unit":"kW","kind":"historical_total_demand_tenant_scope","scope":"2008_lessee_extent_superseded_by_partial_occupancy","qualifier":"The July 17, 2008 filing reports approximately 22,000 kW of demand. The October 2010 plan shows VMware occupying only half of Building B, so this cannot establish current whole-building demand.","comparison":"approximately","temporal_role":"historical_proposal","as_of":"2008-07-17","as_of_basis":"Date or reporting period explicitly identified in the source.","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["This observation has no reviewed building location and does not fill a building capacity field."],"sources":[{"url":"https://ecology.wa.gov/Asset-Collections/Doc-Assets/Air-quality/Data-Centers/VMare/t2vmware-tsd","title":"ecology.wa.gov","pdf_page":4,"published":null,"retrieved_at":"2026-09-17T12:00:36.510338+00:00","sha256":"b8d153b39719bdf3d1bb65d964a592f5dbea067d32994ff86bfb5388ce15ce38","source_family":"state_filing","reuse_note":"Public factual attribution. Full-document redistribution rights not assumed."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v2590:2024","entity_name":"Vantage 2590 Walsh","operator_code":null,"reported_value":19.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2024","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2590 Walsh","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v2590:2025","entity_name":"Vantage 2590 Walsh","operator_code":null,"reported_value":22.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2025","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2590 Walsh","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v2590:2026 through 2033","entity_name":"Vantage 2590 Walsh","operator_code":null,"reported_value":40.5,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2026 through 2033","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2590 Walsh","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v2820:2024","entity_name":"Vantage 2820 Northwestern","operator_code":null,"reported_value":50.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2024","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2820 Northwestern","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v2820:2025","entity_name":"Vantage 2820 Northwestern","operator_code":null,"reported_value":57.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2025","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2820 Northwestern","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v2820:2026 through 2033","entity_name":"Vantage 2820 Northwestern","operator_code":null,"reported_value":60.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2026 through 2033","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2820 Northwestern","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v2897:2024","entity_name":"Vantage 2897 Northwestern","operator_code":null,"reported_value":6.5,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2024","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2897 Northwestern","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v2897:2025 through 2033","entity_name":"Vantage 2897 Northwestern","operator_code":null,"reported_value":8.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2025 through 2033","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"2897 Northwestern","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v737:2024","entity_name":"Vantage 737 Mathew","operator_code":null,"reported_value":47.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2024","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"737 Mathew","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v737:2025","entity_name":"Vantage 737 Mathew","operator_code":null,"reported_value":66.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2025","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"737 Mathew","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v737:2026","entity_name":"Vantage 737 Mathew","operator_code":null,"reported_value":72.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2026","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"737 Mathew","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"named-service:amended_property_operating_limit_mva:v737:2027 through 2033","entity_name":"Vantage 737 Mathew","operator_code":null,"reported_value":84.0,"reported_unit":"MVA","kind":"amended_property_operating_limit_mva","scope":"customer_service_property","qualifier":"Available utility capacity at the named service property.","quantity_role":"explicit_property_allocation","comparison":null,"season":null,"reported_period":"2027 through 2033","temporal_role":"load_evidence","as_of":"2024-11-19","as_of_basis":"Council agenda date unless signed original specifies earlier effective date; exact public upload date unknown; publication date unknown","period_start":null,"period_end":null,"measured":false,"source_status_note":"council_authorized_amendment_form; blank_signature_fields_in_captured_amendment","proposed_date_native":null,"classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":"737 Mathew","city":"Santa Clara","county":"Santa Clara","state":"CA","location_precision":"primary_service_property_address","planning_area":null,"point_of_interconnection":null,"grid_region":null},"unresolved_conflicts":["Utility service schedule, not measured consumption, IT load or total building design load.","Conditions, load reduction rights and later amendments may affect delivery. A date in a schedule does not prove capacity was delivered.","No MVA-to-MW conversion. No campus-to-building allocation. Parent retains canonical promotion.","Exhibit G1 provides explicit per-address MVA columns. Portfolio total is separate and must not be added to these columns.","Council summary calls the portfolio 192.5 MW, while original and amended tables say MVA. Table units retained.","Amended table runs through 2033. No later year inferred."],"sources":[{"url":"https://santaclara.legistar.com/View.ashx?M=F&ID=13557221&GUID=186E51F9-610D-4FC1-94D8-2FDA8BA882EB","title":"santaclara.legistar.com","pdf_page":5,"published":null,"retrieved_at":"2026-09-17T03:21:38.521405+00:00","sha256":"42c76dc5cc0496c8857e8cdd598696b1f5708c775da9132ecaa7cec2164889a5","source_family":"municipal_utility_customer_service","reuse_note":"Public City of Santa Clara municipal records; no explicit open-data licence found. Retain attribution and short evidentiary excerpts."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-1fbded11ddccf9f6bc4b","entity_name":"Vantage CA3 Santa Clara","operator_code":null,"reported_value":96,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Explicit reported design value, not measured operation.","temporal_role":"proposed","as_of":"2022-08-23","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=245667-1&DocumentContentId=79830","title":"efiling.energy.ca.gov","pdf_page":10,"published":"2022-08-23","retrieved_at":"2026-09-17T02:21:12.986638+00:00","sha256":"3d6f9ed2ea29fdfdcde7ac84a2590b1b53e27251ee026d5a4fe7ef73aacdbf41","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-ae67cb780ab6e6e06c7f","entity_name":"Vantage CA3 Santa Clara","operator_code":null,"reported_value":64,"reported_unit":"MW","kind":"it_critical","scope":"building","qualifier":"Explicit reported design value, not measured operation.","temporal_role":"proposed","as_of":"2022-03-24","as_of_basis":"CEC docket filed date; not HTTP Last-Modified","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=242451&DocumentContentId=75953","title":"Final Environmental Impact Report, Part 1, March 2022 Introduction, Project Description 51 page(s)","pdf_page":37,"published":"2022-03-24","retrieved_at":"2026-09-16T22:55:28.940061+00:00","sha256":"d195c89eadcdf6132fc6afa1753eed557a53c19940f0ff62cc0ae6ed0ac48dfe","source_family":"cec_reused","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:580","entity_name":"WNY STAMP","operator_code":"0580","reported_value":300,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"Under Construction","generator_id":null,"proposed_date_native":"11-2026","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Genesee","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":10,"quantity_cell":"E10"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:580:summer","entity_name":"WNY STAMP","operator_code":"580","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Nov-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:580:winter","entity_name":"WNY STAMP","operator_code":"580","reported_value":300,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Nov-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power-f990886b8f8b00851e7c","entity_name":"Walsh Data Center","operator_code":null,"reported_value":80,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"Regulator project description; proposal design quantity, not measured demand or current operating status","temporal_role":"proposed","as_of":null,"as_of_basis":"not established; retrieval is not publication","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":["The regulator lists 651 Walsh Avenue; the map record uses 641 Walsh Avenue. This source has not been linked to that building."],"sources":[{"url":"https://www.energy.ca.gov/powerplant/backup-generating-system/walsh-data-center","title":"Walsh Data Center | California Energy Commission","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T01:42:14.759923+00:00","sha256":"e306c23e4b635d25e90411fe2f7f3a9aeac8af13ed4df6c9cb2773d8631dbde3","source_family":"cec_project","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"power2-8a0bffb1089831c97348","entity_name":"Walsh Data Center","operator_code":null,"reported_value":80,"reported_unit":"MW","kind":"facility_total_design","scope":"building","qualifier":"CEC decision explicitly states the data-center load. Parent has already accepted the Walsh/SJC37 association and 80 MW design scalar.","temporal_role":"proposed","as_of":"2020-08-21","as_of_basis":"CEC docket filed date","period_start":null,"period_end":null,"measured":false,"unresolved_conflicts":[],"sources":[{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=234408&DocumentContentId=67279","title":"efiling.energy.ca.gov","pdf_page":10,"published":"2020-08-21","retrieved_at":"2026-09-17T02:20:39.337832+00:00","sha256":"bef745bc11a065dec567ae422f352023ff447fb0edff9c45ec825eec171551ca","source_family":"cec_decision","reuse_note":"Public primary-source facts with attribution; full-document republication rights not assumed"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0072:1","entity_name":"Wesbey Drive Louisa REC","operator_code":"DOM-2025-0072","reported_value":292,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"requested_total_at_period","comparison":"equal","season":"both","reported_period":"expected load","temporal_role":"dated_load_record","as_of":"2026-01-06","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"forecast","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 270 MW is struck through and replaced by 292 MW. Requested 2029-03-01.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260106/20260106-item-07---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":20,"published":"2026-01-06","retrieved_at":"2026-09-17T01:44:51.852353+00:00","sha256":"2f238764129e7df2ba1fbc7af464705ef0354973d8fcb1ba49a4350e86f31060","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"pjm:DOM-2025-0072:2","entity_name":"Wesbey Drive Louisa REC","operator_code":"DOM-2025-0072","reported_value":270,"reported_unit":"MW","kind":"requested_customer_load_mw","scope":"customer_request_or_campus_not_building","qualifier":"Transmission-owner customer load request published by PJM. No granted service or actual demand established.","quantity_role":"superseded_request","comparison":"equal","season":"both","reported_period":"prior request","temporal_role":"dated_load_record","as_of":"2026-01-06","as_of_basis":"meeting date printed in document","period_start":null,"period_end":null,"measured":false,"source_status_note":"superseded","generator_id":null,"proposed_date_native":null,"classification":"explicit_data_center_customer_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"named_delivery_point_area_not_customer_building"},"unresolved_conflicts":["Visual review: 270 MW is struck through and replaced by 292 MW. Requested 2029-03-01.","Customer unnamed. A substation name or nearby roof cannot identify the data-center customer.","Seasonal values and ramp points must not be summed. Strike-through quantities remain superseded history.","No customer identity. Delivery point maps are not building locators."],"sources":[{"url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260106/20260106-item-07---dom-supplemental-projects.pdf","title":"www.pjm.com","pdf_page":20,"published":"2026-01-06","retrieved_at":"2026-09-17T01:44:51.852353+00:00","sha256":"2f238764129e7df2ba1fbc7af464705ef0354973d8fcb1ba49a4350e86f31060","source_family":"iso_transmission_customer_load_request","reuse_note":"public primary source; factual extraction with citation; no license to republish document assumed","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:54294:1:operable","entity_name":"West Group Data Center","operator_code":"54294","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"1","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":10363,"quantity_cell":"P10363"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:54294:2178:retired-and-canceled","entity_name":"West Group Data Center","operator_code":"54294","reported_value":1.5,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"2178","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":3857,"quantity_cell":"P3857"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:54294:2179:retired-and-canceled","entity_name":"West Group Data Center","operator_code":"54294","reported_value":1.5,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"2179","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":3858,"quantity_cell":"P3858"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:54294:2180:retired-and-canceled","entity_name":"West Group Data Center","operator_code":"54294","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"2180","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":3859,"quantity_cell":"P3859"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:54294:2:operable","entity_name":"West Group Data Center","operator_code":"54294","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"2","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":10364,"quantity_cell":"P10364"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:54294:3:operable","entity_name":"West Group Data Center","operator_code":"54294","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"3","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":10365,"quantity_cell":"P10365"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:54294:4:operable","entity_name":"West Group Data Center","operator_code":"54294","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SB: Standby/Backup - available for service but not normally used (has little or no generation during the year) for this reporting period.","generator_id":"4","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Operable","row":10366,"quantity_cell":"P10366"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:56247:1:retired-and-canceled","entity_name":"West Group Data Center F","operator_code":"56247","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"1","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":4384,"quantity_cell":"P4384"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:56247:2:retired-and-canceled","entity_name":"West Group Data Center F","operator_code":"56247","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"2","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":4385,"quantity_cell":"P4385"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:56247:3:retired-and-canceled","entity_name":"West Group Data Center F","operator_code":"56247","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"3","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":4386,"quantity_cell":"P4386"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"eia860-2025:56247:4:retired-and-canceled","entity_name":"West Group Data Center F","operator_code":"56247","reported_value":2,"reported_unit":"MW","kind":"generator_nameplate_mw","scope":"individual_generating_unit","qualifier":"Electrical generator nameplate capacity. Not data-center demand, IT capacity or a service contract.","quantity_role":"generation_capacity","comparison":"equal","season":null,"reported_period":null,"temporal_role":"generator_record","as_of":"2025","as_of_basis":"Captured EIA-860 index release label: September 10, 2026, Final 2025 data. Data reporting year is 2025.","period_start":null,"period_end":null,"measured":false,"source_status_note":"RE: Retired - no longer in service and not expected to be returned to service.","generator_id":"4","proposed_date_native":null,"classification":"associated_generation_not_data_center_load","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"generator_context","location_context":{"address":"610 Opperman Dr","city":"Eagan","county":"Dakota","state":"MN","location_precision":"EIA_reported_generating_plant_location_not_building_coordinate"},"unresolved_conflicts":["Do not sum generators into facility MW. Standby, fuel-cell and solar generation do not establish customer demand.","A generator operating year is not data-center opening. Retired units are not current capacity.","EIA plant coordinates can be approximate or erroneous. Address agreement does not validate the coordinate.","Generator capacities remain separate. No facility MW, IT MW, opening year or coordinate proposal."],"sources":[{"url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","title":"www.eia.gov","pdf_page":null,"published":"2026-09-10","retrieved_at":"2026-09-17T01:59:11.470069+00:00","sha256":"2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba","source_family":"federal_generator_inventory","reuse_note":"EIA U.S. government data are public domain with attribution. Third-party content and logos can have separate restrictions. See captured eia-copyright source.","archive_member":"3_1_Generator_Y2025.xlsx","archive_member_sha256":"931e1ed0be2c6706794c196f158f779b5c8a32d08c61d748a823dfc25a3201a8","sheet":"Retired and Canceled","row":4387,"quantity_cell":"P4387"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-queue:1732","entity_name":"Wulf Compute Data Center II","operator_code":"1732","reported_value":250,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"07-2030","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Niagara","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":43,"quantity_cell":"E43"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1732:summer","entity_name":"Wulf Compute Data Center II","operator_code":"1732","reported_value":250,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"summer","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jun-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"nyiso-goldbook-2026:1732:winter","entity_name":"Wulf Compute Data Center II","operator_code":"1732","reported_value":250,"reported_unit":"MW","kind":"seasonal_requested_load_mw","scope":"interconnection_load_project","qualifier":"Table IV-7 seasonal request MW. Footnote 3 says these are queue values. Not necessarily baseline forecast or measured consumption.","quantity_role":"request_boundary_unspecified","comparison":"equal","season":"winter","reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-03-15","as_of_basis":"Title pages state Released April 2026. Report says data as of March 15, 2026 unless otherwise noted.","period_start":null,"period_end":null,"measured":false,"source_status_note":"load_interconnection_request_as_reported_in_2026_Gold_Book","generator_id":null,"proposed_date_native":"Jun-26","classification":"data_center","classification_basis":"screening from later queue end-use; Gold Book does not print end-use","category":"load_research","location_context":{"address":null,"city":null,"county":null,"state":null,"location_precision":"reported_ISO_zone_not_building"},"unresolved_conflicts":["Proposed in-service dates are not actual opening dates. Seasonal MW must remain separate.","Rows with notes 4-8 are increments, not the resulting facility total. Phase/campus/building scope is unresolved.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/2226333/2026-Gold-Book-Public.pdf","title":"www.nyiso.com","pdf_page":136,"published":"2026-04","retrieved_at":"2026-09-17T02:00:21.821861+00:00","sha256":"43865c1cbe38ca2ef4c8319d11454881de2b9dde3e48867dbbd2e94855b908bf","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":null,"row":null,"quantity_cell":null}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false},{"id":"regional:wurldwide-historical-peak","subject_id":"regional:wurldwide","entity_name":"Wurldwide LLC El Paso data center campus","operator_code":null,"reported_value":100,"reported_unit":"MW","kind":"historical_expected_peak","source_metric":"wurldwide-historical-peak","scope":"customer_campus","qualifier":"Historical lower bound in proposed rate order.","quantity_role":"historical_expected_peak","comparison":"greater_than","season":null,"reported_period":"when fully operational, as proposed June 2025","temporal_role":"load_evidence","as_of":"2025-06-10","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"proposed_order_not_final","execution_status":"proposal_not_executed_agreement","nonadditive_group":"wurldwide-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"El Paso","state":"TX","location_precision":"primary_property_road_boundaries"},"unresolved_conflicts":["Strict greater-than comparator. Not an exact 100 MW service entitlement.","Later evidence states 1,000 MW commitment. Do not sum historical and later descriptions.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://interchange.puc.texas.gov/Documents/56903_51_1506757.PDF","title":"interchange.puc.texas.gov","pdf_page":4,"published":"2025-06-10","retrieved_at":"2026-09-17T03:57:50.887078+00:00","sha256":"055b68babb82a5d79dccfe1e9c78c88c81b667a611570f28c74918b14cb635cd","source_family":"regulatory_filing","reuse_note":"Public primary document. No open republication license asserted. Retain local source bytes; publish attributed facts and short excerpts only."},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","reuse_note":"Public primary document. No open license identified; factual excerpts and attribution only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-wurldwide","note":"The City of El Paso explicitly identifies Meta as the Wurldwide project. The city notice describes property north of Stan Roberts Sr Avenue and west of US Highway 54. TCEQ identifies regulated site RN112388186. These sources establish campus context, without identifying an individual building.","scope":"primary_campus_property","sources":[{"url":"https://www.elpasotexas.gov/data-centers","title":"www.elpasotexas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:47:12.390881+00:00","sha256":"3267c201dc70d2259442c4caf2abc38f669269af218785fb462ebf8a71cc80f2","source_family":"public_primary_identity_source","as_of":null},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","as_of":null},{"url":"https://www.elpasotexas.gov/assets/Documents/CoEP/Economic-Development/Other/312-Agreement-Notice-updated.pdf","title":"www.elpasotexas.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:47:12.335431+00:00","sha256":"cab9115ba565b4583f0859f9d778479e3c8e1ba93cb4f155f5180eb3d7cae3ac","source_family":"public_primary_identity_source","as_of":"2023-12-05"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_DOC_INFO&IsExternalSearch=1&coreContentOnly=1&dDocName=8267038&dID=9544397&searchType=External","title":"records.tceq.texas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:45:35.290770+00:00","sha256":"2a75b1df3e67d81178aa6cabb4e1e59a13a0c418680b12047f2f58cc1b4dbcb8","source_family":"public_primary_identity_source","as_of":"2026-02-20"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9544397&Rendition=Web&searchType=External","title":"records.tceq.texas.gov","pdf_page":1,"published":"2026-02-20","retrieved_at":"2026-09-17T04:47:16.203425+00:00","sha256":"327ea44681d8e9659f0fe7d8ed00a497752b88788077204ab6e23d8f59f47391","source_family":"public_primary_identity_source","as_of":"2026-02-20"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:wurldwide-region-one","subject_id":"regional:wurldwide","entity_name":"Wurldwide LLC El Paso data center campus","operator_code":null,"reported_value":220,"reported_unit":"MW","kind":"load_region_component","source_metric":"wurldwide-region-one","scope":"customer_campus_load_region","qualifier":"Utility testimony describes first load region; not a physical building allocation.","quantity_role":"load_region_component","comparison":"up_to_approximately","season":null,"reported_period":"Region 1 as described June 23, 2026","temporal_role":"load_evidence","as_of":"2026-06-23","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"filed_utility_testimony","execution_status":"load_component_not_separate_contract","nonadditive_group":"wurldwide-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"El Paso","state":"TX","location_precision":"primary_property_road_boundaries"},"unresolved_conflicts":["Source says up to approximately the first 220 MW. No distinct building or roof identity established.","Component of the same Wurldwide campus, not additive to its total.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://interchange.puc.texas.gov/Documents/59076_128_1659391.PDF","title":"interchange.puc.texas.gov","pdf_page":11,"published":"2026-06-23","retrieved_at":"2026-09-17T04:00:15.972325+00:00","sha256":"69665072c0e0a957dc1b17feee8efda1f7aa7a14a836e0ab4817c768687f656e","source_family":"regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","reuse_note":"Public primary document. No open license identified; factual excerpts and attribution only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-wurldwide","note":"The City of El Paso explicitly identifies Meta as the Wurldwide project. The city notice describes property north of Stan Roberts Sr Avenue and west of US Highway 54. TCEQ identifies regulated site RN112388186. These sources establish campus context, without identifying an individual building.","scope":"primary_campus_property","sources":[{"url":"https://www.elpasotexas.gov/data-centers","title":"www.elpasotexas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:47:12.390881+00:00","sha256":"3267c201dc70d2259442c4caf2abc38f669269af218785fb462ebf8a71cc80f2","source_family":"public_primary_identity_source","as_of":null},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","as_of":null},{"url":"https://www.elpasotexas.gov/assets/Documents/CoEP/Economic-Development/Other/312-Agreement-Notice-updated.pdf","title":"www.elpasotexas.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:47:12.335431+00:00","sha256":"cab9115ba565b4583f0859f9d778479e3c8e1ba93cb4f155f5180eb3d7cae3ac","source_family":"public_primary_identity_source","as_of":"2023-12-05"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_DOC_INFO&IsExternalSearch=1&coreContentOnly=1&dDocName=8267038&dID=9544397&searchType=External","title":"records.tceq.texas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:45:35.290770+00:00","sha256":"2a75b1df3e67d81178aa6cabb4e1e59a13a0c418680b12047f2f58cc1b4dbcb8","source_family":"public_primary_identity_source","as_of":"2026-02-20"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9544397&Rendition=Web&searchType=External","title":"records.tceq.texas.gov","pdf_page":1,"published":"2026-02-20","retrieved_at":"2026-09-17T04:47:16.203425+00:00","sha256":"327ea44681d8e9659f0fe7d8ed00a497752b88788077204ab6e23d8f59f47391","source_family":"public_primary_identity_source","as_of":"2026-02-20"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:wurldwide-region-two","subject_id":"regional:wurldwide","entity_name":"Wurldwide LLC El Paso data center campus","operator_code":null,"reported_value":220,"reported_unit":"MW","kind":"load_region_component","source_metric":"wurldwide-region-two","scope":"customer_campus_load_region","qualifier":"Utility testimony explicitly calls Region 2 the second 220 MW of data center demand.","quantity_role":"load_region_component","comparison":"equal","season":null,"reported_period":"Region 2 as described June 23, 2026","temporal_role":"load_evidence","as_of":"2026-06-23","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"filed_utility_testimony","execution_status":"load_component_not_separate_contract","nonadditive_group":"wurldwide-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"El Paso","state":"TX","location_precision":"primary_property_road_boundaries"},"unresolved_conflicts":["This is a demand increment, not the McCloud generating plant rating.","No building correspondence proved. Do not add to whole-campus values.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://interchange.puc.texas.gov/Documents/59076_128_1659391.PDF","title":"interchange.puc.texas.gov","pdf_page":13,"published":"2026-06-23","retrieved_at":"2026-09-17T04:00:15.972325+00:00","sha256":"69665072c0e0a957dc1b17feee8efda1f7aa7a14a836e0ab4817c768687f656e","source_family":"regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","reuse_note":"Public primary document. No open license identified; factual excerpts and attribution only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-wurldwide","note":"The City of El Paso explicitly identifies Meta as the Wurldwide project. The city notice describes property north of Stan Roberts Sr Avenue and west of US Highway 54. TCEQ identifies regulated site RN112388186. These sources establish campus context, without identifying an individual building.","scope":"primary_campus_property","sources":[{"url":"https://www.elpasotexas.gov/data-centers","title":"www.elpasotexas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:47:12.390881+00:00","sha256":"3267c201dc70d2259442c4caf2abc38f669269af218785fb462ebf8a71cc80f2","source_family":"public_primary_identity_source","as_of":null},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","as_of":null},{"url":"https://www.elpasotexas.gov/assets/Documents/CoEP/Economic-Development/Other/312-Agreement-Notice-updated.pdf","title":"www.elpasotexas.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:47:12.335431+00:00","sha256":"cab9115ba565b4583f0859f9d778479e3c8e1ba93cb4f155f5180eb3d7cae3ac","source_family":"public_primary_identity_source","as_of":"2023-12-05"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_DOC_INFO&IsExternalSearch=1&coreContentOnly=1&dDocName=8267038&dID=9544397&searchType=External","title":"records.tceq.texas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:45:35.290770+00:00","sha256":"2a75b1df3e67d81178aa6cabb4e1e59a13a0c418680b12047f2f58cc1b4dbcb8","source_family":"public_primary_identity_source","as_of":"2026-02-20"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9544397&Rendition=Web&searchType=External","title":"records.tceq.texas.gov","pdf_page":1,"published":"2026-02-20","retrieved_at":"2026-09-17T04:47:16.203425+00:00","sha256":"327ea44681d8e9659f0fe7d8ed00a497752b88788077204ab6e23d8f59f47391","source_family":"public_primary_identity_source","as_of":"2026-02-20"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:wurldwide-forecast-2026","subject_id":"regional:wurldwide","entity_name":"Wurldwide LLC El Paso data center campus","operator_code":null,"reported_value":16,"reported_unit":"MW","kind":"utility_customer_load_forecast","source_metric":"annual_customer_load_forecast","scope":"customer_campus","qualifier":"Wurldwide row in the utility Texas load forecast. System planning value, not metered demand or contractual entitlement.","quantity_role":"utility_customer_load_forecast","comparison":"equal","season":null,"reported_period":"2026","temporal_role":"load_evidence","as_of":"2026-06-23","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"filed_utility_forecast","execution_status":"forecast_not_contract","nonadditive_group":"wurldwide-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"El Paso","state":"TX","location_precision":"primary_property_road_boundaries"},"unresolved_conflicts":["The 1,005 MW modeled value differs from the 1,000 MW commitment. No adjustment factor is stated; no reconciliation or summation is inferred.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://interchange.puc.texas.gov/Documents/59076_129_1659399.PDF","title":"interchange.puc.texas.gov","pdf_page":7,"published":"2026-06-23","retrieved_at":"2026-09-17T04:00:16.371156+00:00","sha256":"f25aac2bc42decac82d026769ce511c688e66ab57d5bd5f6c6fbd0c5aa517c96","source_family":"regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","reuse_note":"Public primary document. No open license identified; factual excerpts and attribution only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-wurldwide","note":"The City of El Paso explicitly identifies Meta as the Wurldwide project. The city notice describes property north of Stan Roberts Sr Avenue and west of US Highway 54. TCEQ identifies regulated site RN112388186. These sources establish campus context, without identifying an individual building.","scope":"primary_campus_property","sources":[{"url":"https://www.elpasotexas.gov/data-centers","title":"www.elpasotexas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:47:12.390881+00:00","sha256":"3267c201dc70d2259442c4caf2abc38f669269af218785fb462ebf8a71cc80f2","source_family":"public_primary_identity_source","as_of":null},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","as_of":null},{"url":"https://www.elpasotexas.gov/assets/Documents/CoEP/Economic-Development/Other/312-Agreement-Notice-updated.pdf","title":"www.elpasotexas.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:47:12.335431+00:00","sha256":"cab9115ba565b4583f0859f9d778479e3c8e1ba93cb4f155f5180eb3d7cae3ac","source_family":"public_primary_identity_source","as_of":"2023-12-05"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_DOC_INFO&IsExternalSearch=1&coreContentOnly=1&dDocName=8267038&dID=9544397&searchType=External","title":"records.tceq.texas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:45:35.290770+00:00","sha256":"2a75b1df3e67d81178aa6cabb4e1e59a13a0c418680b12047f2f58cc1b4dbcb8","source_family":"public_primary_identity_source","as_of":"2026-02-20"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9544397&Rendition=Web&searchType=External","title":"records.tceq.texas.gov","pdf_page":1,"published":"2026-02-20","retrieved_at":"2026-09-17T04:47:16.203425+00:00","sha256":"327ea44681d8e9659f0fe7d8ed00a497752b88788077204ab6e23d8f59f47391","source_family":"public_primary_identity_source","as_of":"2026-02-20"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:wurldwide-forecast-2027","subject_id":"regional:wurldwide","entity_name":"Wurldwide LLC El Paso data center campus","operator_code":null,"reported_value":286,"reported_unit":"MW","kind":"utility_customer_load_forecast","source_metric":"annual_customer_load_forecast","scope":"customer_campus","qualifier":"Wurldwide row in the utility Texas load forecast. System planning value, not metered demand or contractual entitlement.","quantity_role":"utility_customer_load_forecast","comparison":"equal","season":null,"reported_period":"2027","temporal_role":"load_evidence","as_of":"2026-06-23","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"filed_utility_forecast","execution_status":"forecast_not_contract","nonadditive_group":"wurldwide-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"El Paso","state":"TX","location_precision":"primary_property_road_boundaries"},"unresolved_conflicts":["The 1,005 MW modeled value differs from the 1,000 MW commitment. No adjustment factor is stated; no reconciliation or summation is inferred.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://interchange.puc.texas.gov/Documents/59076_129_1659399.PDF","title":"interchange.puc.texas.gov","pdf_page":7,"published":"2026-06-23","retrieved_at":"2026-09-17T04:00:16.371156+00:00","sha256":"f25aac2bc42decac82d026769ce511c688e66ab57d5bd5f6c6fbd0c5aa517c96","source_family":"regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","reuse_note":"Public primary document. No open license identified; factual excerpts and attribution only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-wurldwide","note":"The City of El Paso explicitly identifies Meta as the Wurldwide project. The city notice describes property north of Stan Roberts Sr Avenue and west of US Highway 54. TCEQ identifies regulated site RN112388186. These sources establish campus context, without identifying an individual building.","scope":"primary_campus_property","sources":[{"url":"https://www.elpasotexas.gov/data-centers","title":"www.elpasotexas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:47:12.390881+00:00","sha256":"3267c201dc70d2259442c4caf2abc38f669269af218785fb462ebf8a71cc80f2","source_family":"public_primary_identity_source","as_of":null},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","as_of":null},{"url":"https://www.elpasotexas.gov/assets/Documents/CoEP/Economic-Development/Other/312-Agreement-Notice-updated.pdf","title":"www.elpasotexas.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:47:12.335431+00:00","sha256":"cab9115ba565b4583f0859f9d778479e3c8e1ba93cb4f155f5180eb3d7cae3ac","source_family":"public_primary_identity_source","as_of":"2023-12-05"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_DOC_INFO&IsExternalSearch=1&coreContentOnly=1&dDocName=8267038&dID=9544397&searchType=External","title":"records.tceq.texas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:45:35.290770+00:00","sha256":"2a75b1df3e67d81178aa6cabb4e1e59a13a0c418680b12047f2f58cc1b4dbcb8","source_family":"public_primary_identity_source","as_of":"2026-02-20"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9544397&Rendition=Web&searchType=External","title":"records.tceq.texas.gov","pdf_page":1,"published":"2026-02-20","retrieved_at":"2026-09-17T04:47:16.203425+00:00","sha256":"327ea44681d8e9659f0fe7d8ed00a497752b88788077204ab6e23d8f59f47391","source_family":"public_primary_identity_source","as_of":"2026-02-20"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:wurldwide-forecast-2028","subject_id":"regional:wurldwide","entity_name":"Wurldwide LLC El Paso data center campus","operator_code":null,"reported_value":826,"reported_unit":"MW","kind":"utility_customer_load_forecast","source_metric":"annual_customer_load_forecast","scope":"customer_campus","qualifier":"Wurldwide row in the utility Texas load forecast. System planning value, not metered demand or contractual entitlement.","quantity_role":"utility_customer_load_forecast","comparison":"equal","season":null,"reported_period":"2028","temporal_role":"load_evidence","as_of":"2026-06-23","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"filed_utility_forecast","execution_status":"forecast_not_contract","nonadditive_group":"wurldwide-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"El Paso","state":"TX","location_precision":"primary_property_road_boundaries"},"unresolved_conflicts":["The 1,005 MW modeled value differs from the 1,000 MW commitment. No adjustment factor is stated; no reconciliation or summation is inferred.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://interchange.puc.texas.gov/Documents/59076_129_1659399.PDF","title":"interchange.puc.texas.gov","pdf_page":7,"published":"2026-06-23","retrieved_at":"2026-09-17T04:00:16.371156+00:00","sha256":"f25aac2bc42decac82d026769ce511c688e66ab57d5bd5f6c6fbd0c5aa517c96","source_family":"regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","reuse_note":"Public primary document. No open license identified; factual excerpts and attribution only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-wurldwide","note":"The City of El Paso explicitly identifies Meta as the Wurldwide project. The city notice describes property north of Stan Roberts Sr Avenue and west of US Highway 54. TCEQ identifies regulated site RN112388186. These sources establish campus context, without identifying an individual building.","scope":"primary_campus_property","sources":[{"url":"https://www.elpasotexas.gov/data-centers","title":"www.elpasotexas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:47:12.390881+00:00","sha256":"3267c201dc70d2259442c4caf2abc38f669269af218785fb462ebf8a71cc80f2","source_family":"public_primary_identity_source","as_of":null},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","as_of":null},{"url":"https://www.elpasotexas.gov/assets/Documents/CoEP/Economic-Development/Other/312-Agreement-Notice-updated.pdf","title":"www.elpasotexas.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:47:12.335431+00:00","sha256":"cab9115ba565b4583f0859f9d778479e3c8e1ba93cb4f155f5180eb3d7cae3ac","source_family":"public_primary_identity_source","as_of":"2023-12-05"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_DOC_INFO&IsExternalSearch=1&coreContentOnly=1&dDocName=8267038&dID=9544397&searchType=External","title":"records.tceq.texas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:45:35.290770+00:00","sha256":"2a75b1df3e67d81178aa6cabb4e1e59a13a0c418680b12047f2f58cc1b4dbcb8","source_family":"public_primary_identity_source","as_of":"2026-02-20"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9544397&Rendition=Web&searchType=External","title":"records.tceq.texas.gov","pdf_page":1,"published":"2026-02-20","retrieved_at":"2026-09-17T04:47:16.203425+00:00","sha256":"327ea44681d8e9659f0fe7d8ed00a497752b88788077204ab6e23d8f59f47391","source_family":"public_primary_identity_source","as_of":"2026-02-20"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:wurldwide-forecast-2029","subject_id":"regional:wurldwide","entity_name":"Wurldwide LLC El Paso data center campus","operator_code":null,"reported_value":1005,"reported_unit":"MW","kind":"utility_customer_load_forecast","source_metric":"annual_customer_load_forecast","scope":"customer_campus","qualifier":"Wurldwide row in the utility Texas load forecast. System planning value, not metered demand or contractual entitlement.","quantity_role":"utility_customer_load_forecast","comparison":"equal","season":null,"reported_period":"2029 through 2043","temporal_role":"load_evidence","as_of":"2026-06-23","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"filed_utility_forecast","execution_status":"forecast_not_contract","nonadditive_group":"wurldwide-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"El Paso","state":"TX","location_precision":"primary_property_road_boundaries"},"unresolved_conflicts":["The 1,005 MW modeled value differs from the 1,000 MW commitment. No adjustment factor is stated; no reconciliation or summation is inferred.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://interchange.puc.texas.gov/Documents/59076_129_1659399.PDF","title":"interchange.puc.texas.gov","pdf_page":7,"published":"2026-06-23","retrieved_at":"2026-09-17T04:00:16.371156+00:00","sha256":"f25aac2bc42decac82d026769ce511c688e66ab57d5bd5f6c6fbd0c5aa517c96","source_family":"regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","reuse_note":"Public primary document. No open license identified; factual excerpts and attribution only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-wurldwide","note":"The City of El Paso explicitly identifies Meta as the Wurldwide project. The city notice describes property north of Stan Roberts Sr Avenue and west of US Highway 54. TCEQ identifies regulated site RN112388186. These sources establish campus context, without identifying an individual building.","scope":"primary_campus_property","sources":[{"url":"https://www.elpasotexas.gov/data-centers","title":"www.elpasotexas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:47:12.390881+00:00","sha256":"3267c201dc70d2259442c4caf2abc38f669269af218785fb462ebf8a71cc80f2","source_family":"public_primary_identity_source","as_of":null},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","as_of":null},{"url":"https://www.elpasotexas.gov/assets/Documents/CoEP/Economic-Development/Other/312-Agreement-Notice-updated.pdf","title":"www.elpasotexas.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:47:12.335431+00:00","sha256":"cab9115ba565b4583f0859f9d778479e3c8e1ba93cb4f155f5180eb3d7cae3ac","source_family":"public_primary_identity_source","as_of":"2023-12-05"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_DOC_INFO&IsExternalSearch=1&coreContentOnly=1&dDocName=8267038&dID=9544397&searchType=External","title":"records.tceq.texas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:45:35.290770+00:00","sha256":"2a75b1df3e67d81178aa6cabb4e1e59a13a0c418680b12047f2f58cc1b4dbcb8","source_family":"public_primary_identity_source","as_of":"2026-02-20"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9544397&Rendition=Web&searchType=External","title":"records.tceq.texas.gov","pdf_page":1,"published":"2026-02-20","retrieved_at":"2026-09-17T04:47:16.203425+00:00","sha256":"327ea44681d8e9659f0fe7d8ed00a497752b88788077204ab6e23d8f59f47391","source_family":"public_primary_identity_source","as_of":"2026-02-20"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:wurldwide-forecast-2044","subject_id":"regional:wurldwide","entity_name":"Wurldwide LLC El Paso data center campus","operator_code":null,"reported_value":986,"reported_unit":"MW","kind":"utility_customer_load_forecast","source_metric":"annual_customer_load_forecast","scope":"customer_campus","qualifier":"Wurldwide row in the utility Texas load forecast. System planning value, not metered demand or contractual entitlement.","quantity_role":"utility_customer_load_forecast","comparison":"equal","season":null,"reported_period":"2044 through 2045","temporal_role":"load_evidence","as_of":"2026-06-23","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"filed_utility_forecast","execution_status":"forecast_not_contract","nonadditive_group":"wurldwide-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"El Paso","state":"TX","location_precision":"primary_property_road_boundaries"},"unresolved_conflicts":["The 1,005 MW modeled value differs from the 1,000 MW commitment. No adjustment factor is stated; no reconciliation or summation is inferred.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://interchange.puc.texas.gov/Documents/59076_129_1659399.PDF","title":"interchange.puc.texas.gov","pdf_page":7,"published":"2026-06-23","retrieved_at":"2026-09-17T04:00:16.371156+00:00","sha256":"f25aac2bc42decac82d026769ce511c688e66ab57d5bd5f6c6fbd0c5aa517c96","source_family":"regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","reuse_note":"Public primary document. No open license identified; factual excerpts and attribution only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-wurldwide","note":"The City of El Paso explicitly identifies Meta as the Wurldwide project. The city notice describes property north of Stan Roberts Sr Avenue and west of US Highway 54. TCEQ identifies regulated site RN112388186. These sources establish campus context, without identifying an individual building.","scope":"primary_campus_property","sources":[{"url":"https://www.elpasotexas.gov/data-centers","title":"www.elpasotexas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:47:12.390881+00:00","sha256":"3267c201dc70d2259442c4caf2abc38f669269af218785fb462ebf8a71cc80f2","source_family":"public_primary_identity_source","as_of":null},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","as_of":null},{"url":"https://www.elpasotexas.gov/assets/Documents/CoEP/Economic-Development/Other/312-Agreement-Notice-updated.pdf","title":"www.elpasotexas.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:47:12.335431+00:00","sha256":"cab9115ba565b4583f0859f9d778479e3c8e1ba93cb4f155f5180eb3d7cae3ac","source_family":"public_primary_identity_source","as_of":"2023-12-05"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_DOC_INFO&IsExternalSearch=1&coreContentOnly=1&dDocName=8267038&dID=9544397&searchType=External","title":"records.tceq.texas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:45:35.290770+00:00","sha256":"2a75b1df3e67d81178aa6cabb4e1e59a13a0c418680b12047f2f58cc1b4dbcb8","source_family":"public_primary_identity_source","as_of":"2026-02-20"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9544397&Rendition=Web&searchType=External","title":"records.tceq.texas.gov","pdf_page":1,"published":"2026-02-20","retrieved_at":"2026-09-17T04:47:16.203425+00:00","sha256":"327ea44681d8e9659f0fe7d8ed00a497752b88788077204ab6e23d8f59f47391","source_family":"public_primary_identity_source","as_of":"2026-02-20"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"regional:wurldwide-amended-commitment","subject_id":"regional:wurldwide","entity_name":"Wurldwide LLC El Paso data center campus","operator_code":null,"reported_value":1000,"reported_unit":"MW","kind":"utility_reported_contract_commitment","source_metric":"wurldwide-amended-commitment","scope":"customer_campus","qualifier":"Sworn utility testimony reports a signed amended ESA and customer peak demand commitment.","quantity_role":"utility_reported_contract_commitment","comparison":"equal","season":null,"reported_period":"by end of 2029","temporal_role":"load_evidence","as_of":"2026-06-23","as_of_basis":"Printed filing or publication date; null if no source date.","period_start":null,"period_end":null,"measured":false,"source_status_note":"filed_sworn_utility_testimony","execution_status":"signed_amended_esa_reported_actual_agreement_not_captured","nonadditive_group":"wurldwide-campus","classification":"data_center","classification_basis":"source_native","category":"load_evidence","is_default_dc_load_evidence":true,"location_context":{"address":null,"city":"El Paso","state":"TX","location_precision":"primary_property_road_boundaries"},"unresolved_conflicts":["The Schedule 27 ESA attached to the April application is an unnamed blank form. It is not the signed amended Wurldwide agreement.","No current delivered or metered load confirmed. Forecast table 1,005 MW is retained separately without explaining the difference.","Customer or campus scope is not an individual building allocation. No power scalar promotion.","Source dates and planned delivery dates are not proof of present operation or actual consumption."],"sources":[{"url":"https://interchange.puc.texas.gov/Documents/59076_128_1659391.PDF","title":"interchange.puc.texas.gov","pdf_page":10,"published":"2026-06-23","retrieved_at":"2026-09-17T04:00:15.972325+00:00","sha256":"69665072c0e0a957dc1b17feee8efda1f7aa7a14a836e0ab4817c768687f656e","source_family":"regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://interchange.puc.texas.gov/Documents/59611_1_1617202.PDF","title":"interchange.puc.texas.gov","pdf_page":4,"published":"2026-04-07","retrieved_at":"2026-09-17T04:00:55.125299+00:00","sha256":"787330f6293da3d8c1f5b80c102207090eb97fdbcc2be05c606a63054bbdf793","source_family":"regulatory_filing","reuse_note":"Public primary source; no open republication license asserted."},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","reuse_note":"Public primary document. No open license identified; factual excerpts and attribution only."}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"research_context":{"identity":[{"id":"regional-identity:association-wurldwide","note":"The City of El Paso explicitly identifies Meta as the Wurldwide project. The city notice describes property north of Stan Roberts Sr Avenue and west of US Highway 54. TCEQ identifies regulated site RN112388186. These sources establish campus context, without identifying an individual building.","scope":"primary_campus_property","sources":[{"url":"https://www.elpasotexas.gov/data-centers","title":"www.elpasotexas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:47:12.390881+00:00","sha256":"3267c201dc70d2259442c4caf2abc38f669269af218785fb462ebf8a71cc80f2","source_family":"public_primary_identity_source","as_of":null},{"url":"https://elpasotexas.legistar.com/View.ashx?GUID=13BF61E7-9C0D-4214-82D8-E0A1D3FFEB66&ID=12538531&M=F","title":"elpasotexas.legistar.com","pdf_page":1,"published":"2023-12-04","retrieved_at":"2026-09-17T04:07:50.725544+00:00","sha256":"a6245a57c549d8d6043f793c2cd09b228b58c37fd49321cbc81536f4b70de4ee","source_family":"municipal_executed_agreement","as_of":null},{"url":"https://www.elpasotexas.gov/assets/Documents/CoEP/Economic-Development/Other/312-Agreement-Notice-updated.pdf","title":"www.elpasotexas.gov","pdf_page":1,"published":null,"retrieved_at":"2026-09-17T04:47:12.335431+00:00","sha256":"cab9115ba565b4583f0859f9d778479e3c8e1ba93cb4f155f5180eb3d7cae3ac","source_family":"public_primary_identity_source","as_of":"2023-12-05"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_DOC_INFO&IsExternalSearch=1&coreContentOnly=1&dDocName=8267038&dID=9544397&searchType=External","title":"records.tceq.texas.gov","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T04:45:35.290770+00:00","sha256":"2a75b1df3e67d81178aa6cabb4e1e59a13a0c418680b12047f2f58cc1b4dbcb8","source_family":"public_primary_identity_source","as_of":"2026-02-20"},{"url":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9544397&Rendition=Web&searchType=External","title":"records.tceq.texas.gov","pdf_page":1,"published":"2026-02-20","retrieved_at":"2026-09-17T04:47:16.203425+00:00","sha256":"327ea44681d8e9659f0fe7d8ed00a497752b88788077204ab6e23d8f59f47391","source_family":"public_primary_identity_source","as_of":"2026-02-20"}]}],"status_updates":[],"independent_audit":false,"assigns_building_identity":false,"assigns_power":false}},{"id":"national-power03::nfpr03-union-county-service","subject_id":null,"entity_name":"Z Squared Union County Campus","operator_code":null,"reported_value":8000,"reported_unit":"kVA","kind":"interruptible_capacity_access_rights","scope":"campus_access_agreement","electrical_extent":"seller_held_utility_agreement_access_rights","comparison":"up_to","upper_value":null,"qualifier":"Native 8,000 kVA interruptible service only. Seller holds the ESA; target rights arise via Power Access Agreement. Entergy assignment consent has not been obtained. The source parenthetical 8.0 MW is not a conversion or additional observation.","temporal_role":"access_rights_reported_in_dated_filing","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1759186/000118518526003984/zsqr8k091426.htm","title":"z-squared-union-county-2026","pdf_page":null,"published":"2026-09-14","retrieved_at":"2026-09-18T03:52:34.495513+00:00","sha256":"1ee3aa03ce1e064f7d7b7775b46be5e14a0fbad8770d25d36f30109709d6f8a3","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Item 2.01: asset, access rights, pending consent and development target","text_lines_1_based":[147,154],"text_character_span":[5547,6471],"normalized_text_character_span":[5547,6471]},{"heading":"Item 1.01: transaction closing date, not power effective date","text_lines_1_based":[104,113],"text_character_span":[2788,3191],"normalized_text_character_span":[2788,3191]},{"heading":"Item 1.01: September 8 Power Access Agreement and parties","text_lines_1_based":[133,138],"text_character_span":[4439,4835],"normalized_text_character_span":[4439,4835]}],"text_sha256":"69e589de6008e5d15677393965e7db095fad8d560047ba1086c0037d49227501","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-09-14","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-09-14","sec_filing_date":"2026-09-14","document_period_end":null,"event_dates":[{"date":"2026-09-08","role":"transaction_and_power_access_agreement","quantity_effective_date":false}],"forecast_target_period":null,"non_additive_group":"union-county-access-and-future-mix","identity_state":"unresolved_no_record_association","correction_ids":["C07-union-native-kva-access-rights-and-future-mix"],"source_parenthetical_context_only":"approximately 8.0 MW","assignment_consent_obtained":false,"source_observation_id":"nfpr03-union-county-service","dimension":"apparent_power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"national-power03::nfpr03-union-county-future","subject_id":null,"entity_name":"Z Squared Union County Campus","operator_code":null,"reported_value":150,"reported_unit":"MW","kind":"mixed_utility_generation_development_target","scope":"campus","electrical_extent":"utility_and_on_site_generation","comparison":"up_to_approximately","upper_value":null,"qualifier":"Up to approximately 150 MW AI-ready target mixes utility and on-site generation and requires additional arrangements, commitments, finance, permits and construction. Not current facility demand or IT capacity.","temporal_role":"future_conditional_development_target","as_of":null,"as_of_basis":"No explicit effective date for this quantity. Report publication, event and forecast dates are separate.","period_start":null,"period_end":null,"measured":false,"catalog_action":"parent_reviewed_catalog_context","scalar_eligible":false,"selected_field":null,"unresolved_conflicts":["Physical host association remains unreviewed. No building field is selected."],"catalog_holds":{},"sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1759186/000118518526003984/zsqr8k091426.htm","title":"z-squared-union-county-2026","pdf_page":null,"published":"2026-09-14","retrieved_at":"2026-09-18T03:52:34.495513+00:00","sha256":"1ee3aa03ce1e064f7d7b7775b46be5e14a0fbad8770d25d36f30109709d6f8a3","source_family":"sec_filing","reuse_note":"public-record-facts","locators":[{"heading":"Item 2.01: asset, access rights, pending consent and development target","text_lines_1_based":[147,154],"text_character_span":[5547,6471],"normalized_text_character_span":[5547,6471]},{"heading":"Item 1.01: transaction closing date, not power effective date","text_lines_1_based":[104,113],"text_character_span":[2788,3191],"normalized_text_character_span":[2788,3191]},{"heading":"Item 1.01: September 8 Power Access Agreement and parties","text_lines_1_based":[133,138],"text_character_span":[4439,4835],"normalized_text_character_span":[4439,4835]}],"text_sha256":"69e589de6008e5d15677393965e7db095fad8d560047ba1086c0037d49227501","retrieval_time_basis":"filesystem_mtime_at_completed_transfer"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false,"date_known":"2026-09-14","date_known_role":"reported_in_dated_source; not claimed first disclosure","source_publication_date":"2026-09-14","sec_filing_date":"2026-09-14","document_period_end":null,"event_dates":[{"date":"2026-09-08","role":"transaction_and_power_access_agreement","quantity_effective_date":false}],"forecast_target_period":null,"non_additive_group":"union-county-access-and-future-mix","identity_state":"unresolved_no_record_association","correction_ids":["C07-union-native-kva-access-rights-and-future-mix"],"source_observation_id":"nfpr03-union-county-future","dimension":"power","catalog_review":{"reviewer":"Parent assistant","reviewed_at":"2026-09-18T04:37:00.761298+00:00","scope":"typed_catalog_only"}},{"id":"nyiso-queue:1760","entity_name":"iPark 84 Data Center Interconnection","operator_code":"1760","reported_value":150,"reported_unit":"MW","kind":"requested_peak_load_mw","scope":"interconnection_load_project","qualifier":"Source labels Peak MW load. A requested project peak, not metered demand or guaranteed service.","quantity_role":"requested_project_load_boundary_not_proven_facility_total","comparison":"equal","season":null,"reported_period":null,"temporal_role":"dated_load_record","as_of":"2026-08-31","as_of_basis":"Publication date not identified; actual retrieval remains separate.","period_start":null,"period_end":null,"measured":false,"source_status_note":"SRIS/SIS in Progress","generator_id":null,"proposed_date_native":"10-2028","classification":"data_center","classification_basis":"Native source label or bounded name screen; not an independent classification audit.","category":"load_research","location_context":{"address":null,"city":null,"county":"Dutchess","state":"NY","location_precision":"reported_county_and_electrical_point_of_interconnection_not_building"},"unresolved_conflicts":["No street/building location except where the project name explicitly supplies one. POI locations are not facility coordinates.","Queue status and proposed backfeed date do not prove data-center commissioning or actual demand.","Requests may be phases, uprates or alternative projects. Do not sum or divide them among buildings.","No exact code and primary street-address link to a mapped building established in this tranche."],"sources":[{"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-08312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1789147562327","title":"www.nyiso.com","pdf_page":null,"published":null,"retrieved_at":"2026-09-17T02:00:21.690302+00:00","sha256":"8158c0eb16ef93ce0a4f9f0dd8316d5680edbefbaeaab3758d7eded2e53c8e9b","source_family":"iso_load_interconnection_queue","reuse_note":"NYISO copyright. Public source, no open license granted. Extract factual quantities with attribution; raw documents and page renders retained for research only, not licensed republication.","archive_member":null,"archive_member_sha256":null,"sheet":"Load Projects","row":70,"quantity_cell":"E70"}],"review_type":"assistant_source_extraction","independently_verified":false,"included_in_building_totals":false,"count_as_building":false}]